Loading...
HomeMy WebLinkAboutSW1240701_Soils/Geotechnical Report_20240913 GeoTechnologies,Inc. • Geotechnical and Construction Materials Testing Services October 2, 2023 Mr. Ryan Gatewood,PE,PMP LE&D Professionals,PC 110 Exchange Street, Suite B Danville,Virginia 24541 Re: Report of Subsurface Investigation Proposed Sheetz—Asheville Regional Airport Fletcher,North Carolina GeoTechnologies Project No. 123-0773-EA Mr. Gatewood: GeoTechnologies, Inc. has completed the authorized subsurface investigation to evaluate site grading and foundation support considerations for a proposed Sheetz store and gas station which will be located at the southeast corner of the intersection of Airport Road and Airport Park Road in Fletcher, North Carolina. Subsurface conditions at the site were investigated by completing 22 soil test borings at the approximate locations indicated on the attached site plan, Figure 1. These borings were located in the field using a handheld Trimble GPS unit with coordinates estimated from the Henderson County GIS. The indicated boring locations should be considered approximate. State plane coordinates for the boring locations are presented on the attached Table 1. The borings were extended to depths of 7.5 to 20 feet below existing grade. Borings B-1 through B-16 were completed using an all-terrain vehicle mounted drill rig turning hollow stem augers. Soils were sampled at selected intervals using standard penetration testing designated in ASTM D-1586. Borings P-1 through P-6 were performed using hand auger equipment with dynamic cone penetrometer (DCP) testing in accordance with ASTM STP-399. This report presents the findings of the investigation and our recommendations for site grading and foundation support. SITE AND PROJECT INFORMATION The project site is located at the southeast corner of the intersection of Airport Road and Airport Park Road in Fletcher, North Carolina. Based on our review of aerial photographs, the property is currently developed as a parking lot for use by the Asheville Airport. Half the lot is asphalt and the other half gravel. Furthermore, a portion of the project area is wooded and is located at the end of a paved parking lot that will be expanded. The new project will include construction of a Sheetz store which will comprise 6,800 square feet and will be single story construction. Based on our experience with similar type structures, we understand that maximum column loads will be around 40 kips with wall loads of about 3 kips per linear foot (klf). In addition to the proposed building, pump canopies and the fuel tank will be located west of the proposed building. Parking and driveway areas will be constructed for the auto areas. Furthermore, the parking area to the south of the Sheetz will be expanded further southward. 3200 Wellington Ct., Ste. 108• Raleigh, NC 27615• Phone 919-954-1514•Fax 919-954-1428•www.geotechpa.com• License No.C-0894 Sheetz @ Asheville Airport October 2,2023 Page 2 SUBSURFACE CONDITIONS Generalized subsurface profiles prepared from the test boring data are attached to this report as Figures 2A through 2C to graphically illustrate subsurface conditions encountered at this site. More detailed descriptions of the conditions encountered at the individual test boring locations are then presented on the attached test boring records. Subsurface conditions on the site are characterized by the presence of topsoil, gravel or asphalt which generally extended to depths of about 4 to 6 inches below existing grade. The topsoil/asphalt/gravel was underlain natural soils that extended to depths of 6 to 20 feet below grade. Auger refusal was noted in boring B- 6 at a depth of about 7.5 feet below grade. The soils were comprised of silty sands, sandy clays and sandy silts. SPT Penetration resistances in the soils varied from 6 to 66 blows per foot(bpf). In the hand auger borings,DCP penetration resistances varied from 8 to in excess of 