HomeMy WebLinkAboutWQCS00139_2023 Annual Wastewater Performance Report_20240630TOWN OF OLD FORT WASTEWATER
COLLECTION & TREATMENT
PERFORMANCE REPORT FOR FISCAL
YEAR JULY 11 2023, to JUNE 30, 2024
SYSTEM. Town of Old Fort
Wastewater Treatment Plant
RESPONSIBLE ENTITY: Town of Old Fort, Phone # 828-668-4244
OPERATORS IN CHARGE:
COLLECTION SYSTEM: Josh Cagle, Phone #828-668-4561
TREATMENT PLANT: Josh Cagle, Phone #828-668-4561
APPLICABLE PERMITS:
COLLECTION SYSTEM: WQCS00139
NPDES (WASTEWATER TREATMENT PLANT): NCO021229
BIORESIDUAL MANAGEMENT FACILITY: WQOOI 1260 (RESCINDED)
DESCRIPTION OF COLLECTION SYSTEM:
The sewer system collects wastewater from the Town of Old Fort and the surrounding area and
transports it by gravity to the Old Fort Wastewater Treatment Plant (WWTP) located on the west bank
of Curtis Creek, just east of town. There are currently no pumping stations needed in the Old Fort
collection system.
DESCRIPTION OF WASTEWATER TREATMENT PLANT:
The original waste treatment plant was built in 1967, upgraded in 1987 to a capacity of 800,000
gallons per day (gpd), and upgraded again in 1996 to a capacity of 1.2 million gallons per day (1ngd). In
2003-2004 the plant was again refurbished with a grant of approximately $1.5 million from the NC
Rural Center.
All wastewater is moved through the following processes:
BAR SCREEN — removes larger pieces of trash, rags, etc.
GRIT CHAMBER — removes fines sand -like material that is damaging to equipment.
INFLUENT PUMP STATION --- pumps wastewater to equalization basin or aeration tank.
EQUALIZATION BASIN — contains the wastewater, allowing a constant flow through the rest
of the plant.
AERATION TANK — waste is treated by concentrating, mixing, and adding air; bacteria and
other micro-organisms break down the solid and liquid waste to a less harmful form.
CLARIFIERS — allows solids to settle out while clearer water passes on.
CHLORINE CONTACT CHAMBER — bleach (sodium hypochlorite) is added to disinfect the
wastewater, and calcium thiosulfate is added to remove the residual chlorine.
The treated wastewater is the discharged to Curtis Creek, which is a contributor to the Catawba
River.
Settled solids from the clarifiers are pumped to a sludge holding tank. From there the sludge is
dewatered on a belt press and put into a container then transport by Republic Services to Caldwell
County Landfill Foothills Env.
PERFORMANCE:
COLLECTION SYSTEM (SEWER) - In the 2023 — 2024 report period, there were no pen -nit
violations. The Old Fort Maintenance Department replaced approximately 375 feet of sewer line and
cleaned approximately 3,500 feet of sewer pipe. The sewer department with the help of the maintenance
department camera 1,500 feet of sewer line.
WASTEWATER TREATMENT PLANT: In this report period, the Old Fort Wastewater Treatment
Plant had no pen -nit violations. The Town completed the projects of replacing the automatic transfer
switch. The (ATS) automatically switches power from the inain power to the backup generator in case
of a power outage. Completed upgrading the return activated sludge (RAS). The upgrade consists of
new check valves, stainless steel pipe, new rail systems, and new pumps. The town upgraded the
automatic bar screen with new variable speed controls. This better controls the speed of the belt. The
town upgraded the surface aerators with new contactors in the control panels.
CERTIFICATION:
I certify under penalty of law that this report is complete and accurate to the best of any
knowledge. I further certify that this report has been made available to the users or customers of the
named system and that those users have been notified of its availability.
Q,,� iF7u-,-, v� L-1, -
Iretha Hancock
Mayor Protein, Town of Old Fort
-71 ��A L
Date
NOTIFICATION:
The Town of Old Fort placed a Public Notice on the Town of Old Fort's web site
(www.townofoldfort.org/sewer). Any customer desiring to obtain a copy of the perfonnance report may
do so by requesting one at Old Fort Town Hall.