Loading...
HomeMy WebLinkAboutWQ0045164_Site Plans/Maps_20240916/ o° PROP. FM TO CONNECT INTO EX. GRAVITY MANHOLE. COAT INTERIOR OF EX. MH WITH MIN. 80-MIL THICKNESS EPDXY COATING o° O PROP. 4" DIP CASING PIPE \ / �EtJ , WALTMST PROPERTIES OE INC EO P/N.• 9631-44-5163 DB 1172 PG 614 PB 2007, PG 175 ,• PROP. WATER \ EASEMENT 7.5' \ O FROM LOCATION P / OF EXI�NG / \ go WATER MAIN APPROXIMATE LOCATION OF GAS LINE PER NC811 MARKINGS. PAVEMENT � ^�00` /� // / REMOVAL/REPLACEMENT AND BORING 0/ (HORIZONTAL DIRECTIONAL DRILLING) 1D / / / NEEDED FOR SERVICE IN THIS LOCATION. / / / I bo CONTRACTOR TO VERIFY LOCATION AND G0 E�/ / / �� l m \ \ DEPTH PRIOR TO CONSTRUCTION OF 06 \ PROP. TAPPING SADDLE CONNECTION TO EX. 8" \ WATER MAIN \ PROP. 2" TYPE K COPPER WATERLINE / PROP. 2" WATER METER / / N/F / / / / / PRPVC FORC MAINS I TRACT 1 — TRAMWAY 5TAT/ON LLC / PIN.- 9631-44-6655 \, OB 1274, PG 61 PROP. 2" TYPE K COPPER WATER METER STUB. PB 2007, PG 261 TO BE CAPPED FOR FUTURE / PROP. POLE MOUNTED S I I \ CONNECTION BY TENANT �/ TRANSFORMER TO BE PROP. 90° BEND \ PROP. CONNECTION TO EX. GAS LINE 1-1< 1. INSTALLED ON EX. DUKE POLE PROP. APPING SLEEVE AND VALVE/ � PROP. E-ONE GRINDER PUMP (W PROP. 1" IRRIGATION METERSERIES DUPLEX 48"A62") AND 1.25" CONNECTION TO EX. 8" WATER MAIN , / / / / FORCEMAIN. CONTRACTOR TO PLUG COPPER / �°O 1-1 / / A. FMB GRAVITY INVERT IN FOR 6" LINE FOR PROP. 1" TYPE /� / PROP. CONNECTION TO FM FUTURE CONNECTION BY TENANT WATER SERVICE / / PDG GRAVITY NETWORK _ PROP. DUPLEX IQ) or ALARM PANEL W/ All 0 STUB TO BE CAPPED FOR FUTURE O PROP. BENDS / O RECEPTACO E CONNECTION BY TENANT i �' �STORAGE / /� / / • �,• ° PROP. GENERAL TANK BY NATURAL GAS GENERATOR OR CT 1 UTILITY POLE/GUY WIRE TO BE PROTECTED DURING / / / / I " OTHERS APPROVED EQUAL TRA CONSTRUCTION. HEIGHT TO BE RESET TO MATCH PROP. P/NE RESERI/E LLC GRADES (POSSIBLE RELOCATION OF OH LINES PENDING - s PIM 9631-44-1034 COORDINATION WITH DUKE ENERGY) vp0 /' ---1 � � DB 1563 PG 936 / 1� j ONSITE ROOF AND STORM PB 2020, PG 136 i / pp / / I a SYSTEM BY OTHERS o �� / s G X/ I � •s A. \\ /\°� (' PROP. RCP TO BE ENCASED IN CONCRETE O < a• COLLAR TO EXTEND TO Z EACH SIDE OF WALL AND BOND BREAKER TO BE PLACED IN �• a BETWEEN RCP AND CONCRETE COLLAR s s � ° PP \�6 P x GREASE TRAP BY OT OF HERS p0E �� ... °�— ' s J \\ 4.54 ° _40- N/F BETTY SUE FARREL \ MCNE/LL \ PIN.- 9631-43--0400 ESTATE BOOK 91-E-150 2� Vo 0 N PROP. SEMI PERMANENT TYPE 3 BARRICADE S S43031'42"E 53.52' 0o LOD j\00 �O r C� O I I Q O r co c I Ln 0 N 1Q. 6' 0 0 J 0 0 J 0 0 J 0 0 J 0 0 2' 0 0 J 0 0 J N p S11 100 UTILITY NOTES 1. ALL MATERIALS & CONSTRUCTION METHODS SHALL BE IN ACCORDANCE WITH CITY OF SANFORD DESIGN STANDARDS, DETAILS & SPECIFICATIONS. 