15 blows per increment(bpi). Groundwater was not encountered in the borings at the time of boring completion. Due to the fine grained near surface soils the site is subject to the development of temporarily higher perched groundwater conditions. Additionally,regional groundwater levels will fluctuate with seasonal and climatic changes and may be different at other times. LABORATORY TESTING Two samples were collected near boring B-13 and P-2 and transported to our laboratory for testing. Laboratory testing included natural moisture content testing (ASTM D-2216), Atterberg limits testing (ASTM D-4318), particle size distribution testing (ASTM D-6913), standard Proctor testing (ASTM D-698) and CBR (ASTM D-1883). The test results attached to the end of the report and summarized below: Laboratory Test Summary Table Atterberg Standard CBR Fines Moisture Sample Depth Limits Proctor (% passing Content (ft) LL PI 200) C/u) MDD OM 0.1" 0.2" Swell (pcf) (%) B-13 1-4 69 39 37.3 15.3 108.5 16.5 4.1 7.8 1.0 P-2 0.5-2.5 37 11 49.6 18.4 105.9 18.9 9.5 11.0 0.4 RECOMMENDATIONS The following recommendations are made based upon a review of the attached test boring data, our understanding of the proposed construction, and past experience with similar projects and subsurface conditions. Should site grading or structural plans change significantly from those now under consideration, we would appreciate being provided with that information so that these recommendations may be confirmed, extended, or modified as necessary. Additionally, should subsurface conditions adverse to those indicated by this report be encountered during construction,those differences should be reported to us for review and comment. Site Grading Considerations: Subsurface conditions on the site are characterized by relatively fine- grained soils which are sensitive to moisture content changes. Therefore, we recommend that site grading be completed during the warmer summer months of the year, if possible, when higher ambient air temperatures GeoTechnologies,Inc. www.geotechpa.com Sheetz @ Asheville Airport October 2,2023 Page 3 generally result in lower near surface moisture contents. Grading the site during the cooler winter months of the year will likely result in an increase in subgrade repairs Grading should begin with the removal of all asphalt, vegetation and topsoil from the building and pavement areas. Gravel may remain in-place if stable. Once stripping is completed, we recommend the site be proofrolled with a tandem axle loaded dump truck in the presence of a geotechnical engineer to identify areas which require repair. Any area which appears unsuitable in the opinion of the engineer should be undercut to firm bearing and backfilled with properly compacted structural fill as directed. Repair areas will need to be identified in the field as grading proceeds. In areas that will receive more than 5 feet of fill, some fill induced settlement will occur. In these areas we recommend establishing settlement points at the top of the fill section and having the project surveyor monitor those points on a weekly basis. Construction of foundations should be delayed until the fill induced settlements have subsided. This typically occurs in 30 to 60 days but should be verified by settlement monitoring. Compaction&Borrow Sources: The soils which exist on this site,with the exception of topsoil,will be suitable for reuse as structural fill provided they are moisture conditioned to within 2% of optimum moisture as necessary. If any off-site borrow materials are required to achieve grades,we recommend those materials consist of clayey or silty sands or low plasticity silts and clays with Unified Soil Classifications of SC, SM,ML, or CL. All fill material placed on the site should be compacted to not less than 95% of the standard Proctor maximum dry density except in the final foot where compaction should be increased to 98% of the standard