Loading...
HomeMy WebLinkAboutSW3240805_Supplement-EZ Form_20240913 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Drake Road Retail Office Flex 2 Project Area(ac) 3 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) N/A _ 8 Will the vegetated setback remain vegetated? N/A _ 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 1 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: C.Matthew Jones,P.E.(Principal Engineer) 28 Organization: Jones Civil Design,P.C. 29 Street address: 1019 Thornsby Lane 30 City,State,Zip: Matthews,NC 28105 31 Phone number(s): (704)412-8523 32 Email: Matt@JonesCivilDesign.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer 00111111 Hilo liek CA • r Signature of Designer • SEAL 34936 ' or, A, elk iritjipti Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED (DRAINAGE AREA INFORMATION Entire Site 1 _4 Type of SCM N/A Prop.Wetland_ 5 Total drainage area(sq ft) 188,615 150282 6 Onsite drainage area(sq ft) 130,836 102366 7 Offsite drainage area(sq ft) 57779 48136 8 Total BUA in project(sq ft) 5553 54048 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) New BUA not on subdivided lots(subject to 10 permitting)(sf) 49519 sf 11 Offsite BUA(sq ft) 5553 sf 4529 sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) 17983 sf -Sidewalk(sq ft) 1776 sf -Roof(sq ft) 22600 sf -Roadway(sq ft) 7160 sf -Future(sq ft) -Other,please specify in the comment box below(sq ft) _ New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 permitting)(sq ft) 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 3% 36% 19 Design storm(inches) 1.0 in 1.0 in 20 Design volume of SCM(cu ft) N/A 4745 cf 21 Calculation method for design volume Rational Rational ADDITIONAL INFORMATION I _ Please use this space to provide any additional information about the 22 drainage area(s): STORMWATER WETLAND 1 Drainage area number 1 2,Minimum required treatment volume(cu ft) 4745 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered No side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with Yes General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes STORMWATER WETLAND MDC FROM 02H.1054 18 Design volume of SCM(cu ft) 4745 19 Are the inlet(s)and outlet located in a manner that avoids short- Yes circuiting? 20 Are berms or baffles provided to improve the flow path? Yes 21 Does the orifice drawdown from below the top surface of the Yes permanent pool? 22 Does the wetland minimize impacts to the receiving channel from the Yes 1-yr,24-hr storm? 23 Is a trash rack or other device provided to protect the outlet system? Yes Elevations 24 Elevation,peak attenuation above temporary pool(if applicable) 532.00 (fmsl) 25 Elevation,temporary pool(top of the temporary inundation zone) 531.00 (fmsl) 26 Elevation,permanent pool(top of the shallow water zone)(fmsl) 530.00 27 Elevation,bottom of shallow water zone(fmsl) 529.00 28 Elevation,bottom of forebay deep pool at deepest point(at forebay 526.50 entrance)(fmsl) 29 Elevation,bottom of forebay deep pool at shallowest point(at forebay 527.00 exit)(fmsl) 30 Elevation,bottom of non-forebay deep pool at deepest point(fmsl) 526.00 Wetland 3 1:32 PM 8/24/2024 STORMWATER WETLAND Planting Zones 31 Area,total surface area of the SW wetland at temporary pool elev. 5,735.00 (sq ft) _ 32 Area,temporary inundation zone at temporary pool elev.(sq ft) 1,826.00 33 Area,shallow water zone at temporary pool elev.(sq ft) 2,514.00 34 Area,forebay at temporary pool elev.(sq ft) 829.00 35 Area,non-forebay deep pool at temporary pool elev.(sq ft) 566.00 36 Percent area provided,temporary inundation zone(should be 30- 32% 45%) 37 Percent area provided,shallow water zone(should be 35-45%) 44% 38 Percent area provided,deep pool(forebay)(should be 10-15%) 14% 39 Percent area provided,deep pool(non-forebay)(should be 5-15%) I 10% Depths and Outlet 40 Peak attenuation depth above temporary inundation zone(inches) 54 in 41 Temporary inundation zone depth(temporary pool to permanent 6 in pool)(inches) 42 Shallow water zone depth(permanent pool to bottom of wetland) 36 in (inches) 43 Depth,forebay at entrance(permanent pool to bottom of forebay 36 in entrance)(inches) 44 Depth,forebay at exit(permanent pool to bottom of forebay exit) 42 in (inches) 45 Depth,non-forebay deep pools(permanent pool to deep pool 48 in bottom)(inches) 46 If there is an orifice,diameter(inches) 1.25 in 47 If there is a weir,weir height(inches) 48 If there is a weir,weir length(inches) 192 in 49 Drawdown time for the temporary pool(days) 1.3 Soil and Plants 50 Soil amendment depth(inches) 51 Has a soil amendment specification been provided? Yes 52 Has a landscaping plan that meets SW Wetland MDC(12)been Yes provided? Please have someone fix the 53 Number of plants per 200 square feet(#)in the shallow water zone: 50 < DEQ spreadsheet to allow modification of this cell 54 Does the temporary inundation zone planting comply with SW Yes Wetland MDC(14)? 55 Are the dam structure and temporary fill slopes planted in non- Yes clumping turfgrass? 56 Will cattails be planted in the wetland? No ADDITIONAL INFORMATION 57 Please use this space to provide any additional information about the stormwater wetland(s): The cell for Line#53,above,does not work in the Excel file.Therfore,no selection can be made for that answer.Although,as shown on the plans (Sheet C3.2),there are 50 plants per 200 sq.ft.proposed in the shallow water zone. Wetland 4 1:32 PM 8/24/2024