Loading...
HomeMy WebLinkAboutSW3240805_Design Calculations_20240913 SITEWORK CALCULATIONS DRAKE ROAD FLEX I OFFICE I RETAIL (DRAKE ROAD, MIDLAND, NC) Prepared by: JONES CIVIL DESIGN Civil Engineering I Land Solutions "From Conception to Completion" **VETERAN-OWNED** (704)412-8523 www.ionesCivilDesign.com ,`` 01111 e e e,,,�,, ```i�`l l l l e e„/��'' %%.` .\H CARD ,,,, .`•, 0 N CARD '', /i g •. ........ �,' ', _.-z°..• •.,tiy , ;moo;•OF Essio••.. I , 04 • g- c JONES CIVIL% = = Q AL ' . DESIGN, P.C. ' z = c ' , /~ C-3859 :• o .: 34936 •• ','.•.••• ,;••.',Q- :.,In>\;�NGINEE..••p '',,'''!, eA cP`%. .,,,,,,VA;I-C-:`••%`31Mltall DRAKE ROAD FLEX I OFFICE I RETAIL SEDIMENT (SKIMMER / TRAP) DESIGN "RISER" (SEDIMENT) BASIN WORKSHEET DESCRIPTION: DRAKE ROAD FLEXIOFFICEIRETAIL (RISER BASIN #1) Drainage Area to Basin (A) = 3.44 ac. Disturbed Area to Basin (Ad) = 1.23 ac. Weighted Runoff Coefficient (c) = 0.59 Required Basin Volume = 2214.00 ft3 =Ad x 1,800 Provided Volume (at 531.00)ft= 15386.50 ft3 (see table, below) ELEVATION AREA INC. VOLUME ACC. VOLUME 528 3,293 ft2 0.00 ft3 0.00 sq. ft. 529 4,485 ft2 3889.00 ft3 3889.00 sq. ft. 530 5,735 ft2 5110.00 ft3 8999.00 sq. ft. 531 7,040 ft2 6387.50 ft3 15386.50 sq. ft. 532 8,403 ft2 7721.50 ft3 23108.00 sq. ft. 533 9,822 ft2 9112.50 ft3 32220.50 sq. ft. SPILLWAY ANALYSIS 10-yr Flow Into Basin (Q10) = 13.82 cfs = (c*I*A); Where"I"=6.86 in/hr Proposed Spillway Elevation = 531.00 ft Proposed Spillway Width (W) = 15.00 ft Flow Height Over Spillway(h) = 0.46 ft = [Q10/ (3 *W)]213 TRAPPING EFFICIENCY (75% Trapping Efficiency Per the Barfield and Clar Equation) Surface Area Required at Design Flow=435 * Q10 = 6012.96 ft2 Surface Area Provided at Design Flow (see table) = 7040.00 ft2 SKIMMER SIZING Volume = 2214.00 ft3 (Released Over 2.0 days) Table 6.64a(NCDENR) Flow (Qd) = (2214.00 ft3/ 2 days) = 1107 ft3/day Skimmer Size Head Chosen Skimmer Size = 2.00 in Thus, Head (H) = 0.167 ft 1.5in 0.125 ft Desired Orifice Diameter = [Qd/(2300 * (H)112)]112 = 1.09 in 2 in 0.167 ft Therefore, Use 1.0 in. Orifice 2.5in 0.208 ft 3 in 0.250 ft 4 in 0.292 ft 5 in 0.333 ft 6 in 0.417 ft 8 in 0.500 ft DRAKE ROAD FLEX I OFFICE I RETAIL STORM DRAIN (PIPE SIZING 0 rn asE a If), N M LO 0 N —I 0.) M 0.) LO N O) C.7 m N 6) N co N N L() N Lf) IL) Lf) Lf) Ld) E c) Nr N- C') co (A p Lo 0 N N V 'rp M M M pi pi pi N O C W Lf) Lf) Lf) Lf) Lf) Lf) N 0 °) N CO N N CO CON Q m CO m < U ai y - - - a a H 03 d a 6 0 6 z z J 0 — W W M 0 Tu C N 0) N ON. . I N 0 w (O Lf) L() Lf) M — ,fin I "I' CO LO O LT0 CO ( N: O M V O (o C _ (n O O O O O O C O G LV O a; O a; O O Y o `m i Lf) O V LO (0 CO V .0 O) CO Lf) O C C V — — N M 7 O Z a) - (o co (0 (o (0 O _ _ NNNNN O C C N- N- N- N- N- O G) 0C s O O O O O O C E 'C Lf) 11) Lf) Lf) Lf) O — F vG O w L rn Ca Ca a) O C 0 V O O O O O O ce U s _ a C N R CO V a) co a) L L O < O O O O OTs U O O co O O 0 '� a0 Lc) Lf) L() r toV C e J O O O O O O : u) V N I— 0 00 N N a) +s. N (.0N CO O } C On 2 O M r O r- Lf) J Lf) O O) N M J - I, a t O O O Lf) O V 0 C O Lf) N CO Lf) (0 a) w r W CO r W Q C Lf) LNf) LL() LNf) Lf) Lf) i a) t O O Lf) O O Lf) N C V N- COa0 - r CO (b (r (b (b C N N N N N N O Lf) L() L() L() L() L() co O < To y NNNNNN O �' O CDO CD O V C a O O O O O O (N + c F U U U U U U E a) LO LO C N C N N N COC J (n - O R. O W (O co v- co CO CO 'I' U) II N N CM C CIa) a) a) a) a) a) 'Fs — faf1 faf1 fa faZ C ,fRY a a a a a a c c LL (13 a) W L Co N CO NI. LA tD i— O 0 J Z d 7 0 W_ U)cc 0 II Oo_ ix s a_v 133J `3ZIS dVddld 0GP et M N a- O moo-;____ ee --� i 00 th' /:' • ....‘ ..II Mi __ • o 111. id t N MEI 1:11 °n\ 9c\ V _ < c W \ \� • � l \S ‹� . O=I . _ao~ \ Ed 'O _'O I' M-o re 0 '('‘)? 