Proctor maximum. All fill should be moisture conditioned to within 2% of optimum moisture content to facilitate compaction and to maintain stability of the fill section. We recommend density testing be performed on a full-time basis to verify that the recommended density percentages are achieved. Foundation Support Considerations: Based upon the borings data, the subsurface conditions at the site are suitable for support of the structures on a shallow foundation system. Careful inspection of foundation subgrades, including completing hand auger borings and dynamic cone penetration (DCP) testing will be required to properly evaluate the subgrades. Following proper site grading, foundations may be designed for a maximum allowable bearing pressure of 3,000 psf subject to the restriction that all column and wall footings have minimum dimensions of 24 and 16 inches, respectively. These foundations may bear at nominal depth beneath finished exterior grade except that a minimum embedment of not less than 24 inches is recommended for frost protection. All excavation foundation subgrades should be inspected by a geotechnical engineer to verify that suitable bearing conditions exist. Should any soft areas be identified, these areas can be repaired by undercutting to firm bearing material and backfilling to design bearing elevation with uniformly graded washed #57 or#67 stone. GeoTechnologies evaluated potential settlements utilizing the FHA procedure which is an empirical method correlating soil compressibility to material types and penetration resistances. The results of this analysis indicates that the anticipated 40-kip column loads will result in total settlements of less than one inch provided fill induced when supported on shallow spread footings designed for a contact pressure of 3,000 psf. Differential settlements are expected to be approximately one half the magnitude of the total settlement. The results of our settlement analysis are presented in the attached Figures 3 and 4. .,._ . GeoTechnologies,Inc. www.geotechpa.com Sheetz @ Asheville Airport October 2,2023 Page 4 We recommend that slab-on-grades be designed for an assumed subgrade modulus of 100 pci (for a one foot by one-foot area) assuming that all soils within the upper 12 inches are properly compacted to 98% of the standard Proctor maximum dry density. We recommend that any joints in the slab be cut relatively quickly, concurrently with finishing operations, to help control shrinkage cracking. Additionally, water/cement ratios should be kept relatively low to help reduce shrinkage cracking. We recommend that joint spacing be in accordance with guidelines presented in ACI and that the joints extend at least one third the slab depth to promote cracking along these joints. We recommend that foundations for the pump island canopies be designed for an allowable bearing pressure of 3,000 psf. The majority of the load on the canopies is likely uplift, so we anticipate that they would typically be oversized for uplift resistance. To evaluate resistance to uplift, we recommend assuming a soil unit weight of 110 pcf above the foundation, assuming that all backfill soils are properly compacted to 95% of the standard Proctor maximum dry density. The weight of the concrete within the foundations can be properly sized to provide any additional uplift resistance needed. Buoyant unit weights should be used below the ground water level. In order to evaluate resistance to sliding, GeoTechnologies recommends assuming a friction factor of 0.35 along the base of the foundations. A uniform ultimate passive resistance of 600 psf may be used for design. Tank Pit Construction: We understand that the project will include installation of below grade underground fuel tanks. We anticipate that the base of the tanks will likely extend to depths of as much as 15 to 20 feet below existing ground surface. Partially weathered rock (PWR) was not encountered, however, auger