Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC241475_MODIFICATION Supporting Documents_20240920 (3)
APPROVED FOR CONSTRUCTION Lai�r'� eQs�ig(�r� . DATE:9/16/2024 \ \ __/ l / / / I /'\ 1 / ! I JJCLL1�hJ1�11• / �u EROSION CONTROL NOTES: vv PROJECT NUMBER:LDCP-2024/Q0383 // I f/� = 223NORTHGRANC STREET / / I / I 1 1. ALL STD.NUMBERS REFER TO THE CHARLOTTE LAND DEVELOPMENT STANDARDSCHARLOTTE, - (- - / (� I / MANUAL(CLDSM). 704.333.0325 ♦ ■n r� SATE.Tws PLAN A AL DOES NOTIFtLUDE CHARLOTTE WATER.FOR I / I / I I / \ .. W WW.LANDDESIGN.COM YRlNrl,••� moaE:rvroamAr:6x,PLEASE CALL]04-335-545s or visa cnanotteware o // } / / / \ 4................ WT.HARRIS BLVD 2. MINIMUM EROSION CONTROL REQUIREMENTS ARE AS SHOWN ON THE DRAWINGS. NC ENG.FIRM LICENSE#C-0658 CHARLOTTE- \ I I I \ /fU•` EROSION CONTROL SHALL MEET ALL APPLICABLE LOCAL STATE AND FEDERAL MEETING AT LEAST / / R \FL NECKLEN80� NOTETHE ONLINE roan ) I ( / U M R _ LAWS AND REGULATIONS.CONTRACTOR SHALL MODIFY EROSION CONTROL AN�.A 1 USINGyyy PLAN PING DEPARTMENT\ v/a roam 1 \ `\ ; F:--� MEASURES AS NECESSARY TO MEET LAWS AND REQUIREMENTS OF REGULATORY NOTE:1 INCLUDE COMMERCIAL-ZONING. e ( ,} 1 AGENCIES AT NO ADDITIONAL COST TO OWNER. L APPROVALS CAN BE OBTAINED \'4, / / r / f ` m F , / \ / �/ _.* 1aE NDUDG.0 FORZONINGBUILDING PERMITS AND ENFORCEMENT.PLEASE CALLt AT 709 s/ I . - m I I 3. ON-SITE BURIAL PITS REQUIRE AN ON-SITE DEMOLITION LANDFILL PERMIT FROM INFORMATION. \\ /ry ...(((jjj J _ _ _ j \ \ / I THE ZONING ADMINISTRATOR. / r \ \ / / / I J I L / // / •I 4. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION - `� i \ // / / / I 1 / / / '? ',, N 1/\ OF THE CITY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. \ GB % / 1 / LOCATIAPPROXON ATE STOCKPILE I / 5. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN / i--_ _ -� \ _✓ / j /= I ( II �/ L� •4 IS A VIOLATION OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS // E \ / r� -'�_/ �/ / / I ( \ SUBJECT TO A FINE. i / % /• I / INI (�/// 1 j _ / \ ♦ \\ I IW ) / " _ - , �y 6. ALL DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT / /-i i / ' '•7 - STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT �• / j ( \ ♦ I ( I J r 1 IZ I WITHIN 14 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY. / _ / / • l I `I�+'�� - - EXISTING PAVED AC SS /\ \ I I // -:-J• I 7. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED \ / / I - m ROAD(FROM W.T.W /( - •��� E BY A REPRESENTATIVE OF THE CITY ENGINEERING DEPARTMENT. I / 1 • / / �. I �� _ HARRIS) / \ �; / / \/• I I/ I I /1 \.1 Wr APPROXIMATE LOCATION 8 SLOPES SHALL BE GRADED NO STEEPER THAN 2:1.2:1 FILL SLOPES GREATER THAN / 11 I / N,l._OFF DAM REMOVAL WORK ^ C _� 10'REQUIRE ADDITIONAL TERRACING(CLDSM 3016) J- `_ l i/ I. I / I I / \ A \ \\ / 9 PERMANENT CUT AND FILL SLOPES PLACED ON A SUITABLE FOUNDATION SHOULD II _ - / / / ( / I I ` - \\ BE CONSTRUCTED AT 2:1(HORIZONTAL TO VERTICAL)OR FLATTER.PERMANENT / / • ( J ( I ' I � \ r - ° SLOPES OF 3_1 SHOULD BE CONSTRUCTED WHERE MOWING IS DESIRABLE AND AS \ / I-- \-. \_\ / l / ) 1 / I '\.. ./ I INDICATED.IF FILL MATERIAL IS BROUGHT ONTO THE PROPERTY OR IF WASTE MATERIAL IS HAULED FROM THE PROPERTY,THEN THE CONTRACTOR SHALL / \ •\ \ O ( \ k -�1 DISCLOSE THE LOCATION OF ANY OFF-SITE BORROW LOCATION AND/OR WASTE / /♦• \ \ I I N I �� BURIAL LOCATION TO THE EROSION CONTROL INSPECTOR. J / I / ( I I // �� ? _ . ©,,6 10. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT ���\j\J%\�\J PROPERTIES.WHEN FIELD CONDITIONS WARRANT OFF-SITE GRADING,PERMISSION \ ✓ / / • / / // I 1 r '�"�� / \-C MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNER. KEY MAP '\ / / / / 1 / / .I I 11. ALL EROSION CONTROL DEVICES SHALL REMAIN UNTIL SITE HAS BEEN \ / / \ I 1 PERMANENTLY STABILIZED. \ / / / / / / / / /J / •' / / J %�/ 'II - / 1/ I , 12. ALL PERIMETER DIKES,LLBE PR,DITCHES„PERIMETER OSLOPESNENALL SLOPES \\ / / / -- / /J / I STEEPER THAN 3:1 SHALL BE PROVIDED TEMPORARY OR PERMANENT / ,,// STABILIZATION WITH GROUND COVER AS SOON AS POSSIBLE BUT IN ANY EVENT \\_// / / / _ /r `/ \- // _�\\ ' / / \ \ / I I / WITHIN]CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY. L \_, / / I / // J/ ` _ �' I I \ l ____.,.../ 13. PROPOSED CONSTRUCTION ACCESS ROAD ALONG CREST OF DAM(ONLY)TO BE f / ew \ I \\ %%/gip\ / STABILIZED WITH A 6-INCH COURSE OF COMPACTED ABC STONE. \ \ / r / / / \\ / / /0 / S ) I i' r 14. PROVIDE A DOUBLE ROW OF HIGH HAZARD SILT FENCE ON DOWNSTREAM SIDE OF / / / 1 / / .I DAM AT 3-0FT SPACING. \ \\ ^ \ / �/ I• I I Fla-h / I /\ ��/ sizes• t+; l MAINTENANCE SCHEDULE: SEAL \ 1 ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CHECKED FOR ' \ / POND 1 30.15) / MITIGATION t042 AC \ ESIG / / ♦i l \ \ remu BASIN INLET PROTECTION / PCSO BUFFER IMPACT W/O- - STABILITY AND OPERATION FOLLOWING EVERY STORM EVENT BUT IN NO CASE .