2. UTILITY SEPARATION REQUIREMENTS: A. A DISTANCE OF 100' SHALL BE MAINTAINED BETWEEN SANITARY SEWER & ANY PRIVATE OR PUBLIC WATER SUPPLY SOURCE SUCH AS AN IMPOUNDED RESERVOIR USED AS A SOURCE OF DRINKING WATER. IF ADEQUATE LATERAL SEPARATION CANNOT BE ACHIEVED, FERROUS SANITARY SEWER PIPE SHALL BE SPECIFIED & INSTALLED TO WATERLINE SPECIFICATIONS. HOWEVER, THE MINIMUM SEPARATION SHALL NOT BE LESS THAN 25FROM A PRIVATE WELL OR 50' FROM A PUBLIC WELL. B. WHEN INSTALLING WATER &/OR SEWER MAINS, THE HORIZONTAL SEPARATION BETWEEN UTILITIES SHALL BE 10'. IF THIS SEPARATION CANNOT BE MAINTAINED DUE TO EXISTING CONDITIONS, THE VARIATION ALLOWED IS THE WATER MAIN IN A SEPARATE TRENCH WITH THE ELEVATION OF THE WATER MAIN AT LEAST 18" ABOVE THE TOP OF THE SEWER & MUST BE APPROVED BY THE PUBLIC UTILITIES DIRECTOR. ALL DISTANCES ARE MEASURED FROM OUTSIDE DIAMETER TO OUTSIDE DIAMETER. C. 5.0' MINIMUM HORIZONTAL SEPARATION IS REQUIRED BETWEEN ALL SANITARY SEWER & STORM SEWER FACILITIES, UNLESS DIP MATERIAL IS SPECIFIED FOR SANITARY SEWER. D. MAINTAIN 18" MIN. VERTICAL SEPARATION AT ALL WATERMAIN & RCP STORM DRAIN CROSSINGS; MAINTAIN 24" MIN. VERTICAL SEPARATION AT ALL SANITARY SEWER & RCP STORM DRAIN CROSSINGS. WHERE ADEQUATE SEPARATIONS CANNOT BE ACHIEVED, SPECIFY DIP MATERIALS & A CONCRETE CRADLE HAVING 6" MIN. CLEARANCE. E. ALL OTHER UNDERGROUND UTILITIES SHALL CROSS WATER & SEWER FACILITIES WITH 18" MIN. VERTICAL SEPARATION REQUIRED. 3. CONTRACTOR SHALL MAINTAIN CONTINUOUS WATER & SEWER SERVICE TO EXISTING BUSINESSES THROUGHOUT CONSTRUCTION OF PROJECT. ANY NECESSARY SERVICE INTERRUPTIONS SHALL BE PRECEDED BY A 24 HOUR ADVANCE NOTICE TO THE CITY OF SANFORD PUBLIC UTILITIES DEPARTMENT. 4. IT IS THE DEVELOPER'S RESPONSIBILITY TO ABANDON OR REMOVE EXISTING WATER & SEWER SERVICES NOT BEING USED IN REDEVELOPMENT OF A SITE UNLESS OTHERWISE DIRECTED BY THE CITY OF SANFORD PUBLIC UTILITIES DEPARTMENT. 5. ALL UTILITY CROSSING ELEVATION CALLOUTS ARE APPROXIMATE AND SHOULD BE FIELD VERIFIED BY THE CONTRACTOR. ENSURE MINIMUM VERTICAL SEPARATIONS ARE MET. 6. CONTRACTOR TO COORDINATE UTILITY TRENCHING AND INSTALLATION WITH OWNER'S REPRESENTATIVE TO ENSURE MINIMAL INTERRUPTION TO TRUCK DELIVERIES TO EXISTING TENANTS. 7. NCDOT ENCROACHMENT AGREEMENTS ARE REQUIRED FOR ANY UTILITY WORK (INCLUDING MAIN EXTENSIONS & SERVICE TAPS) WITHIN STATE ROW PRIOR TO CONSTRUCTION. 8. UNDERGROUND UTILITY LOCATIONS SHOWN ARE TO STANDARD OF ACCURACY BASED ON UTILITY MARKOUT METHOD NOTED IN SURVEY. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING CONSTRUCTION OF RELATED ADJACENT INFRASTRUCTURE. 9. CONTRACTOR TO REPLACE EXISTING FORCE MAIN BUT WILL UTILIZE THE EXISTING SLEEVE UNDER CENTER CHURCH ROAD IF IN GOOD CONDITION. EXISTING SLEEVE MUST BE INSPECTED BY CONTRACTORS. CONTRACTOR TO PROVIDE REPORTS TO ARISTA AND SHEETZ. IF FOUND UNSATISFACTORY, THE REPAIRS WILL BE COMPLETED BEFORE PAD ACCEPTANCE BY SHEETZ. F- J J a W a Z W W mij 0 0 W W J 0 coca cD Z W W W U) z �� W Z LZLI�z W> W(DgU -Uof (DzLLJWU)>W Z}(DD0YU) W Q = W z J>ZUWU)O 5 Q W m — cnQQZQ O�Q�LLJ z�� 0ZQH—O Z aO0 `/'�c�/� Q � Z 0- > J H U W I — REVISIONS REV DATE I COMMENT Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. DRAWN BY ■ AS -BUILT THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: NCR211038 DRAWN BY: JME CHECKED BY: OAK DATE: 05/30/2023 CAD I.D.: UTIL - 0 PROJECT: SHEETZ AS -BUILT DOCUMENTS FOR OAT� Development, 1. LC PROPOSED DEVELOPMENT 2304 JEFFERSON DAVIS HWY SANFORD,NC BOHLERI BOHLER ENGINEERING NC, PLLC NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone: (919) 578-9000 NC@BohlerEng.com \\11111111I// // o f' °SS �° °° �° o SEAL = lo 06542 ol o o ._ oo A ''//1111111 1�\ SHEET TITLE: UTILITY PLAN SHEET NUMBER: C-501 30 15 7.5 0 30 1 "= 30' ORG. DATE - 05/30/2023 500 495 LU 1 W EL z a LU LD U W O 11 490 485 v - N Lc N C o- cn EX. TRAFFIC BOX TO EX. TELEPHONE PEDESTAL TO REMAIN_ EX. F/BER OPTIC VAULT TO REMAIN ELECTRIC VAULT EX. SPEED L/MIT 51ON TO BE RESET /F D/S, / / , , , N/F WAZ TRUST PROPERTIES j INC ; PIN- 9631-44-5163 DB /172 PG 614 PB 2007, PG 175 ' I � 01�p ---------------- Ro OR 9 i / 1 I D I / / GI h I SAN 5f05? MANHOLE.• y10 R/M=496.75' 4" D/P /NV /N = 492.49 #10PO� ;~ 8" DIP 31 INV OUT = 49095' � r c / c T I PROP. FM TO CONNECT INTO EX. O ; GRAVITY MANHOLE. COAT INTERIOR OF EX. MH WITH MIN. 80-MIL THICKNESS EPDXY COATING \ � / I 1 > PROP. 4" DIP CASING PIPE I'I � I OH l I oN i ' X \ ® TRAFFIC I K;0 ItY O O !OD I 1{0 SIGNAL H i Ili o /off f I � y III /' ---------- O��Fl4, /j/� / - /N �� , �,`I ,� \ �. PROP. 1.25" SCH 40 �`� PVC FORCEMAIN M i r♦0/N 0/ %` Ili No I / PROP. SW / -- ----- N \ `� \\i x� i / x I , PROP. POLE MOUNTED' OUNTED \ I ^ I T / TRANSFORMER TO BE INSTALLED ON EX. DUKE POLE PROP. E-ONE GRINDER PUMP (W SERIES DUPLEX 48"x162") AND 1.25" > / 40+50 , FORCEMAIN. CONTRACTOR TO PLUG , LOD ' I, ON III I I , HO ' I II' I H0_ O `A ' o i II i c i �h d rn II i o � c � I r / / c 1 I I 1 I I I ` I, � o I �II Illo Vi' N �� FM GRAVITY INVERT IN FOR 6" LINE FOR PROP. CONNECTION FUTURE CONNECTION BY TENANT --- PDG GRAVITY NETWORK r PROP. DUPLEX ALARM PANEL W/ I ' \ 1 FUTURE 2,500 GALLON STORAGE ' 4 ,: / GENERATOR \\ O TANK & GRAVITY SYSTEM TO BE i \O' -- RECEPTACLE \ INSTALLED BY OTHERS ' f c STORAGE --_ PROP. GENERAL 20kW TANK BY NATURAL GAS GENERATOR OR OTHERS APPROVED EQUAL `�` iQN� /A n\ I\ I� I , I , I I 1 /9 ' rn ' I I I 1 I I I 1 I I I PUMP STATION NOTES 1. THIS PUMP STATION IS DESIGNED FOR 2,000 GALLONS PER DAY (GPD) AVERAGE FLOWS. A 2.50 PEAKING FACTOR HAS BEEN APPLIED, RESULTING IN AN ESTIMATED 4.0 GALLONS PER MINUTE (GPM) PEAK INFLUENT RATE. WITH A TOTAL DYNAMIC HEAD (TDH) OF 31-FT, THE SYSTEM WILL OPERATE AT 14 GPM. 2. 24-HOUR STORAGE WILL BE PROVIDED WITH A 2,500 GALLON TANK TO ALLOW FOR PUMP AND HAUL IN THE EVENT OF A BLOCKAGE IN THE FORCE MAIN OR DOWNSTREAM SEWER. PABST DESIGN GROUP IS RESPONSIBLE FOR THE DESIGN OF THE STORAGE TANK. REFER TO THEIR LATEST PLAN SET FOR EXACT INVERTS & VAULT DIMENSIONS. 3. ALL PUMP STATION COMPONENTS SHALL BE SUPPLIED BY ENVIRONMENT ONE (OR APPROVED EQUAL). 4. ALL ABOVE GRADE ENCLOSURES INSTALLED SHALL BE PAD LOCKABLE AND NEMA 4X. 5. ALL WIRE INSTALLED SHALL BE COPPER. 6. ALL LOCATIONS WHERE PIPES ENTER OR LEAVE THE WET WELL OR VAULT SHALL BE MADE WATERTIGHT WITH ALL SLEEVE OR NON -SHRINK GROUT. 7. SENTRY ADVISOR T260 DUPLEX AND SENTRY PROTECT PLUS DUPLEX SHALL BE COMBINED INTO ONE PANEL. MANUFACTURER'S PANEL SHALL INCLUDE A GENERATOR CONNECTION, MANUAL TRANSFER SWITCH, AND CELLULAR MODEM SENTRY ADVISOR T260 DUPLEX. 8. THE LOCATION OF THE EXISTING FM SLEEVE & CROSSING IS AN APPROXIMATION AND WAS DRAWN PER VIDEO INSPECTION PROVIDED BY PIPETECHS PLUMBING ON 10/24/22 & 11/10/22. 9. CONTRACTOR TO FIELD VERIFY EXISTING SLEEVE UNDER CENTER CHURCH RD. 10. EXISTING SLEEVE MUST BE INSPECTED BY CONTRACTOR. REUSE SLEEVE IF IN GOOD CONDITION. CONTRACTOR TO PROVIDE REPORTS TO ARISTA AND SHEETZ. IF FOUND UNSATISFACTORY, THE REPAIRS WILL BE COMPLETE BEFORE PAD ACCEPTANCE BY SHEETZ. 11. CONTRACTOR TO FIELD VERIFY ALL UTILITIES WITHIN THE NCDOT ROW PRIOR TO INSTALLATION OF FM PIPE. 12. CONTRACTOR TO INSTALL SHORING AS NEEDED FOR CONSTRUCTION WITHIN ROW. TEMPORARY SHORING IS ANTICIPATED BASED ON THEORETICAL 2:1 SLOPE FROM BOTTOM OF PROPOSED EXCAVATION TO EXISTING GROUND LINE. CONTRACTOR TO COMPLY WITH ALL REQUIREMENTS OF APPROVED NCDOT ENCROACHMENT PERMIT. 30 15 7.5 0 30 1 "= 30' FUTURE EDnF nF PAUFnnFNiT I IMITS DONE BY NCDOT FUTURE EDGE OF PAVEMENT LIMITS DONE BY NCDOT I CENTER CHURCH RD, EDGE OF PAVEMENT TO EDGE OF PAVEMENT /II EX. GRADE PROPERTY L/NE I I I APPROXIMATE LOCAT/ON OF EX. EX. 54N 5fX5? MH. APPROX/MATE LOCAT/ON OF EX. ELECTRIC TELEPHONE LINES CONTRACTOR TO COAT INTER/OR OF EX. MH WITH YIN. L/NE. CONTRACTOR TO F/ELD VER/FY AND FIELD VERIFY AND