refusal was noted in boring B-6 at a depth of about 7.5 feet. For this reason, it may be possible that boulders or rock ledges are encountered during deep excavations. The contractor should be aware of this and have provisions in place for difficult excavations if encountered. Groundwater was not encountered in the test borings upon completion, however, it is possible that groundwater is encountered and dewatering may be required for the tank pit excavations. It may be possible to use pumps and sumps in the excavations; however means and methods of dewatering will be the responsibility of the contractor. Consideration should be given to designing the tanks to resist buoyancy assuming high perched groundwater could collect within the tank pit backfill. All OSHA regulations should be strictly adhered to when performing below grade excavation. Retaining Wall and Slope Considerations: If any segmental retaining walls are required to provide grade transitions,the on-site soils are not considered well suited for use as backfill material within the reinforced zone for walls over 5 feet in height. An acceptable off-site material would be quarry screenings for use in the reinforced zone of the wall. Other sources could be considered; however, testing will need to be performed on the selected materials to verify that they are suitable for this use. We recommend that any fill slopes on the site be constructed at angles of no steeper than 2.5H:1 V or flatter in order to provide for long-term stability during the wetter portions of the year. All fill materials placed in slopes should be compacted to a minimum of 95% of the standard Proctor maximum dry density all the way out to the slope face. Additionally, the slope should be quickly vegetated to help minimize erosion of the slope face. Pavement Design Considerations: CBR testing on a representative sample from the site indicated a CBR value of 4.1 to 11.0 percent for the onsite soils. If pavements are kept near current grade the expansive soils will need to be removed and replaced or chemically stabilized to provide subgrades suitable for pavement support. A minimum of 1.5 feet of separation needs to be maintained between the highly plastic clays and w. GeoTechnologies,Inc. www.geotechpa.com Sheetz @ Asheville Airport October 2,2023 Page 5 subgrade elevation. If provided with the anticipated traffic loading information and additional CBR testing on imported fill,we will be happy to provide a detailed pavement design. The most important factors affecting pavement life in the area of the site are the condition of the subgrade immediately prior to base course stone placement and post-construction settlement. We recommend that the subgrade of all pavement areas be proofrolled and that any yielding areas be identified and repaired prior to placement of the base course stone All subgrade soils should be compacted to a minimum of 98% of the standard Proctor maximum dry density immediately prior to base course stone placement. We recommend that all pavement areas be properly graded to promote runoff of water and to prevent ponding of water on the pavement surface which can lead to eventual saturation of the subgrade soils and the loss of pavement support. Consideration should also be given to installing French drains or strip drains behind curbs or landscaped areas to help prevent saturation of subgrades and base course stone. Seismic Design Considerations: In order to evaluate seismic design considerations for the project, GeoTechnologies utilized guidelines presented in the North Carolina Building Code which includes the International Building Code information in conjunction with the soil borings completed on this site. Based on this information, we recommend utilizing a site classification of "D" with respect to seismic design considerations. CLOSING GeoTechnologies, Inc. appreciates the opportunity to be of service on the phase of the