HomeMy WebLinkAbout310134_Compliance Evaluation Inspection_20240919 ivision of Water Resources
Facility Number - O Division of Soil and Water Conservation
p other Agency
Type of Visit: Compliance Inspection 0 Operation Review O Structure Evaluation p Technical Assistance
Reason for Visit: O Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: Arrival Time: Departure Time: County:2 1A.41 Region:
1
Farm Name: Tj(�tkn i t.�QWex- q. KQ1('W Owner Email:
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
Onsite Representative: P Integrator:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish Layer Dairy Cow
Wean to Feeder I INon-Layer I I Dairy Calf
Feeder to Finish 1 Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish Layers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets Beef Brood Cow
Turkeys
Other Turkey Puults
Other
Discharses and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes 2/No ❑ NA ❑NE
Discharge originated at: ❑ Structure Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes [] No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes [ o ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ET o ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
Facilit Number: jDate of Inspection:
i
Waste Collection & Treatment
4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes dNo ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: �
Spillway?:
Designed Freeboard(in):
i
Observed Freeboard(in): €
f
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes to ❑ NA ❑ NE
(i.e., large trees,severe erosion, seepage,etc.)
6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes E3 No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat,notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes �o ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [g o ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑1qo ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes L3/No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [:) Yes E3/No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ED/No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes [�]Xo ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes F-14110 ❑ NA ❑ NE
acres determination?
i
17. Does the facility lack adequate acreage for land application? ❑ Yes o ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes [:IKo ❑ NA ❑ NE
Required Records& Documents
19. Did the facility fail to have the Certificate of Coverage& Permit readily available? ❑ Yes o ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes No ❑NA ❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes,check the appropriate box below. ❑ Yes [Ao ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [JNo ❑ NA WNE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA
Page 2 of 3 511212020 Continued
Facility Number: jDate of Ins ection: 2
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [-/No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes [2"No ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes 1R<o ❑ NNA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No 6 A ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document 0 Yes No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [ to ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes o ❑ NA ❑ NE
permit? (i.e.,discharge,freeboard problems,over-application)
31. Do subsurface the drains exist at the facility?If yes,check the appropriate box below. ❑ Yes 1 10 ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ED o ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes [No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes WN o ❑ NA ❑ NE
Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
a c le— 1/1 ck o20 aq
Reviewer/Inspector Name: 64 Phone: oZ
Reviewer/Inspector Signature: Date:
Page 3 of 3 511212020