Loading...
HomeMy WebLinkAboutNCG020511_Representative Outfall Status Renewal Request_20240913 FOR AGENCY USE ONLY NC ARO FRO MRO RRO WARO WIRO WSRO Division of Energy, Mineral, and Land Resources Land Quality Section Representative Outfall Status (ROS) Renewal Certification Form Please complete this form if you want to maintain current ROS designations. Directions: Print or type all entries on this certification form.Attach this form and a copy of the original ROS approval documentation to the Stormwater Upload Form. North Carolina General Statute 143-215.6E(i) provides that: Any person who knowingly makes any false statement, representation,or certification in any appl-cation,record, report, plan,or other document filed or required to be maintained under this Article or a rule implementing this Article . . . shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: Ell"" as an authorized representative, request renewal of the ROS designations currently granted to the subject facility No site or activity modifications that impact the characteristics of Stormwater discharges from the representative outfalls have occurred at the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true,complete, and accurate. Facility Name: s p4Uc c Pt rt rQ V .�}-2 e,y _Permit Number: AA-- 6 Q Z, 0 Sl Printed Name of Person Signing: f 011V cf -U-D f fJS<JIJ Title: XLIVI (Signs re er tee} (Date igned) NC ITHCAriCxIt! - Dapartment of Environmental OuaGft ROY COOPER Governor MICHAEL S,REGAN Secretary S.DANIEL SMITH NORTH CAROLINA Director Environmental Quality July 26,2019 Tony Johnson,Environmental Manager Vulcan Constructions Materials,LLC 11020 David Taylor Drive, Suite 400 Charlotte,NC 28262 Subject: NPDES Stormwater Permit Permit No.NCG020511 Representative Outfall Status Request Vulcan Construction Materials, LLC Spruce Pine Quarry,Mitchell County Dear Mr. Johnson: The Asheville Regional Office staff have reviewed your request dated April 3, 2019, for a determination that stormwater discharge outfall(SDO)002 be granted representative outfall status for stormwater outfall 005. Based on information and maps provided and a site inspection conducted on May 7,2019, we are approving this request. In accordance with 40 CFR §122.2 1(g)(7), you are authorized to sample outfall number 002 as a representative outfall. This approval is effective with the next sampling event. We also want to remind you that the permit still requires Qualitative Monitoring be performed at all SDOs,regardless of representative status. Please remember that any actions you initiate in response to benchmark exceedances as directed in the tiered response provisions of your permit must address all drainage areas represented by SDO 002, where appropriate. Please append this letter to your Stormwater Pollution Prevention Plan (SPPP) or permit to document that representative outfall status has been approved. If changes in drainage areas, structures, processes, storage practices, or other activities occur that significantly alter the basis of this approval, representative outfall status may no longer be valid. You should either resume sampling at all SDOs,or reapply to this office for representative outfall status based on updated information, If you have any questions or comments concerning this letter,please contact me at 828-296-4500. Sincerely, Stanley E. Aiken,PEG, Regional Engineer Land Quality Section Enclosure: Inspection Report cc: Bethany.Georgoulias@ncdenr.gov North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources F > Asheville Regional Office 1 2090 US.Highway 70 1 Swannanoa,North Carolina 28778 IQ N qTH CAFiOL1N0. aeperem�emmen�mnma� UUN 828.296.4500 Compliance Inspection Report Permit: NCG020511 Effective: 10/01/15 Expiration: 09/30/20 Owner: Vulcan Construction Materials LLC SOC: Effective: Expiration: Facility: Spruce Pine Quarry County: Mitchell 396 Granite Ln Region: Asheville Bakersville NC 28705 Contact Person: Tony Johnson Title: Phone: 704-547-7076 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): On-site representative Tony Johnson 704-547-7076 Related Permits: Inspection Date: 05/07/2019 Entry Time: 10:OOAM Exit Time: 11:15AM Primary Inspector: Shawna Riddle Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm water (See attachment summary) Page 1 of 3 Permit: NCG02051 t Owner-Facility:Vulcan Construction Materials LL.0 Inspection Date: 05/07/2019 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: Met with Tony Johnson and Jamie Freeman for the inspection.Annual inspection and for Representative Outfall Status (ROS).SWPPP is current,training has been conducted,and monitoring is being conducted as required. 3 total outfalls, old 001 is now 002(sampling point),001 new location is pit water sampling,003 is the same,005 will have no sampling and will have ROS and sampled from 002. Mine site is in compliance and looks good. Recommend granting ROS. I I I 1 I i i I i i Page 2 of 3 permit: NCG02051 i Owner-Facility:Vulcan Construction Materials LLC Inspection Date: 05/07/2019 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ #Does the Plan include a General Location(USGS)map? E ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? 0 ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ #Does the Plan include a BMP summary? 0 ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan(SPRP)? N ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? E ❑ ❑ ❑ #Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ #Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Qualitative MOnitorinug Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? N ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ #Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ #If the facility has representative outfall status,is it properly documented by the Division? 0 ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3