project. Please contact us if you have any questions concerning this letter or if we may be of additional service on this or other projects. Sincerely, N ,, GeoTechnologies, Inc. ;\\pQ� E S�O��',, � a V SEAL Y V I .Z-d 25955 Mark R. Potratz,PE �•P NE•• NC License No. 25955 ''�9/r R. PD-cQ;P,` Attachments MRP/pr-dli .,._ . GeoTechnologies,Inc. www.geotechpa.com Sheetz,Inc. Re: Proposed Sheetz @ Asheville Airport September 29,2023 Page: 6 TABLE 1 Summary of Test Boring Coordinates Boring# State Plane Coordinates(ft) Northing Easting B-1 632621 947105 B-2 632608 947219 B-3 632584 947165 B-4 632561 947108 B-5 632549 947213 B-6 632608 947017 B-7 632562 947012 B-8 632514 947007 B-9 632580 946928 B-10 632552 946923 B-11 632484 947048 B-12 632512 947149 B-13 632501 947248 B-14 632558 947306 B-15 632614 947267 B-16 632644 947069 P-1 631988 947179 P-2 631878 947138 P-3 631813 947222 P-4 631722 947193 P-5 631679 947268 P-6 631586 947297 GeoTechnologies,Inc. www.geotechpa.com y, sheville REGIONAL AIRPORT 811111111111111111 MIIIIIism MI I■ I As COENCING.S ,LANN E. I I PRELIMINARY DESIGN 8-14 I NOT RELEASED FOR CONSTRUCTION 8 / 1 a^� I /// i - • 3 I 1 8-3 PROPOSED 30' ''''''''' fir , • ACCESS ROAD I ASHEVILLE ° :\ I REGIONAL AIRPORT ■tr 2 I -1�F�wl FLETCHER NORTH EVILLE NA CAROL 8- ` %/_� s\ rifir01171 . / I PROPOSED PARKING LOT ry --- — LLOTAL SPACES jPROPOSED PARKING LOT 8-g 190 TOTAL SPACES 'li 4, :i-' KEY PLAN = a� 7IlIIIIPl-hIIIII IIIIIIIIIIII.I-IIIIII I �PI-0I I I I I l -s', 8-: )\' _ i • • • _nl \ PARKING LOT REVISIONS !ice br : PARKING LOT ►� L((T�� Ill � lll � l �� � llllll � llllllllllll � lll �p� lll � l � ll � � REVISIONS w /� EXHIBIT 4 AIRPORT ROAD PROPOSED PARKING LOT J ACCESS ROAD - 2 woo.i....r.a�.�.. ..�.n o SCALE: c .'l NO, DATE , BY DESCRIPTION REVISIONS 0 DESIGNED BY: J.C.W. DRAWN BY: J.C.W. a CHECKED BY: J.M.M. G APPROVED BY: J.M.M. DATE: MARCH 2023 rii No STATE LICENSE 0 N.C.C•2450 PPROJECT NO. 2023.0157.01 0' 25' 50' 100' 7 SHEET NUMBER GRAPHIC SCALE IN FEET EX-04 Figure 1 Depth (Feet) GENERALIZED SUBSURFACE PROFILE LEGEND B- 1 B- 2 B- 3 B- 4 B- 5 B- 6 B- 7 B- 8 B- 9 . Topsoil 0 IN MN ° ..., Av. ... , Silty Sand 2 .. •;;. ..10 ° ° Gravel • • 1• 4...... 15 22 11....... 15 14.. 16....... ' 14 �000 Asphalt tom 4 • El •, 26 •, 26 41 •, 10 ,' 21 28 • 16 •• 22 17 Stone Base 6 j Low Plasticity Clay • 22 16 49 •, 12 '• 21 _ 66 . 16 .•. 22 10 Standard Penetration Resistance 8 •` '. ii Auger Refusal 10 • 43 27 31 34 24 •: 23 ' 20 • 13 12 14 p hl• 36 1 15 43 hi 20 '•: 41 ,•la 18 , 22 11 16 18 111 0 22 PROJECT: SCALE: As Shown Ir/////J GeoTeclhnologies. Inc. JOB No: 123-0773-EA Sheetz -Asheville Airport Fletcher, North Carolina FIGURE No: 2A Depth (Feet) GENERALIZED SUBSURFACE PROFILE LEGEND B-10 B-11 B-12 B-13 B-14 B-15 B-16 .x.: ❖$ Asphalt p� pI Stone Base n 14 •2 6 14 20 • 11 13 • . 15 �'�� Silty Sand 7 Low Plasticity Clay 4 , ,.'. '. .'.. 8 16 18 20 27 18 15 Gravel 6 ,• Standard Penetration Resistance • 11 12 22 11 • 26 26 18 • 10 • 17 10 17 _ 27 28 20 20 12 ' 14 13 16 18 20 •• 9 22 PROJECT: SCALE: As Shown IrrA GeoTeclhnologies. Inc. JOB No: 123-0773-EA Sheetz -Asheville Airport Fletcher, North Carolina FIGURE No: 2B Depth (Feet) GENERALIZED SUBSURFACE PROFILE LEGEND P- 1 P- 2 P- 3 P-4 P- 5 P- 6IMI Topsoil U ! ! J , !ice Low Plasticity Clay j1111 Low Plasticity Silt 1 012.5 12 15+ 8.5 11 ...9.5...... Dynamic Cone Penetration ii. ii Auger Refusal 2 / . 3 4 .... ..15 14 12 15+ 14 15+ 5 6 8 — 15+ .... . 7 15+ 15 15 15+.... 