Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW5240603_Design Calculations_20240911 (3)
Project Information Complete this sheet if required by your reviewing authority. Contact them for any questions. Grey boxes/text are optional. SNAPv4.2.0 LOCATION Project Name(optional): Eaddy Building Addition Parcel ID(optional): Submission Date(optional): date Nutrient Management Watershed: menu Local Jurisdiction/Reviewing Agency: State/Federal menu Subwatershed: Neuse-Upper menu Project Latitude Coordinates(optional): N Phosphorus Delivery Zone: Neuse- Upper 03020201 menu Project Longitude Coordinates(optional): W Nitrogen Delivery Zone: Neuse- Upper 03020201 menu - PROJECT DETAILS Development Land Use Type: Institutional menu Disturbed Area: 0 ft2 Part of Common Development Plan? .no yin Project Activity: New Development menu Designated Downtown Area? no yin Project Drains to SA Waters? no yin Public Linear Road/Sidewalk Project? .no yin Pre-Project Land Use: developed menu Project Owner Type: State non-NCDOT menu Project Description(optional): STORMWATER DETAILS (Falls ONLY)Onsite Reduction%Req. % Project Uses LID/Runoff Volume Match? no yin Existing BUA/Development Onsite? yes y/n Local Gov't nutrient req's same as State? yes y/n Local Gov't cutoff date for Existing BUA: 05/01/2023 date Project Drains to Regional SCM? no y/n Nitrogen Export Rate Target: 3.60 lb/ac/yr Total Nitrogen Offset Credits Needed: lb/yr Phosphorus Export Rate Target: 1000.00 lb/ac/yr Total Phosphorus Offset Credits Needed: lb/yr SNAP v4.2.0 Project Area and Offsite Land Cover Characteristics Precipitation Neuse Station: Copy ' Paste VALUES ONLY for Best Results Click here to scroll down to error messages on this sheet. — PROJECT AREA LAND COVERS TN EMC (mg/L) TP EMC (mg/L) Pre-Project Area (ft2) Post-Project Area (ft2) Change pre-to-post(ft2) 1 Roof 1.18 0.11 0 Roadway 1.64 0.34 0 Parking/Driveway/Sidewalk 1.42 0.18 0 Protected Forest 0.97 0.03 0 Managed Pervious/Landscaping 2.48 1.07 21,990,479 21,990,479 0 Offsite or Existing Roof 1.18 0.11 568,337 568,337 0 Offsite or Existing Roadway 1.64 0.34 0 Offsite or Existing Parking/Driveway/Sidevin 1.42 0.18 1,575,195 1,575,195 0 Offsite Protected Forest 0.97 0.03 0 Offsite Managed Pervious 2.48 1.07 0 CUSTOM LAND COVER 1 0 CUSTOM LAND COVER 2 0 CUSTOM LAND COVER 3 0 LAND TAKEN UP BY SCM 1.18 0.11 0 Total (Regulated & UnReg)Area 24,134,011.00 24,134,011.00 Project (Regulated)Area 21,990,479.00 21,990,479.00 Nutrient Export Summary Landcover Et SCM Data Review Errors/Advisories Avg Annual precip(in) = 45.76 Total (Regulated+ 24,134,011 Unregulated)Area (ft2)= Project(Regulated) 21,990,479 Area (ft2) = Net BUA(Project Area 0 Net BUA indicates redevelopment or a non- BUA only ft2)= development activity. Custom Landcovers are present: no Total Nitrogen Export Target Scaled to Project Area (Ib/yr): 1817.39 Total Area Total Area Project Area Project Area (Onsite+ Post-Project Post-Project Nutrient Export Summary (Onsite Only) Offsite) before before Pre-Project Pre-Project Treatment Treatment Area (All Landcover Types) (acres) 554.0407 504.8319 554.0407 _ 504.8319 Percent Built-Upon Area (BUA)(%) 9% 0% 9% 0% Built-Upon Area(BUA) (sqft) 2,143,532 0 2,143,532 I 0 Annual Runoff Volume(ft3/yr) 10,762,338 3,773,566 10,762,338 3,773,566 Annual Runoff%Change 0% 0% Total Runoff Change(cuft/yr) 0 0 Total Nitrogen EMC(mg/L) 1.75 0.95 1.75 2.48 Total Nitrogen Load Leaving Site(Ib/yr) 1,176.28 584.37 1,176.28 584.37 Total Nitrogen Loading Rate(Ib/ac/yr) 2.12 1.16 I 2.12 1.16 Total Nitrogen%Change Pre-to-Post 0% 0% Total Nitrogen Change(Ib/yr) Pre-to-Post 0.00 0.00 Total Phosphorus EMC(mg/L) 0.48 0.41 0.48 7- 1.07 Total Phosphorus Load Leaving Site(Ib/yr) 322.58 252.13 322.58 252.13 Total Phosphorus Loading Rate(Ib/ac/yr) 0.58 0.50 0.58 0.50 Total Phosphorus%Change Pre-to-Post 0% _+ 0% Total Phosphorus Change (Ib/yr)Pre-to-Post 0.00 0.00 SCM/Catchment Summary 1 SCM ID and Type Volume TN Reduction TP Reduction TN Out I TP Out Reduction(%) (%) (%) (Ibs/ac/yr) (Ibs/ac/yr) i Catchment 1 0.00% 0.00% g 0.00% 0.00 0.00 101:NA 0.00% 0.00% 0.00% 0.00 0.00 102:NA 0.00% 0.00% 0.00% 0.00 0.00 103:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 