Loading...
HomeMy WebLinkAboutNCG020151_Supplemental Info Review (ROS Renewal)_20240913 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 9/13/2024 9:54:19 AM (Supplemental Submittal) Accept by bethany.georgoulias 9/23/2024 2:54:12 PM (Supplemental Info Submittal) 0 Outfalls 003, 008,and 009 are not in BIMS,so a monitoring suspension was not necessary. Updated BIMS to note Outfall 010 description with ROS. • The task was assigned to DEMLR Post-Construction Team 9/13/2024 9:54:20 AM • bethany.georgoulias reassigned the task to bethany.georgoulias 9/20/2024 5:02:49 PM pEQNC Stormwater - Supplemental Information Upload Submittal from 9/13/2024 Permit Information: Please provide specific permit details below. ................................................................................................................................................................................................................................................................................................................................................................................................... What Type of Permit? Choose one: * 0 NPDES Industrial or MS4 Permit 0 State Stormwater(Post-Construction)Permit Other Permit Number* NCG020151 Begins with"SW","NCG",or"NCS' What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact. the Primary Contact? Central Office * Washington Regional Office(Attn: Carl Dunn) Wilmington Regional Office(Attn:Christine Hall) ................................................................................................................................................................................................................................................................................................................................................................................................. Facility Name* Enka Quarry For NPDES permits Owner/Operator* Vulcan Materials Company County: Buncombe SubmitterName:* Tonyjohnson Who is submitting this information? E-mail Address:* johnsonto@vmcmail.com Phone Number* 7045477076 Additional E-mail for johnsonto@vmcmail.com Submittal (Optional) Confirmation: NPDES Permit Information Uploads Choose file type and upload attachment(Reviewer may remove unnecessary submittals) ...................................................................................................................................................................................................................................... File Type* Representative Outfall Status Renewal Request File Upload Click the upload button,or drag and drop files to attach Enka ROS Renewal Form.pdf 25.06KB Enka ROS.pdf 37.49KB Only PDF files are accepted. ............................................................................................................................................................................. Is this project funded QQ No with ARPA grant Q Yes funds?* Uploads contain NO Confidential YES Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)]. Notes about the attachments: * By checking the box and signing box below, I certify that: o I have given true,accurate,and complete information on this form; o I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act) o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* Tony johnson Signature: arm rl o&-Y-Mw Date Submitted: 09/13/2024 Initial Review Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary. NCG020151 Who needs a Copy?* Reviewer selections will only be required for offices checked here. Central Office Staff Regional Office Stormwater Contact State Stormwater RO Staff No Copy Needed Review Date* 09/23/2024