8 PROJECT: \ SCALE: As Shown GeoTechnologies, Inc. JOB No: 123-0773-EA Sheetz -Asheville Airport Fletcher, North Carolina FIGURE No: 2C ESTIMATED SETTLEMENT OF SQUARE FOOTING 1.00 - - 0.90 - 0.80 0.70 0.60 Y c v 0.50 —•—•B-1 v t B-4 Y 0.40 B-5 W 0.30 0.20 0.10 0.00 0 50 100 150 200 250 Load (kips) Chart is based on a stress of 3000 psf FIGURE 3 ESTIMATED SETTLEMENT OF STRIP FOOTING 0.70 - — 0.60 0.50 +B-1 f B-4 a 0.40 E a B-5 r, a)v) -o ai 00.30 E N W 0.20 0.10 0.00 0 500 1000 1500 2000 2500 3000 3500 4000 Contact Stress(psf) Length=50ft, Width=1.5ft FIGURE 4 LABORATORY TEST RESULTS 1 ASTM D-4318 80 CDCH 70 . L 60 S T 50 1 C T 40 - . • I 30 _ N D X 20 _ . CL-ML , ML CD 0 0 20 40 60 80 100 LIQUID LIMIT(LL) Specimen Identification LL PL PI Fines Classification •B-13 1.0-4.0 69 30 39 37.3 Brown Slightly Silty Clay Fine Sand I P-3 .5-2.5' 37 26 11 49.6 Brown Clay Slightly Silt Fine Sand PROJECT Sheetz@ Ashville -Ashville, North Carolina JOB NO. DATE 9/29/23 Date Recieved' ATTERBERG LIMITS' RESULTS Dates Tested: U.S. Standard Sieve Sizes V N CO 1" " #4 #10 #20 #40 #60 #100 #200 100 60 m c m U 40 0 100 8 6 4 2 10 8 6 4 2 1 8 6 4 2 0.1 8 6 4 2 0.01 8 6 4 2 0.0018 6 Grain Size In Millimeters GRAVEL SAND FINES COARSE FINE COARSE MEDIUM FINE SILT SIZES CLAY SIZES Boring No. Elev./Depth Nat.W.C. L.L. P.L. P.I. Soil Description or Classification B-13 GRAIN SIZE DISTRIBUTION 1.0-4.0 15.3 69.0 30.0 39.0 Brown Slightly Silty Clay Fine Sand GeoTechnologies, Inc. Project: Job No.: Sheetz@ Ashville Date Recieved• Ashville, North Carolina Date: 9/29/23 Dates Tested: U.S. Standard Sieve Sizes V N CO 1" " #4 #10 #20 #40 #60 #100 #200 100 60 m c m 2 40 0 100 8 6 4 2 10 8 6 4 2 1 8 6 4 2 0.1 8 6 4 2 0.01 8 6 4 2 0.0018 6 Grain Size In Millimeters GRAVEL SAND FINES COARSE FINE COARSE MEDIUM FINE SILT SIZES CLAY SIZES Boring No. Elev./Depth Nat.W.C. L.L. P.L. P.I. Soil Description or Classification P_3 GRAIN SIZE DISTRIBUTION .5-2.5' 18.4 37.0 26.0 11.0 Brown Clay Slightly Silt Fine Sand GeoTechnologies, Inc. Project: Job No.: Sheetz@ Ashville Date Recieved• Ashville, North Carolina Date: 9/29/23 Dates Tested: 135 GcoTechnologies, Inc. Job No: Date: 9/29/23 130 Job Name: Sheetz@ Ashville Job Location: Ashville, North Carolina Boring No: B-13 Sample No: 125 Depth: 1.0-4.0 TEST RESULTS Method of Test: ASTM D 698 120 Maximum Dry Density: 108.5 PCF Optimum Moisture Content: 16.5% \ Natural Moisture Content: 15.3% 0 115 Atterberg Limits: LL 69.0 PI 39.0 Soil Description: Brown Slightly Silty Clay U Fine Sand N 110 0 a Date Recieved• Dates Tested: 2 105 >- ❑ re 100 CURVES OF 100%SATURATION 95 FOR SPECIFIC GRAVITY EQUAL TO: 2.80 2.70 90 2.60 85 80 75 0 5 10 15 20 25 30 35 40 45 WATER CONTENT(Percent Dry Weight) MOISTURE-DENSITY RELATIONSHIP J 135 GcoTechnologies, Inc. Job No: Date: 9/29/23 130 Job Name: Sheetz@ Ashville Job Location: Ashville, North Carolina Boring No: P-3 Sample No: 125 Depth: .5-2.5' TEST RESULTS Method of Test: ASTM D 698 120 1 Maximum Dry Density: 105.9 PCF Optimum Moisture Content: 18.9% Natural Moisture Content: 18.4% 0 115 Atterberg Limits: LL 37.0 PI 11.0 Soil Description: Brown Clay Slightly Silt U Fine Sand N110 0 a Date Recieved• Dates Tested: 2 105 ❑ re 100 CURVES OF 100%SATURATION 95 FOR SPECIFIC GRAVITY EQUAL TO: 2.80 2.70 90 2.60 85 80 75 0 5 10 15 20 25 30 35 40 45 WATER CONTENT(Percent Dry Weight) MOISTURE-DENSITY RELATIONSHIP J GeoTechnologies, Inc. CBR DATA SHEET ASTM D-1883 JOB#: 1-23-0773EA JOB NAME: Sheetz @ Asheville DATE: 8/30/2023 SAMPLE I.D.: B-13 Depth: 0.5'-2.5' NOTES: PROCTOR DATA: TEST PROCEDURE: ASTM D-698 Opt.Moisture= 16.5% Max.Dry Density= 108.5 SOIL DESCRIPTION: Tan Silty Clay Sand CBR SPECIMEN DATA Swell Data MOISTURE CONTENT 16.8% Initial Reading 0.256 WET DENSITY 124.2 lbs./cu.ft. Final Reading 0.300 DRY DENSITY 106.3 lbs./cu.ft. Mold Height 4.591 %COMPACTION 98.0% % Swell 0.96 LOAD CELL 5000 LB. RATE OF DEFORMATION .05 in./min. SURCHARGE USED 10 lbs. 300.00 - 250.00 -- 200.00 - Q y 150.00 - - (7 • 100.00 - 50.00 - --- 1 0.00 0.00 0.10 0.20 0.30 0.40 0.50 0.60 Penetration (in.) CBR @ 0.1" 4.1 CBR @ 0.2" 7.8 %SWELL 1.0 GeoTechnologies, Inc. CBR DATA SHEET ASTM D-1883 JOB#: 1-23-0773EA JOB NAME: Sheetz @ Asheville DATE: 8/30/2023 SAMPLE I.D.: P-3 Depth: 1.0-4.0' NOTES: PROCTOR DATA: TEST PROCEDURE: ASTM D-698 Opt.Moisture= 18.9% Max.Dry Density= 105.9 SOIL DESCRIPTION: Tan Silty Clay Sand CBR SPECIMEN DATA Swell Data MOISTURE