71i I UC l II � oo J � \ �_ 1O O n „to � Q CI -0 i ��% ��=1=-M U 2 cOD - --W_ `Q\\, 1 1 1 0 d ClO� '01-_ \ 1 II �0 O I 1 1 H N o a 57 y 0 \� 1- ' \1 0 + Q �0 \\ 1 W 00 �/ o II �G O 3 — cJ Z O N ---', 3 c3I wo_ J\` z o Z ut Q N � oQ VI I n Ce Dw M \ Lo g M 0 d m~ 0 03 4. II CI); Z 0 U I- G GO v w I- w N C� , w 1- p M • j Lwwn 3 VI(xW O O O Z , p0 dtjN w oam^ r Z Z N — a_o a , o w •-wm 00 ZZ II0/ 0 Mm CI I- a-Ti o ll U 0 Lt J Ce-O OINES MATT 19 EHOWS, NC N C 2810E LANE RIPRAP APRON NOMOGRAPH MA www.JonesCivilDesign.com MINIMUM TAILWATER Jcivii DESIGN PH: (704) 412-8523 CIVIL ENGINh6RlNC I LAND SOLUTIONS **V):r r:a►\ 0 w\):o** DRAKE ROAD FLEX I OFFICE I RETAIL END "C 1" DRAKE ROAD FLEX I OFFICE I RETAIL SWALE (OPEN CHANNEL) ANALYSIS OPEN-CHANNEL FLOW WORKSHEET PROJECT: DRAKE ROAD FLEX I OFFICE I RETAIL Description: DIVERSION TD-1 FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.26 in/hr DRAINAGE AREA ("A"): 0.66 ac RUNOFF COEFFICIENT("c"): 0.50 FLOW FROM DRAINAGE AREA (Q=c*I*A): 2.40 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 220.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.010 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Unvegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.038 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Wetted Hydraulic Calculated Allowable Velocity , Flow Rate Flow Flow Perimeter Radius V Shear Shear (Q) (D) (Af) ( Pw) ( R ) ( ) Stress Stress 2.40 cfs 0.58' 1.32 sq. ft. 4.20' 0.31 ft 1.82 fps 0.36 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: DRAKE ROAD FLEX I OFFICE I RETAIL Description: DIVERSION TD-2 FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.26 in/hr DRAINAGE AREA ("A"): 1.98 ac RUNOFF COEFFICIENT("c"): 0.60 FLOW FROM DRAINAGE AREA (Q=c*I*A): 8.62 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 393.00 ft CHANNEL BOTTOM WIDTH: 1.00 ft CHANNEL SLOPE: 0.010 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Unvegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.038 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Wetted Hydraulic Calculated Allowable Velocity , Flow Rate Flow Flow Perimeter Radius V Shear Shear (Q) (D) (Af) ( Pw) ( R ) ( ) Stress Stress 8.62 cfs 0.92' 3.46 sq. ft. 6.82' 0.51 ft 2.50 fps 0.57 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: DRAKE ROAD FLEX I OFFICE I RETAIL Description: SWALE "S-I" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.26 in/hr DRAINAGE AREA ("A"): 0.37 ac RUNOFF COEFFICIENT("c"): 0.45 FLOW FROM DRAINAGE AREA (Q=c*I*A): 1.21 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 183.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.015 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Fully Vegetated Perm. Liner(P300) MANNING'S n-VALUE: 0.034 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Wetted Hydraulic Calculated Allowable Velocity , Flow Rate Flow Flow Perimeter Radius V Shear Shear (Q) (D) (Af) ( Pw) ( R ) ( ) Stress Stress 1.21 cfs 0.38' 0.63 sq. ft. 2.91' 0.21 ft 1.93 fps 0.36 psf 8.00 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: DRAKE ROAD FLEX I OFFICE I RETAIL Description: SWALE "S-2" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.26 in/hr DRAINAGE AREA ("A"): 0.42 ac RUNOFF COEFFICIENT("c"): 0.60 FLOW FROM DRAINAGE AREA (Q=c*I*A): 1.83 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 160.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.015 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Fully Vegetated Perm. Liner(P300) MANNING'S n-VALUE: 0.034 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Wetted Hydraulic Calculated Allowable Velocity , Flow Rate Flow Flow Perimeter Radius V Shear Shear (Q) (D) (Af) ( Pw) ( R ) ( ) Stress Stress 1.83 cfs 0.46' 0.85 sq. ft. 3.39' 0.25 ft 2.14 fps 0.43 psf 8.00 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: DRAKE ROAD FLEX I OFFICE I RETAIL Description: SWALE "S-3" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.26 in/hr DRAINAGE AREA ("A"): 1.00 ac RUNOFF COEFFICIENT("c"): 0.65 FLOW FROM DRAINAGE AREA (Q=c*I*A): 4.72 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 176.