2 0.00% 0.00% _ 0.00% 0.00 0.00 201:NA 0.00% 0.00% 0.00% 0.00 0.00 202:NA 0.00% 0.00% _ 0.00% 0.00 0.00 203:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 3 0.00% 0.00% 0.00% 0.00 0.00 301:NA 0.00% 0.00% 0.00% 0.00 0.00 302:NA 0.00% 0.00% 0.00% 0.00 0.00 303:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 4 0.00% 0.00% _ 0.00% 0.00 0.00 401:NA 0.00% 0.00% 0.00% 0.00 0.00 402:NA 0.00% 0.00% _ 0.00% 0.00 0.00 403:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 5 0.00% 0.00% 0.00% 0.00 0.00 501:NA 0.00% 0.00% 0.00% 0.00 0.00 502:NA 0.00% 0.00% 0.00% 0.00 0.00 503:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 6 0.00% 0.00% _ 0.00% 0.00 0.00 601:NA 0.00% 0.00% 0.00% 0.00 0.00 602:NA 0.00% 0.00% _ 0.00% 0.00 0.00 603:NA 0.00% 0.00% 0.00% 0.00 0.00 1 SNAP v4.2.0 Errors/Advisories SCM Area (ft2) = 0 SCM Treated Area (ft2) = 0 Catchment Routing: No errors Treating Runoff from Existing BUA or Offsite: no Disturbed Area (ft2) = 0 Total Phosphorus Export Target 504831.93 Scaled to Project Area (Ib/yr): Total Area Project Area Total Area Project Area Total Area Project Area Post-Project Post-Project Post-Project Post-Project Post-Project Post-Project SCM-Treated SCM-Treated Untreated Untreated after Treatment after Treatment Area Only Area Only Areas Areas 554.0407 504.8319 0.0000 0.0000 554.0407 504.8319 9% I 0% 0% 0% 9% I 0% 2,143,532 0 0 0 2,143,532 _ 0 10,762,338 3,773,566 0 0 10,762,338 3,773,566 0% 0% 0 0 1.75 2.48 0.00 0.00 1.75 2.48 1,176.28 I 584.37 0.00 0.00 1,176.28 _ 584.37 2.12 I 1.16 0.00 0.00 2.12 1.16 0% 0% 0.00 I 0.00 0.48 1.07 0.00 0.00 0.48 1.07 322.58 I 252.13 0.00 0.00 322.58 252.13 0.58 0.50 0.00 0.00 0.58 0.50 0% 0% 0.00 1 0.00 1 Falls Lake ONLY: Onsite Reduction Compliance Check Nitrogen Phosphorus Onsite%Reduction Requirement Export Target Scaled to Area (Ib/yr) 1,817.39 504,831.93 Export Load Post-Project Before Treatment 584.37 252.13 Total Reduction Need (Ib/yr) Onsite Reduction Need (Ib/yr) _ Onsite Export Target(Ib/yr) Project Area Post-Project After Treatment 584.37 252.13 1 Nutrient Management Strategy Watershed - Nutrient Offset Credit Reporting Form SNAP v4.2.0 Please complete and submit the following information to the local government permitting your development project to characterize it and assess the need to purchase nutrient offset credits. Contact and rule implementation information can be found online at: http://deq.nc.gov/about/divisions/water-resources/planning/nonpoint-source-management/nutrient-offset-information PROJECT INFORMATION Applicant Name:1 Project Name: Eaddy Building Addition Project Address: Date: (mm/dd/yyyy) Development Land Use Type: Institutional County: Project Activity Type: New Development Project Area(sqft): 21,990,479 Project Latitude: 0.000000 Post-Project Built-Upon Area%: 0.00% I Project Longitude: 0.000000 WATERSHED INFORMATION Nutrient Management Watershed: 0 N Target Export Rate(Ib/ac/yr): 3.60 Subwatershed: Neuse-Upper P Target Export Rate(Ib/ac/yr): 1000.00 Nitrogen Delivery Zone: Neuse-Upper 03020201 Nitrogen Delivery Factor: 100% Phosphorus Delivery Zone: Neuse-Upper 03020201 Phosphorus Delivery Factor: 100% PERMANENT NUTRIENT OFFSET REQUEST Post-Project Nitrogen Calculations -Projects with No Offsite or Built-Upon Area (A) (B) (C) (D) (F) (G) (Where Applicable) TN Export TN Remaining TN Permanent Additional I Total TN TN Untreated TN Treated TN Delivery Offsets Permanent Load(Ib/yr) Target Load Load(lb/yr) Reduction Factor(%) Required Local Gov't Offsets to (Ib/yr) Need(Ib/yr) (Ib/yr) Offsets(Ib/yr) Buy(Ib/yr) 584.4 1817.4 584.4 0.0 1 100.0% 0.0 0.0 I Post-Project Phosphorus Calculations -Projects with No Offsite or Built-Upon Area (A) (B) (C) (D) (F) (G) (Where Applicable) TP Export TP Remaining TP Permanent Additional I Total TP TP Untreated TP Treated TP Delivery Offsets Permanent Load(Ib/yr) Target Load Load(Ib/yr) Reduction Factor(%) Required Local Gov't Offsets to (Ib/yr) Need(Ib/yr) (Ib/yr) Offsets(Ib/yr) Buy(Ib/yr) 252.1 504831.9 r 252.1 0.0 100.0% 0.0 0.0 LOCAL GOVERNMENT AUTHORIZATION Local Government Name:I Staff Name: Phone: Staff Email: Date: Local Government Authorizing Signature: