Loading...
HomeMy WebLinkAbout20071967 Ver 1_More Info Received_20080115. U11NZ o~-tgto't Wetland and Natural Resource Consultants, Inc. January 8, 2008 To: N.C. Division of Water Quality Attn: Ms. Cyndi Karoly 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27604 Re: Mr. Pete's -Additional Information Henderson County, NC DWQ Project # 07-1967 Dear Ms. Karoly, N.C. Division of Water Quality Attn: Mr. Kevin Barnett 2090 U.S. Highway 70 Swannanoa, NC 28778 ~i,4N ~ ~ 2003 r~cP'~t ~lh~ ~ Y r n.•~~ r;ri 17'eE i ~ ~11 ./ 7 h~ . ~r`~T This letter is in response to your Request for More Information letter dated December 13, 2007 regarding the project known as Mr. Pete's Convenience Store in Henderson County, NC. Below we have addressed the issues listed in your request. . Information Requested: 1. Purpose of Proposed Work In your submitted explanation of the proposed work; you state that the work was "necessary" to protect the "building and parking lot. " Impact Justification (Avoidance and Minimization) Under Section Vll of your application you stated that the activity was "necessary to stabilize the bank of a stream adjacent to a parking lot and building. Only the area adjacent to these features was stabilized. " At the time of the issued Notice of Violation, rip-rap extended far beyond the paved area to beyond where the Car-Wash facility was later constructed. You must explain why "stream bank erosion protection" was needed for a facility which did not exist. The reach of stream bank that was stabilized with rip-rap, was eroding at the time of stabilization. To prevent further bank erosion and stream instability Canton Office PO Box 882 Canton, NC 28716 828-648-8801 828-648-8802 Fax . r the reach was stabilized. Please see Attachment #1- Mr. Pete's Pictures. These are before and after pictures taken from near the middle of the site. The section in question (adjacent to the car wash) was eroding, and threatening the structure as seen from Photo Point #2. My understanding is this was the reach that was originally permitted. 2. stormwater Under Section X of your application you state that the addition of rip-rap Stabilization would only increase the impervious area by a minimal amount. As this site is near 90% impervious some form of stormwater collection and treatment must be retrofitted in order to protect existing surface water standards. We are working on a plan for on site stormwater management. Because of space constraints we could not develop this plan within the time allowed. We would like to request an extension to prepare a plan without having to re-apply. Please call me anytime if you need further clarification of these issues. Best Regards, ~ ~ ~~ J ,; ~~~ Neill Yelverton 828-712-9613 Canton Office PO Box 882 Canton, NC 28716 828-648-8801 828-648-8802 Fax 2 Attachment #1 Mr. Pete's (Henderson County, NC) Photo Point 1 (Looking North) Photo Point 2 (Looking South) Canton Office PO Box 882 Canton, NC 28716 828-648-8801 828-648-8802 Fax Canton Office 4 PO Box 882 Canton, NC 28716 828-648-8801 828-648-8802 Fax Photo Point #1 -Stream Bank Failure Photo Point #1 -Stream Bank now stabilized with Rip-Rap Canton Office PO Box 882 Canton, NC 28716 828-648-8801 828-648-8802 Fax Photo Point #2 -Stream Bank Failure Photo Point #2 -Stream Bank now stabilized with Rip-Rap