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.015 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Fully Vegetated Perm. Liner(P300) MANNING'S n-VALUE: 0.027 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Wetted Hydraulic Calculated Allowable Velocity , Flow Rate Flow Flow Perimeter Radius V Shear Shear (Q) (D) (Af) ( Pw) ( R ) ( ) Stress Stress 4.72 cfs 0.62' 1.46 sq. ft. 4.41' 0.33 ft 3.24 fps 0.58 psf 8.00 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute DRAKE ROAD FLEX I OFFICE I RETAIL STORM WATER (HYDROGRAPHS) ROUTING Hydraflow Table of Contents Hydro-23049.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1 - Year Summary Report 3 Hydrograph Reports 4 Hydrograph No. 1, Rational, PRE-south 4 Hydrograph No. 2, Rational, PRE-north 5 Hydrograph No. 3, Combine, PRE-runoff 6 Hydrograph No. 4, Rational, POST-bypass-south 7 Hydrograph No. 5, Rational, POST-bypass-north 8 Hydrograph No. 6, Rational, DevelopedArea 9 Hydrograph No. 7, Reservoir, Basin #1 10 Pond Report - Basin #1 11 Hydrograph No. 8, Combine, POST-south 12 Hydrograph No. 9, Combine, POST-Runoff 13 10 - Year Summary Report 14 Hydrograph Reports 15 Hydrograph No. 1, Rational, PRE-south 15 Hydrograph No. 2, Rational, PRE-north 16 Hydrograph No. 3, Combine, PRE-runoff 17 Hydrograph No. 4, Rational, POST-bypass-south 18 Hydrograph No. 5, Rational, POST-bypass-north 19 Hydrograph No. 6, Rational, DevelopedArea 20 Hydrograph No. 7, Reservoir, Basin #1 21 Hydrograph No. 8, Combine, POST-south 22 Hydrograph No. 9, Combine, POST-Runoff 23 25 - Year Summary Report 24 Hydrograph Reports 25 Hydrograph No. 1, Rational, PRE-south 25 Hydrograph No. 2, Rational, PRE-north 26 Hydrograph No. 3, Combine, PRE-runoff 27 Hydrograph No. 4, Rational, POST-bypass-south 28 Hydrograph No. 5, Rational, POST-bypass-north 29 Hydrograph No. 6, Rational, DevelopedArea 30 Hydrograph No. 7, Reservoir, Basin #1 31 Hydrograph No. 8, Combine, POST-south 32 Hydrograph No. 9, Combine, POST-Runoff 33 100 - Year Summary Report 34 Hydrograph Reports 35 Hydrograph No. 1, Rational, PRE-south 35 Contents continued... Hydro-23049.gpw Hydrograph No. 2, Rational, PRE-north 36 Hydrograph No. 3, Combine, PRE-runoff 37 Hydrograph No. 4, Rational, POST-bypass-south 38 Hydrograph No. 5, Rational, POST-bypass-north 39 Hydrograph No. 6, Rational, DevelopedArea 40 Hydrograph No. 7, Reservoir, Basin #1 41 Hydrograph No. 8, Combine, POST-south 42 Hydrograph No. 9, Combine, POST-Runoff 43 IDF Report 44 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 POST-Runoff ■ V POST-south POST-bypass-north PRE-runoff Basi # 1,01. DevelopedArea PRE-north P E-sout OST-bypass-south Legend Hyd. Origin Description 1 Rational PRE-south 2 Rational PRE-north 3 Combine PRE-runoff 4 Rational POST-bypass-south 5 Rational POST-bypass-north 6 Rational DevelopedArea 7 Reservoir Basin#1 8 Combine POST-south 9 Combine POST-Runoff Project: Hydro-23049.gpw Friday, 03/29/2024 2 Hydrograph Return Period Recap Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Rational 4.547 6.882 7.578 8.510 PRE-south 2 Rational 7.913 11.98 13.19 14.81 PRE-north 3 Combine 1,2 12.46 18.86 20.77 23.32 PRE-runoff 4 Rational 1.122 1.699 1.870 2.101 POST-bypass-south 5 Rational 1.439 2.178 2.398 2.693 POST-bypass-north 6 Rational 7.424 11.24 12.37 13.90 DevelopedArea 7 Reservoir 6 0.022 0.028 0.030 0.032 Basin#1 8 Combine 4, 7 1.136 1.717 1.890 2.122 POST-south 9 Combine 5,8 2.575 3.895 4.288 4.815 POST-Runoff Proj. file: Hydro-23049.gpw Friday, 03/29/2024 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 4.547 1 5 1,364 PRE-south 2 Rational 7.913 1 5 2,374 PRE-north 3 Combine 12.46 1 5 3,738 1,2 PRE-runoff 4 Rational 1.122 1 5 337 POST-bypass-south 5 Rational 1.439 1 5 432 POST-bypass-north 6 Rational 7.424 1 5 2,227 DevelopedArea 7 Reservoir 0.022 1 10 1,991 6 530.35 2,220 Basin#1 8 Combine 1.136 1 5 2,327 4,7 POST-south 9 Combine 2.575 