CONTENT 17.9% Initial Reading 0.328 WET DENSITY 123.6 lbs./cu.ft. Final Reading 0.345 DRY DENSITY 104.8 lbs./cu.ft. Mold Height 4.591 %COMPACTION 99.0% % Swell 0.37 - LOAD CELL 5000 LB. RATE OF DEFORMATION .05 in./min. SURCHARGE USED 10 lbs. 350.00 300.00 - --- 1 250.00 - 1 I000 0.00 0.10 0.20 0.30 0.40 0.50 0.60 Penetration (in.) CBR @ 0.1" 9.5 CBR @ 0.2" 11.0 %SWELL 0.4 BORING LOGS TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 0.3 _ Topsoil U Medium Dense,Tan,Silty SAND SM • 6-7-7 l\r 10-12-14 10-10-12 8.0 Dense,Tan,Silty SAND SM • • 17-19-24 • N O H LI 15.0 17-17-19 'a Boring terminated at 15 �I Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B- 1 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 0.3 Gravel ° Medium Dense,Light Gray,Silty SAND SM 7-7-8 12-12-14 8-8-8 10-12-15 M N O 0 H LI 15.0 7-7-8 'a Boring terminated at 15' 0? �I Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B-2 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 0.3 Gravel SM • Medium Dense,Brown,Silty SAND 9-10-12 3.0 Dense,Brown,Light Gray,Silty SAND SM • 12-18-20 15-22-27 12-14-17 N O H LI 15.0 12-18-25 'a Boring terminated at 15' 1 C7 Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B-3 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 0.3 Topsoil Medium Dense,Brown,Silty SAND SM 5-5-5 5-5-5 7-8-4 8.0 Dense to Medium Dense,Light Gray,Silty SAND SM 10-15-19 M N • 0 H LI 15.0 10-10-10r.D'a Boring terminated at 15' 71 C Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B-4 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 0.3 Gravel SM Medium Dense,Brown Tan,Silty SAND I\I 3-5-6 8-9-12 • 10-10-11 8-11-13 12.0 Dense,Gray,Silty SAND w/Gravel SM M N O_ H 15.0 12-18-23 'a Boring terminated at 15' (3 �I Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B-5 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 Asphalt 0.4 0.6_ Stone Medium Dense,Brown,Silty SAND w/Quartz SM Fragments 7-7-8 • 10-12-16 5.5 Very Dense,Brown,Silty SAND SM 20-32-34 7.5 Auger Refusal at 7.5' O_ H H LI a cD �I Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B-6 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 0.4 Asphalt 0.6-. Stone - SM'° Medium Dense,Brown,Silty SAND 6-7-7 7-8-10 8-8-8 10-12-11 M N O 0 • � LI 15.0 • 8810 'a Boring terminated at 15' _I Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B-7 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 0.4 Asphalt 0.6-. Stone - SM'° Medium Dense,Brown,Silty SAND 7-8-8 8-10-12 10-12-10 10-10-10 M N O 0 • • 10-12-10 15.0 0 Boring terminated at 15' 0) _I Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B-8 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 TEST BORING RECORD L J DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 0.3 - Asphalt 0.5 Stone /SM Medium Dense Brown,Silty SAND w/Mica • 6-7-7 7-8-9 5-5-5 • 6-6-7 12.0 Stiff,Brown,Sandy CLAY w/Mica CL / • 4-5-6 / / O / / H / 0 / • LI 20.0 // 4-5-6 Boring terminated at 20' Z 0I Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B-9 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 0.3 Asphalt 0.5 Stone /SM Medium Dense to Loose,Brown,Silty SAND w/Mica 5-6-8 4-4-4 • 7-6-5 ' 4\0 5-8-9 6-6-7 M H q H LI LI 20.0 + 5-4-5 Boring terminated at 20' N Z 0I Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B-10 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 TEST BORING RECORD L J DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 0.3 _ Asphalt 0.5 Stone q Medium Dense,Gray,Silty SAND w/Gravel SM • 7-8-8 2.5 Medium Dense,Brown,Silty SAND SM 1 . . . . 