Loading...
HomeMy WebLinkAboutSW6231105_Response To Comments_20240918 wOOten 120 N. Boylan Avenue Raleigh, NC 27603 (919)828-0531 HILTON HEIGHTS 72 UNIT RELOCATION ROBESON COUNTY LUMBERTON, NORTH CAROLINA SW6231105 1. Prior Comment 3-'As designed,this project does not meet Runoff Treatment (defined in ISA NCAC 0211.1002(43)and required per 1 SA NCAC 02H.1003(3)(a))... Please revise as needed." Second Review Cornmeal The submittal items indicote 16,298 sf of BUA are not being captured and treated in the SCM.Some,if not all,of this BUA(particularly the future BUA that will be used for the proposed buildings)should be able to be captured and directed to the SCM for treatment If the uncaptured BUA is reduced to the maximum extent practicable and there are still areas of uncaptured net BUA,the uncaptured areas of the site can be permitted as a low-density area(provided that the area meets the low-density requirements).Please revise the submittal materials as needed. Please sec the drainage area snip below.The delineated drainage area indicates that portions of the road and proposed building are uncaptured by the SCM.The response to E North Cardin r)eptrtmmr of rrn p,aax Ironmenttl Qo.ltr ,of rrwrgy.Nin a rdlrnd Wwur crs SIT North!Whimsy String IN/►al Service Center I!Ark"Norm Carolw 2709 1612 9197079700 comments provided by the engineer can be found below the drainage area snip.It is noted that the layout is conceptual,however,when plans are permitted,it is an approval of the BIJA/drainage areas as shown.Note the following permit conditions: No person or entity.including the permittee,shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans,the permittee shall submit to the Director,and shall have received approval for modified plans,specifications,and calculations including,but not limited to.those listed helms.. • Any modification to the approved plans and specifications. regardless r f size including the SCM(s),BUA.details.etc. • Redesign or addition to the approved amount of BUA or to the drainage area. • The construction of any allocated future BUA. Please maximize the amount of BUA that is directed to the SCM.if not all BUA can be directed to the SCM,the uncaptured areas of the site can be permitted as a low- density area(provided that the area meets the low-density requirements).Revise the package as needed. Wooten 120 N. Boylan Avenue Raleigh, NC 27603 (919)828-0531 511 - - 11, o livi ig:=MV,104411i 1 i. IF- El C , •. Per our conversation with NCDEQ reviewer Michael Lawyer,the previous submittal shows a Phase II layout that was 100%conceptual. A portion of this Phase II layout was not included in the delineated drainage area to the SCM because we did not anticipate it physically being able to discharge to it due to limited topography. The outline of the Phase II Layout has been removed from the drainage area plan set to avoid confusion and a maximum of 82,502 SF/1.89 AC has been accounted for In the current SCM design as"Future BUA". If for some reason the BUA proposed in Phase II exceeds this maximum impervious area or portions of it will not be routed to permitted SCM,an additional SCM will be designed as part of that phase to meet current regulations. There have been several conversations between The Wooten Company and NCDEQ.There may be some missing information between those conversations.To clarify,there was a conceptual future phase layout shown in the Stormwater Report on the submittal dated March 5th.After receiving comments on June 3rd and subsequent conversation,the future layout was removed. In the July 1st submittal,the future layout is not shown in the Stormwater Report.The snip above shows a small section of the proposed (not future) development which was not able to be captured and conveyed into the SCM due to the topography of the site.This area is now within a low density drainage area, refer to comment#2. It is understood that in the event that the future development is completed,it must not exceed the permitted future BUA amount and that it must drain to the SCM proposed.If not,additional SCMs must be permitted to cover the BUA. 2. Prior Comment 7.b.i. - "...Drainage Areas Page... Lines 3-4- See earlier comment/'See earlier comment. If you are adding a low-density drainage area to this project,you need to include the low-density drainage area on the Drainage Areas Page and the Low-Density Page of the form. NOTE: Don't forget to exclude the on-site surface water area from the low-density area.. ‘Iv JLP L n 120 N. Boylan Avenue Raleigh, NC 27603 (919)828-0531 In earlier submittals we had proposed a low density drainage area but in conversations with Jim Farkas we misunderstood his direction and thought that he was directing us not to include a low density area unless directed to by NCDEQ. Based on this comment and my discussion this week with Mike Lawyer we understand the need for adding a low density drainage area to the application and EZ-Form.These have been added. Please see revised documents. The areas of development in this low density drainage area follow requirements with dispersed flow towards the right of way where it reaches vegetated conveyance ditches. We understand that this would be the last review cycle and a lot of discussions have happened,if you need clarification,please feel free to reach out to clarify any questions you may have. 3. Please provide a Response to Comments letter indicating, in a point-by-point manner,how each of the above comments has been addressed.This item is required per 15A NCAC 02H .1042(3)(b). Noted. Responses are included. 4. Provide PDFs of all revisions, 2 hardcopies of revised plan sheets, 1 hardcopy of other documents, and a response to comments letter briefly describing how the comments have been addressed. Noted. Hard copies and pdfs will be provided as requested. Thank you, Please reach out to Justin Bright,jbright@thewootencompany.com,with any questions.