`,v 0,...I ,r J EX.WSEL=t788.60' ' \ / • • \ \ LESS THAN ONCE EVERY WEEK.ANY REPAIRS OR CLEANING NECESSARY TO AAA,„, \ ( CATCH BASIN INLET PROTECTION , \ \ \ -- MAINTAIN EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE COMPLETED\ l1 (CLDS#30.16) Ij1FT \� I f'iIMMEDIATELY. = CORPORATE�, -1 \ DEWATERING PUMP PER CLDSM SEAL '• \ \ 1 / \ / • 1 ft PS-CB \ 30.13.SEE CONSTRUCTION1(' 2. ALL SEEDED AREAS SHALL BE REFERTILIZED,RESEEDED AS NECESSARY,AND\ I \ CATCH BASIN INLET PROTECTION SEQUENCE FOR DRAWDOWNMULCHED ACCORDING TO THE SEEDING SCHEDULE. ."10:ENO MN7 OI - RATE O\ / / �. (CLDS#30.15) � hCONSTRUCTION SEQUENCE:STAGE 2 %TH Cp?'o"\ •\ • Ir FOR STAGED EROSION CONTROL PLANS.CONTRACTOR SHALL MEET WITH ERO N \ I / \ <� . . / / -�• PROPOSED CONSTRUCTION ENTRANCE 1 ,' CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH STAGE OF EROSIONSIO\ 1\ CONTROL MEASURES:\ P10-CB � �/ / j• 2 THE CONTRACTORSHALLDILIGENTLY AND CONTINUOUSLY MAINTAINALL EROSIONs•\ CATCH BASIN INLET PROTECTION �oV CONTROL DEVICES AND STRUCTURES.(CLDS#3015) _ .... \\ \ AIL 'I' --- \ STOCKPILESUITABLESOILSFORLATERREUSETHEAREAINDICATEDTHE PLANS. OW I ---- \ '\�' CHANNEL SHALL REMAIN IN PLACE UNTIL PERMANENT CONTROL STRUCTURE AND PROJECT \ I / \ �I- / p7�B ___ ���•v�@� �� \ PIPING ARE INSTALLED AND FUNCTIONAL. _ / - CATCH BASIN INLET PROTECTION . •�� :n_ 11.' _ ��_ -- ■ ®� % / _-\ \ \ 6 STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. \ CLDS#30.15) Il \\�� I �� �`\ ( \I17- i/ ]. PERMANENTLY STABILIZE ALL DISTURBED AREAS AND PROVIDE PERMANENT GRIFFITH LAKES - / ` / / DENUDED LIMITS(B AC.) it/4k'' �� r°PATCH \ PHASE p \ / / (CLDS#30.15 , \ r- � -� \ `\\\ \\ \ \\\ SEEDING ON THE DAM. PHASE 2B ///e/ CATCH 3ASIN INLET PROTECTION " I�\ S ` \ \, f,- /\) ) / �� � T 1 `` /8. COORDINATEWITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF �'' FILTER MEDIAI SILT SACK PERCLDSM 30.13 \/ J I \' • _riB `�� _-__.;/ -- _ \^ TEMPORARY 4 1 I I . \ \ 1\ \ I c / L\ \ \ ., SLOPE DRAIN(CLDS .•.li 1 I I I \ l I Q lag _ • g ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE-'ss' i. l - TOLL BROTHERS Pg-CB #30.04) ) I I - \ _I WITH THE N.C.EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, CATCH BASIN INLET PROTECTION / _\ ) _ • 1 U.S.DEPT.OF AGRICULTURE,CITY OF CHARLOTTE EROSION CONTROL \\\ / y,j'� "/ / 40 �\ /(CLDS#30.15) _ (�/ At. • l 0.13 AC PERMANENT I) \\ \ `. ORDINANCE,AND THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL 7416 OLD STATESVLLE ROAD 1 / __/ \ �'�\. I\\^ G CT CHARLO C 28269 -ces/CO%1 ,A�.. I t / WETLAND(IMPA / 1 \ --- , TTE N/ \ _ / TEMPORARY DITCH(TD-15)WI \OJ/ / .ov`� ` i•� / f \ \ / I ' / --\\ / CHECK DAMS PER CLDS#30.10A C Y // ,G I:i1,• I \ 1r- --_ P'MITIGATION AREA! / 1 HASE:BUFFER - Ary r ♦ !' _-_,:-.