1 5 2,759 5,8 POST-Runoff Hydro-23049.gpw Return Period: 1 Year Friday, 03/29/2024 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 1 PRE-south Hydrograph type = Rational Peak discharge = 4.547 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 1,364 cuft Drainage area = 1.580 ac Runoff coeff. = 0.6 Intensity = 4.796 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 PRE-south Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 1 Time (min) 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 2 PRE-north Hydrograph type = Rational Peak discharge = 7.913 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,374 cuft Drainage area = 2.750 ac Runoff coeff. = 0.6 Intensity = 4.796 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 PRE-north Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 — 2.00 0.00 10.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 2 Time (min) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 3 PRE-runoff Hydrograph type = Combine Peak discharge = 12.46 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 3,738 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 4.330 ac PRE-runoff Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 14.00 - 14.00 12.00 - 12.00 10.00 - 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Time (min) Hyd No. 3 Hyd No. 1 Hyd No. 2 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 4 POST-bypass-south Hydrograph type = Rational Peak discharge = 1.122 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 337 cuft Drainage area = 0.390 ac Runoff coeff. = 0.6 Intensity = 4.796 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 POST-bypass-south Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 4 Time (min) 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 5 POST-bypass-north Hydrograph type = Rational Peak discharge = 1.439 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 432 cuft Drainage area = 0.500 ac Runoff coeff. = 0.6 Intensity = 4.796 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 POST-bypass-north Q (cfs) Hyd. No. 5-- 1 Year Q (cfs) 2.00 2.00 1.00 - - 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 5 Time (min) 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 6 DevelopedArea Hydrograph type = Rational Peak discharge = 7.424 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,227 cuft Drainage area = 3.440 ac Runoff coeff. = 0.45* Intensity = 4.796 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 *Composite(Area/C)=[(2.150 x 0.20)+(1.230 x 0.90)]/3.440 DevelopedArea Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 - - 2.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 6 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 7 Basin #1 Hydrograph type = Reservoir Peak discharge = 0.022 cfs Storm frequency = 1 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 1,991 cuft Inflow hyd. No. = 6 - DevelopedArea Max. Elevation = 530.35 ft Reservoir name = Basin #1 Max. Storage = 2,220 cuft Storage Indication method used. Basin #1 Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 8.00 i 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 -- 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 7 Hyd No. 6 111111111 Total storage used = 2,220 cuft Pond Report 11 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Pond No. 1 - Basin #1 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=530.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 530.00 5,735 0 0 1.00 531.00 7,040 6,376 6,376 2.00 532.00 8,403 7,711 14,086 3.00 533.00 9,822 9,102 23,189 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 15.00 1.25 0.00 0.00 Crest Len(ft) = 0.00 0.00 0.00 0.00 Span(in) = 15.00 1.25 0.00 0.00 Crest El.(ft) = 0.00 0.00 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 528.50 530.00 0.00 0.00 Weir Type = --- --- --- --- Length(ft) = 20.00 0.00 0.00 0.00 Multi-Stage = No No No No Slope(%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control.Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/Discharge Elev(ft) 3.00 T 533.00 2.00 532.00 1.00 531.00 0.00 530.00 0.000 0.008 0.016 0.024 0.032 0.040 0.048 0.056 0.064 0.072 0.080 Total Q Discharge(cfs) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 8 POST-south Hydrograph type = Combine Peak discharge = 1.136 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,327 cuft Inflow hyds. = 4, 7 Contrib. drain. area = 0.390 ac POST-south Q (cfs) Hyd. No. 8 -- 1 Year Q (cfs) 2.00 2.00 1.00 I 1.00 0.00 - L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 8 Hyd No. 4 Hyd No. 7 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 9 POST-Runoff Hydrograph type = Combine Peak discharge = 2.575 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,759 cuft Inflow hyds. = 5, 8 Contrib. drain. area = 0.500 ac POST-Runoff Q (cfs) Hyd. No. 9-- 1 Year Q(cfs) 3.00 3.00 2.00 I 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Time (min) Hyd No. 9 Hyd No. 5 Hyd No. 8 14 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 6.882 1 5 2,064 PRE-south 2 Rational 11.98 1 5 3,593 PRE-north 3 Combine 18.86 1 5 5,658 1,2 PRE-runoff 4 Rational 1.699 1 5 510 POST-bypass-south 5 Rational 2.178 1 5 653 POST-bypass-north 6 Rational 11.24 1 5 3,371 DevelopedArea 7 Reservoir 0.028 1 10 2,921 6 530.53 3,361 Basin#1 8 Combine 1.717 1 5 3,431 4,7 POST-south 9 Combine 3.895 1 5 4,084 5,8 POST-Runoff Hydro-23049.gpw Return Period: 10 Year Friday, 03/29/2024 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 1 PRE-south Hydrograph type = Rational Peak discharge = 6.882 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,064 cuft Drainage area = 1.580 ac Runoff coeff. = 0.6 Intensity = 7.259 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 PRE-south Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 1 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 2 PRE-north Hydrograph type = Rational Peak discharge = 11.98 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 3,593 cuft Drainage area = 2.750 ac Runoff coeff. = 0.6 Intensity = 7.259 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 PRE-north Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 12.00 12.00 10.00 - 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 2 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 3 PRE-runoff Hydrograph type = Combine Peak discharge = 18.86 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 5,658 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 4.330 ac PRE-runoff Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Time (min) Hyd No. 3 Hyd No. 1 Hyd No. 2 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 4 POST-bypass-south Hydrograph type = Rational Peak discharge = 1.699 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 510 cuft Drainage area = 0.390 ac Runoff coeff. = 0.6 Intensity = 7.259 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 POST-bypass-south Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 4 Time (min) 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 5 POST-bypass-north Hydrograph type = Rational Peak discharge = 2.178 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 653 cuft Drainage area = 0.500 ac Runoff coeff. = 0.6 Intensity = 7.259 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 POST-bypass-north Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 3.00 3.00 2.00 I 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 5 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 6 DevelopedArea Hydrograph type = Rational Peak discharge = 11.24 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 3,371 cuft Drainage area = 3.440 ac Runoff coeff. = 0.45* Intensity = 7.259 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 *Composite(Area/C)=[(2.150 x 0.20)+(1.230 x 0.90)]/3.440 