5-7-9 • 9-6-6 8.0 • Stiff,Brown,Sandy CLAY CL • 4-5-5 0 Boring terminated at 10' a cD N- N- 0 M N Z (I Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B-11 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 0.3 Gravel ° Medium Dense,Brown,Silty SAND SM 9-7-7 • 9-9-9 9-10-12 M N 6-8-9 10.0 0 Boring terminated at 10' a cD 0) N- N- 0 M N Z (I Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B-12 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 0.3 _ Gravel 0 Medium Dense,Brown,Gray,Silty SAND SM • 6-9-11 6-9-11 5-5-6 0 10-12-15• 10.0 0 Boring terminated at 10' a Co N- N- 0 M N Z 0 Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B-13 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 0.3 Gravel ° Medium Dense,Tan,Silty SAND SM 5-5-6 • • 12-12-17 • • • • 10-12-14 M N O_ 15-17-21 10.0 • Boring terminated at 10' a cD 0) N- N- 0 M N Z (I Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B-14 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 0.3 Gravel ° Medium Dense,Tan,Brown,Silty SAND SM 6-6-7 • 8-10-8 10-12-14 M N N 10-10-10 10.0 _ Boring terminated at 10' a cD 0) N- N- 0 M N Z (I Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B-15 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 TEST BORING RECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (FT.) (BLOWS/FT.) SIX INCHES 0.0 0 10 20 40 60 100 Asphalt 0.4 ;.;. 0.6 Stone _ • Medium Dense,Dark Brown,Silty SAND • SM'• 7-8-7 • 6-7-8 • 8-8-10 N 8-10-10 10.0 • Boring terminated at 10' a cD N- N- 0 M N Z (I Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER B-16 DATE 9-13-23 % GcoTechnologies, Inc. PAGE 1 OF 1 DYNAMIC HAND CONE PENETROMETER RECORD DEPTH DESCRIPTION ELEVATION PENETRATION PER BLOWS PER (FT.) (FT.) INCREMENT 1 3/4" 0.0 0 10 20 40 60 100 Topsoil 0.5 Stiff Orange Fine Sandy Silty CLAY CL • 10-15 3.0 Stiff Orange to Tan Fine Sandy Micaceous SILT ML • 15 7.0 • Hand Auger Terminated at 7' 15+ M N 0 H 0 H a 0) N- N- 0 M N Z 0 Dry at time of boring JOB NUMBER 123-0773-EA \ BORING NUMBER P- 1 DATE 8-28-23 % GcoTechnologies, Inc. PAGE 1 OF 1 DYNAMIC HAND CONE PENETROMETER RECORD DEPTH DESCRIPTION ELEVATION PENETRATION PER BLOWS PER (FT.) (FT.) INCREMENT 1 3/4" 0.0 0 10 20 40 60 100 Topsoil 0.5 Stiff Orangish Brown Fine Sandy Silty CLAY CL/ • 10-12-12 2.5 j Stiff Orange to Tan Fine Sandy Micaceous SILT ML • 10-13-15 7.0 • Hand Auger Terminated at 7' 15 M N 0 H 0 H a 0) N- N- 0 M N Z 0 Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER P-2 DATE 8-28-23 % GcoTechnologies, Inc. PAGE 1 OF 1 DYNAMIC HAND CONE PENETROMETER RECORD DEPTH DESCRIPTION ELEVATION PENETRATION PER BLOWS PER (FT.) (FT.) INCREMENT 1 3/4" 0.0 0 10 20 40 60 100 Topsoil 0.5 Stiff Orange Brown Fine Sandy Silty CLAY CL/ • 12-15+ 3.5 / Stiff Orangish Brown&Gray Fine Sandy Clayey ML SILT • 10-12-12 6.0 • Hand Auger Terminated at 6' 8-8-8 O_ H LI a cD _I Dry at time of boring JOB NUMBER 123-0773-EA \ BORING NUMBER P-3 DATE 8-28-23 % GcoTechnologies, Inc. PAGE 1 OF 1 DYNAMIC HAND CONE PENETROMETER RECORD DEPTH DESCRIPTION ELEVATION PENETRATION PER BLOWS PER (FT.) (FT.) INCREMENT 1 3/4" 0.0 0 10 20 40 60 100 0.2 Topsoil _ • Stiff Brown SILT ML • 12-7-10 2.5 Stiff Tan Brown Fine to Medium Sandy SILT ML w/Mica • 15-15+ 6.0 • Hand Auger Refusal at 6' 15+15+ O_ H LI a cD _I Dry at time of boring JOB NUMBER 123-0773-EA \ BORING NUMBER P-4 DATE 10-2-23 % GcoTechnologies, Inc. PAGE 1 OF 1 DYNAMIC HAND CONE PENETROMETER RECORD DEPTH DESCRIPTION ELEVATION PENETRATION PER BLOWS PER (FT.) (FT.) INCREMENT 1 3/4" 0.0 0 10 20 40 60 100 0.2 Topsoil Stiff Orange Brown Clayey Fine to Medium Sandy ML' SILT • 12-10-12 2.5 Stiff Orange Brown Fine to Medium Sandy SILT ML 3.5 Stiff Orange Tan SILT ML 13-13-15 7.0 • Hand Auger Terminated at 7' 15-15 M N 0 H 0 H LI 0 c�a 0) N- N- 0 M N Z 0I Dry at time of boring JOB NUMBER 123-0773-EA BORING NUMBER P-5 DATE 10-2-23 % GcoTechnologies, Inc. PAGE 1 OF 1 DYNAMIC HAND CONE PENETROMETER RECORD DEPTH DESCRIPTION ELEVATION PENETRATION PER BLOWS PER (FT.) (FT.) INCREMENT 1 3/4" 0.0 0 10 20 40 60 100 0.2 Topsoil Stiff Red,Orange&Brown Silty CLAY CL 7/ • 9-9-10 3.5 / Stiff Orange Brown Clayey SILT ML • 10-15+ 5.5 Stiff Red Brown SILT ML 7.0 • Hand Auger Terminated at 7' 15-15+ M N 0 H 0 H LI 0 c�a 0) N- N- 0 M N Z 0I Dry at time of boring JOB NUMBER 123-0773-EA \ BORING NUMBER P-6 DATE 10-2-23 % GcoTechnologies, Inc. PAGE 1 OF 1