ENSURE ADEQUATE 80-M/L THICKNESS EPDXY COAT/NG \ ENSURE ADEQUATE 19" VERT/CAL I 18" VERT/CAL SEPARAT/ON. y SEPARAT/ON. ' APPROX/MATE LOCAT/ON OF EX. APPROX/MATE LOCAT/ON OF EX. F/BER TELEPHONE LINES. CONTRACTOR TO I OPT/C LINES. CONTRACTOR TO F/ELD PROP. 4' E-ONE GRINDER PUMP &WET PROP. GRADE - - - _ _ _ _ - F/ELD VER/fY AND ENSURE ADEQUATE VER/FY AND ENSURE M/N/MUM 18" WELL (W SERIES DUPLEX 48"xl62"). - 18" VERT/CAL SEPARATION. VERT/CAL SEPARAT/ON. ' � I I APPROX/MATE LOCAT/ON OF EX. F/BER OPTIC LINES. CONTRACTOR TO F/ELD VERIFY AND ENSURE M/N/MUM 18" PROP. 10'X20' BORE PIT I �� I I VERT/CAL SEPARAT/ON. \ PROP. RECEIVING PIT oo I ; EX. 4" D/P /NV /N = 492 49' CONTRACTOR TO REMOVE 4 " P/PE AND PL UC MH I I APPROX/MATE LOC,.4T/ON OF EX. 8" IMATERL/NE. oo i i INV IN = ±491.50' � z_ CONTRACTOR TO ENSURE M/N/MUM 18" VERT/CAL I ' i I ' APF/ OX/MA/E /NV OUT OF EX. 8" SEPARATION. I I CRAV/TY L/NE. CONTRACTOR TO VER/fY FM IS ENTER/NC THE MANHOLE ABOVE THIS INVERT. s F LOCAT/ON OF EX. CAS /NV OUT = 490 95' °r � LINE. CONTRACTOR TO FIELD PEFFY AND ENSURE M/N/MUM 18" VERT/CAL SEPARAT/ON. APPROXIMATE LOCATION OF EX. 8" &TERLINE. CONTRACTOR TO ENSURE M/N/MUM 19" VERTICAL VPROP. SEPARAT/ON. FM INV OUT = ±488.72' 1.25" SCH 40 PVC FORCEMAIN PROP. ±65LF OF 4" DIP CASING. FUTURE 2,500 GALLON STORAGE TANK INSTALLED / BY OTHERS. i EX. OWE \� I I I TY NVERT _ 485.93 GONITRACTCA. TO PLUG G INVERT FOR FUTURE RE TCNIANIT GONNECTIONI SHEETZ CONTRAC OR TO CORE CRAV17Y L/NE INVERT AT ' SPEC/FIFO ELEVA N ONCE CR 17Y LINE /S INSTALLED. J J a Wz a mmim W W Z W Ili OLU J coca (D Z_ Of w w w U) Z F-� w Z LLU F- W U LU(DgU U�of (OZwww5w Z}CDF-D0YU) � w Q = w Z > Z 0 W W 0 U)�Q�m(D1- Z U w Z Z L_ 0ZQQQ~O z Q U) U) Q �zW0z 5;J H U w I- U) REVISIONS REV I DATE I COMMENT Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. AS -BUILT o� wo O U zN o Q _10 00 o om wN za oaw a o Ian ww� 0N= aoo ow wm om U K 0 ao 00 oQ 0 DRAWN BY ■ THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: NCR211038 500 DRAWN BY: JME CHECKED BY: OAK DATE: 05/30/2023 CAD I.D.: GRAD - 0 PROJECT: SHEETZ AS -BUILT DOCUMENTS FOR OAT� Development, LLC PROPOSED DEVELOPMENT 2304 JEFFERSON DAVIS HWY SANFORD,NC BOHLERI 490 BOHLER ENGINEERING NC, PLLC NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone: (919) 578-9000 NC@BohlerEng.com \\� o,o°SS �° o% o o SEALo = o 06542 o .o� °°°° I°° ° R A 0/1 1, SHEET TITLE: FORCEMAIN PROFILE 10+00.00 10+50.00 11+00.00 11+50.00 12+00.00 12+50.00 13+00.00 13+50.00 14+00.00 14+50.00 15+00.00 SHEET NUMBER: PROPOSED FORCEMAIN C-801 SCALE: V= 20' HORIZONTAL 20 10 5 0 20 1 "= 2 ' VERTICAL 1"=20' ORG. DATE - 05/30/2023