DevelopedArea Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 6 Time (min) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 7 Basin #1 Hydrograph type = Reservoir Peak discharge = 0.028 cfs Storm frequency = 10 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 2,921 cuft Inflow hyd. No. = 6 - DevelopedArea Max. Elevation = 530.53 ft Reservoir name = Basin #1 Max. Storage = 3,361 cuft Storage Indication method used. Basin #1 Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 I- 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 -1 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 7 Hyd No. 6 111111111 Total storage used = 3,361 cuft 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 8 POST-south Hydrograph type = Combine Peak discharge = 1.717 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 3,431 cuft Inflow hyds. = 4, 7 Contrib. drain. area = 0.390 ac POST-south Q (cfs) Hyd. No. 8 -- 10 Year Q (cfs) 2.00 - 2.00 1.00 1.00 0.00 - L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 8 Hyd No. 4 Hyd No. 7 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 9 POST-Runoff Hydrograph type = Combine Peak discharge = 3.895 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 4,084 cuft Inflow hyds. = 5, 8 Contrib. drain. area = 0.500 ac POST-Runoff Q (cfs) Hyd. No. 9-- 10 Year Q(cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Time (min) Hyd No. 9 Hyd No. 5 Hyd No. 8 24 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 7.578 1 5 2,273 PRE-south 2 Rational 13.19 1 5 3,957 PRE-north 3 Combine 20.77 1 5 6,230 1,2 PRE-runoff 4 Rational 1.870 1 5 561 POST-bypass-south 5 Rational 2.398 1 5 719 POST-bypass-north 6 Rational 12.37 1 5 3,712 DevelopedArea 7 Reservoir 0.030 1 10 3,181 6 530.58 3,702 Basin#1 8 Combine 1.890 1 5 3,742 4,7 POST-south 9 Combine 4.288 1 5 4,461 5,8 POST-Runoff Hydro-23049.gpw Return Period: 25 Year Friday, 03/29/2024 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 1 PRE-south Hydrograph type = Rational Peak discharge = 7.578 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,273 cuft Drainage area = 1.580 ac Runoff coeff. = 0.6 Intensity = 7.993 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 PRE-south Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 8.00 8.00 6.00 - - 6.00 4.00 - - 4.00 2.00 - - 2.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 1 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 2 PRE-north Hydrograph type = Rational Peak discharge = 13.19 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 3,957 cuft Drainage area = 2.750 ac Runoff coeff. = 0.6 Intensity = 7.993 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 PRE-north Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 14.00 - 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 2 Time (min) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 3 PRE-runoff Hydrograph type = Combine Peak discharge = 20.77 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 6,230 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 4.330 ac PRE-runoff Q (cfs) Hyd. No. 3 -- 25 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 )Agillibl 6.00 3.00 3.00 #1. - 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Time (min) Hyd No. 3 Hyd No. 1 Hyd No. 2 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 4 POST-bypass-south Hydrograph type = Rational Peak discharge = 1.870 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 561 cuft Drainage area = 0.390 ac Runoff coeff. = 0.6 Intensity = 7.993 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 POST-bypass-south Q (cfs) Hyd. No. 4 -- 25 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 4 Time (min) 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 5 POST-bypass-north Hydrograph type = Rational Peak discharge = 2.398 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 719 cuft Drainage area = 0.500 ac Runoff coeff. = 0.6 Intensity = 7.993 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 POST-bypass-north Q (cfs) Hyd. No. 5-- 25 Year Q (cfs) 3.00 3.00 2.00 I 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 5 Time (min) 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 6 DevelopedArea Hydrograph type = Rational Peak discharge = 12.37 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 3,712 cuft Drainage area = 3.440 ac Runoff coeff. = 0.45* Intensity = 7.993 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 *Composite(Area/C)=[(2.150 x 0.20)+(1.230 x 0.90)]/3.440 DevelopedArea Q (cfs) Hyd. No. 6 -- 25 Year Q (cfs) 14.00 - - 14.00 12.00 - 12.00 10.00 - 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 6 Time (min) 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 7 Basin #1 Hydrograph type = Reservoir Peak discharge = 0.030 cfs Storm frequency = 25 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 3,181 cuft Inflow hyd. No. = 6 - DevelopedArea Max. Elevation = 530.58 ft Reservoir name = Basin #1 Max. Storage = 3,702 cuft Storage Indication method used. Basin #1 Q (cfs) Hyd. No. 7 -- 25 Year Q (cfs) 14.00 - 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 -1 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 7 Hyd No. 6 111111111 Total storage used = 3,702 cuft 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 8 POST-south Hydrograph type = Combine Peak discharge = 1.890 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 3,742 cuft Inflow hyds. = 4, 7 Contrib. drain. area = 0.390 ac POST-south Q (cfs) Hyd. No. 8 -- 25 Year Q (cfs) 2.00 2.00 r 1.00 1.00 0.00 -- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 8 Hyd No. 4 Hyd No. 7 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 9 POST-Runoff Hydrograph type = Combine Peak discharge = 4.288 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 4,461 cuft Inflow hyds. = 5, 8 Contrib. drain. area = 0.500 ac POST-Runoff Q (cfs) Hyd. No. 9-- 25 Year Q(cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Time (min) Hyd No. 9 Hyd No. 5 Hyd No. 8 34 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 8.510 1 5 2,553 PRE-south 2 Rational 14.81 1 5 4,443 PRE-north 3 Combine 23.32 1 5 6,996 1,2 PRE-runoff 4 Rational 2.101 1 5 630 POST-bypass-south 5 Rational 2.693 1 5 808 POST-bypass-north 6 Rational 13.90 1 5 4,169 DevelopedArea 7 Reservoir 0.032 1 10 3,513 6 530.65 4,158 Basin#1 8 Combine 2.122 1 5 4,143 4,7 POST-south 9 Combine 4.815 1 5 4,951 5,8 POST-Runoff Hydro-23049.gpw Return Period: 100 Year Friday, 03/29/2024 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 1 PRE-south Hydrograph type = Rational Peak discharge = 8.510 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,553 cuft Drainage area = 1.580 ac Runoff coeff. = 0.6 Intensity = 8.977 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 PRE-south Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 10.00 - 10.00 8.00 8.00 6.00 - 6.00 4.00 - 4.00 2.00 2.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 1 Time (min) 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 2 PRE-north Hydrograph type = Rational Peak discharge = 14.81 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 4,443 cuft Drainage area = 2.750 ac Runoff coeff. = 0.6 Intensity = 8.977 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 PRE-north Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 2 Time (min) 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 3 PRE-runoff Hydrograph type = Combine Peak discharge = 23.32 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 6,996 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 4.330 ac PRE-runoff Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Time (min) Hyd No. 3 Hyd No. 1 Hyd No. 2 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 4 POST-bypass-south Hydrograph type = Rational Peak discharge = 2.101 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 