------1----------/ DIVERSION BERM(CLDS#30.18) / / TOP OF BERME760.00 /, 1 PCSO BUFFER / \ / // / 14 / ilifir___V- i - - /// DRAINAGE AREA 2.60 AC `� / \\ \/ \ n - I 7 urvoDEs GN PRoan / / TEMP.ROLLED ASPHALT / DENUDED AREA:260 AC - 4 1 / I\ • ' - TEMPORARY DITCH(TD 13)WI CHECK - / 1024051 / / DAMS PER CLDS#3010A \ �/ - - / IMPACT TO I / / lit v \ / TOP OF SPILLWAY:778.59 �' / BE MITIGATED±0.04 AC. =\ I \ �/ BoroMOFBASIN.ns.00 I _ REVISION/ISSUANCE P50-CB J - SKIMMER PIPE:2.5"0 P61-CB // / /// / / 1 \ I I \ / \ T CATCH BASIN INLET PROTECTION / CATCH BASIN INLET PROTECTION \ SKIMMER ORIFICE:1.8"0 / o / / / �l I \ '�\ I I \ / NO. DESCRIPTION DATE (CLDS#30.15) -/ •[&) SKIMMER INVERT:776.00 / \ _I LAND DEVELOPMENT- / / / - I / (CLDS#30.15) / `L / ( /�� \_ . 16T SUBMITTAL05.16.2024 / \CHECK DAMS PER CL # .1 p♦ / / (CLDS#30.02B) • LAND DEVELOPMENT-/ I \ 2ND SUBMITTAL _TEMPORARYBAFFLE TEMPORARY BAFFLE /(CLDS#30.19B) / , (CLDS#3o.19B) \ , \• \� ( 1 :.,...„ 0.231AC PERMANENT WETLAND `/ IMPACT(DWR#20-1208V2) � •� / / A �� AALEGEND://� ` N7 AC /% ( \\ \ �\ � // CONSTRUCTION ENTRANCE CLDSM#30.11B •TOP OF BERM 77910 \ /TEMPORARY 4" TOP OF SPILLWAY:7]8.5g - \� \ ,\ \ \ / LIMITS OF DISTURBANCE LD i' SLOPE DRAIN(CLDS BOTTOM OF BASIN:775.00 / / I I A\ \ TEMP.DIVERSION DITCH CLDSM#30.05 - TD->- / / / , �j//T r` #30.04) SKIMMER PIPE 2,5"0 / / / 1 I \, \ //� _ / // // / �` -./ •7 f/L L- SKIMMER ORIFICE:1.8"0 / I I '"1 \\ \\ / / \\ ,� INLET PROTECTION CLDSM#30.15 SKIMMER INVERT:T16.00 / \ , // / / // /�` �\ i- _-_�/ • I \ \% \�i \ \\ / / /\\ \ � \ BLOCKED INLET El / / ( ♦ • \ / / I I \A \ \ \ / // / I \ ROCK CHECK DAM CLDSM#30.10A / / SILT FENCE OUTLET I \'l /• \y ^ J / 1 I , ,� / (CLDS#30.06C) D \ PCSO BUFFER IMPACT TO \, \ \ // / \I \I \ ® DRAWN BY:6Y JHF _ \ / / ( JSI ! � \ \ / HIGH HAZARD SILT FENCE CLDSM# BE MITIGATEDt0.10 AC. V `�„A I v ® _ / V A / 30.06B \ \ -\ \ \ / CHECKED BY: JSI / • \- SILT FENCE CLDSM#30.06 0 \\\ I �• ` TEMPORARYSKIMMER \ �� _ \( 0 A A A -(CLDS#30.026) A • I SCALE °ORBS" \\\\J�� / \�� \ •', -J f ) / \\ •\ • ./ i-/ 0 . TREE PROTECTION FENCE -/ \ \ �\ \ y'Z'• PCSO BUFFER IMPACT TO / \ \ - \ I TEMP.STORM PIPE . n� \- \ \ - --2.__(___-)J BE MITIGATED t 0.10 AC. \ V / \\ '- \ l 1 \ -- / \ -1 j I \ /�� BASIN BAFFLES VERT: N/A tT \\ / /� �\ \ \\ \\\\ \\,I �, / / `\ �`_„„\__-___ /� / J \\\\ �f C � \\ \\ I \ EXISTINGOPO MAJOR CONTOURR \�// \ \ / \ BHEETTTLB I PROPOSED MAJOR CONTOUR 4WDzs so' oo' • 637 / /7 \ \\ j :--� I EXISTING MINOR CONTOUR EROSION CONTROL-STAGE I/ / \ \ \ 1 I EXISTING RIGHT-OF-WAY - - 3 \-l.-a_� \ \ I \ , \ \_ / \ /-T \ \T \ \• _ /� \ \ PROPOSED RIGHT-OF-WAY i1 \ -- ( \. \ \\\ -� /_y \ r� ./ SHEET NUMBER C2-03