HomeMy WebLinkAboutSW1240701_Supplement-EZ Form_20240913 SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1 Project Name _ New Sheetz Store-Asheville Airport
2 Project Area(ac) _ 11.49
3 Coastal Wetland Area(ac) _ 0
4 Surface Water Area(ac) 0
5_ Is this project High or Low Density? _ High
6 Does this project use an off-site SCM? No
COMPLIANCE WITH 02H.1003(4)
7 Width of vegetated setbacks provided(feet) 20
8 Will the vegetated setback remain vegetated? Yes
9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11 Infiltration System
12 Bioretention Cell
13 Wet Pond _
14 Stormwater Wetland
15 Permeable Pavement
16 Sand Filter
17 Rainwater Harvesting(RWH) _
18 Green Roof
19 Level Spreader-Filter Strip(LS-FS)
20 Disconnected Impervious Surface(DIS)
21 Treatment Swale _
22 ,Dry Pond - _ .
23 StormFilter _
24 Silva Cell
25 Bayfilter _ - 1
26 Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27 Name and Title: _ Ryan Gatewood,President
28 Organization: LE&D Professionals,PC
29 Street address: _ 110 Exchange Street,Suite B
30 City,State,Zip: _ Danville VA 24541
31 Phone number(s): 434-792-3680
32 Email: _ _ _ ratewood@landeng.com
Certification Statement:
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the
information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,
specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here.
Designer
``��1111111►10�``•‘‘ ,(H CAIQO�����i
ESS%� 40 0i
? 'oF ; y .
SEAL < gnat esigner
7 r 1V
•
731. 043527 o
,, ��C IqM....... 7/Q/?L7
f///t L11‘�, Date
DRAINAGE AREAS
1 Is this a high density project? Yes
2 If so,number of drainage areas/SCMs 3-Jan
3 Does this project have low density areas? No
4 If so,number of low density drainage areas 0 j
Is all/part of this project subject to previous rule
5 versions? No
CLICK TO LOAD FORM
DRAINAGE AREA INFORMATION Entire Site 1 2 3 4
Proprietary Device
4 Type of SCM (ADS Bayfilter) N/A N/A
5 Total drainage area(sq ft) 466528 234353 220414 11761
6 Onsite drainage area(sq ft) 408594 189051 207782 11761
7 Offsite drainage area(sq ft) 57934 45302 12632 0
8 Total BUA in inject(sq ft) 272250 sf 150282 sf 121968 sf sf
New BUA on subdivided lots(subject to permitting)
9 (sg ft) 272250 sf 150282 sf 121968 sf sf
New BUA not on subdivided lots(subject to
10 permitting)(sf) sf sf sf sf
11 Offsite BUA(sq ft) 21780 sf 10890 sf 10890 sf sf
12 Breakdown of new BUA not on subdivided lots: 0
-Parking(sq ft) 202660 sf 113850 sf 88810 sf sf
Sidewalk(sq ft) 4087 sf sf 4087 sf sf
-Roof(sq ft) 14956 sf sf 14956 sf sf
-Roadway(sq ft) 3225 sf sf 3225 sf sf
-Future(sq it), 25542 sf 25542 sf sf sf
-Other,please specify in the comment box
below(sq ft) _ sf _
New infiltrating permeable pavement on
13 subdivided lots(sq ft) _ sf sf sf sf
New infiltrating permeable pavement not on
14 subdivided lots(sq ft) sf sf sf sf
Existing BUA that will remain(not subject to
15 permitting)(sq ft) _ 29360 sf sf 29360 sf sf
16 Existing BUA that is already permitted(sq ft) sf sf sf sf
17 Existing BUA that will be removed(sq ft) _ sf sf sf sf
18 Percent BUA 54% 64% 55% 0%
19 Design storm(inches) 1.3 in 1.3 in 1.3 in 1.3 in
20 Design volume of SCM(Cu ft) 49798 cf 49798 cf
NC Design Volume i NC Design Volume
21 Calculation method for design volume Calculation Calculation
ADDITIONAL INFORMATION
elel ase use this space to provide any additional information about the
22 drainage area(s):
BAYFILTER
1 Drainage area number 1
2 Minimum required treatment volume(cu ft) 9966 cf
pENERAL MDC FROM 02H.1050
31 Is the SCM sized to treat the SW from all surfaces at build-out? Yes
4lIs the SCM located away from contaminated soils? Yes
5!What are the side slopes of the SCM(H:V)? N/A
6 Does the SCM have retaining walls,gabion walls or other engineered N/A
side slopes?
Are the inlets,outlets,and receiving stream protected from erosion
7 (10-year storm)? Yes
8 Is there an overflow or bypass for inflow volume in excess of the Yes
design volume?
9 What is the method for dewatering the SCM for maintenance? Pump(preferred)
10 If applicable,will the SCM be cleaned out after construction? N/A
11 Does the maintenance access comply with General MDC(8)? Yes
12 Does the drainage easement comply with General MDC(9)? Yes
13 If the SCM is on a single family lot,does(will?)the plat comply with No
General MDC(10)?
14 Is there an O&M Agreement that complies with General MDC(11)? Yes
15 Is there an O&M Plan that complies with General MDC(12)? Yes
16 Does the SCM follow the device specific MDC? Yes
17 Was the SCM designed by an NC licensed professional? Yes
BAYFILTER MDC FROM THE STORMWATER DESIGN MANUAL
18 If Volume Design is used,what is the volume from the drainage area
(cubic feet)?
19 Is an upstream detention used? _ Yes
20 Volume of the upslope detention system(cubic feet) 49798 cf
21 Percent of the design volume contained in the upslope detention 100%
system(%)
22 If Rate Based Sizing is used,for 1 inch or 1.5 inch(Coastal areas).
cfs
Water Quality flow rate for drainage area(cfs)
23 Number of cartridges _ _ 8
24 Cartridge height(inches) 22 in
No SHWT
25 SHWT elevation(fmsl) observed during
testing
26 Elevation of bottom of BayFilter vault(fmsl) 2098.43 _
27 Clearance from the SHWT(feet) >2'
28 BayFilter Media Flow Rate(GPM/ft2 of Media Surface) 23 gpm/sf
29 Does the system includes a sediment sump? _ Yes
30 If yes,the diameter of the sump(feet) 4 ft
31 If yes,the depth of the sump(feet) 2 ft
32 Time to drain the sump(hours) 48 hrs
33 Time to drain the BayFilter(hours) 26 hrs
34 Is an off-line flow splitting device used? No
35 Type of media used(EMC or GAC-metals) EMC
36 Will maintenance be performed by Certified Maintenance Providers Yes
per instructions?
ADDITIONAL INFORMATION
37 Please use this space to provide any additional information about the
BayFilter system(s):