630 cuft Drainage area = 0.390 ac Runoff coeff. = 0.6 Intensity = 8.977 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 POST-bypass-south Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 3.00 3.00 2.00 I 2.00 V 1.00 1.00 7/- 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 4 Time (min) 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 5 POST-bypass-north Hydrograph type = Rational Peak discharge = 2.693 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 808 cuft Drainage area = 0.500 ac Runoff coeff. = 0.6 Intensity = 8.977 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 POST-bypass-north Q (cfs) Hyd. No. 5 -- 100 Year Q (cfs) 3.00 3.00 2.00 I 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 5 Time (min) 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 6 DevelopedArea Hydrograph type = Rational Peak discharge = 13.90 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 4,169 cuft Drainage area = 3.440 ac Runoff coeff. = 0.45* Intensity = 8.977 in/hr Tc by User = 5.00 min IDF Curve = Concord.IDF Asc/Rec limb fact = 1/1 *Composite(Area/C)=[(2.150 x 0.20)+(1.230 x 0.90)]/3.440 DevelopedArea Q (cfs) Hyd. No. 6 -- 100 Year Q (cfs) 14.00 - 14.00 12.00 12.00 10.00 - 10.00 8.00 - 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 6 Time (min) 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 7 Basin #1 Hydrograph type = Reservoir Peak discharge = 0.032 cfs Storm frequency = 100 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 3,513 cuft Inflow hyd. No. = 6 - DevelopedArea Max. Elevation = 530.65 ft Reservoir name = Basin #1 Max. Storage = 4,158 cuft Storage Indication method used. Basin #1 Q (cfs) Hyd. No. 7 -- 100 Year Q (cfs) 14.00 - 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 -' 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 7 Hyd No. 6 111111111 Total storage used = 4,158 cuft 42 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 8 POST-south Hydrograph type = Combine Peak discharge = 2.122 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 4,143 cuft Inflow hyds. = 4, 7 Contrib. drain. area = 0.390 ac POST-south Q (cfs) Hyd. No. 8 -- 100 Year Q(cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 1- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 8 Hyd No. 4 Hyd No. 7 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Hyd. No. 9 POST-Runoff Hydrograph type = Combine Peak discharge = 4.815 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 4,951 cuft Inflow hyds. = 5, 8 Contrib. drain. area = 0.500 ac POST-Runoff Q (cfs) Hyd. No. 9 -- 100 Year Q(cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Time (min) Hyd No. 9 Hyd No. 5 Hyd No. 8 44 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Friday,03/29/2024 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 64.6880 13.0000 0.9002 2 66.7847 12.4000 0.8642 3 0.0000 0.0000 0.0000 5 75.2703 13.0000 0.8421 10 71.9699 12.4000 0.8031 25 61.9247 11.0000 0.7384 50 56.4944 10.1000 0.6971 100 50.2401 9.0000 0.6526 File name:Concord.IDF Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 4.80 3.85 3.22 2.78 2.45 2.19 1.98 1.81 1.67 1.55 1.45 1.36 2 5.66 4.55 3.82 3.31 2.92 2.62 2.38 2.18 2.02 1.88 1.76 1.65 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.60 5.37 4.55 3.96 3.52 3.17 2.89 2.66 2.46 2.30 2.15 2.03 10 7.26 5.93 5.04 4.41 3.93 3.55 3.25 2.99 2.78 2.60 2.45 2.31 25 7.99 6.54 5.59 4.90 4.39 3.99 3.66 3.40 3.17 2.98 2.81 2.66 50 8.51 6.98 5.97 5.26 4.73 4.31 3.97 3.69 3.45 3.25 3.07 2.92 100 8.98 7.35 6.31 5.58 5.03 4.60 4.25 3.96 3.72 3.51 3.33 3.17 Tc=time in minutes.Values may exceed 60. Precip.file name:T:\HYDRAFLOW\rainfall files\NC\Concord.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.90 3.50 0.00 4.40 5.10 6.00 6.80 7.60 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DRAKE ROAD FLEX I OFFICE I RETAIL DRAINAGE AREA MAP(S) SEE THE FUL-L--SIZE PI-AN SHEET C6.7