Loading...
HomeMy WebLinkAboutNC0025453_Historical information_20051231 (2)Michael F. Easley, Governor February 22, 2005 Subject: Dear Mayor McLeod: on An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Construction Grants and Loans Section 1633 Mail Service Center Raleigh NC 27699-1633 Phone: 919-733-6900/ FAX: 919-715-6229 / Internet: www.nccgl.net It is the responsibility of the recipient and the consulting engineer to insure that the project plan documents are in compliance with Amended N.C.G.S. 133-3 (ratified July 13, 1993). The administrative review and approval of addenda do not imply approval of a restrictive specification for bidding purposes; nor is it an authorization for noncompetitive procurement actions. A copy of the approved addendum is attached for your files, and one (1) copy retained for our files. The proposed addendum, as described in the attachment, has been reviewed by this office, and is hereby approved, and eligible for funding in accordance with the loan offer and conditions thereof. Reference is made to Addendum No. 3, received February 22, 2005 from the engineer for revisions to the subject project. The Honorable Jody L. McLeod, Mayor Town of Clayton Post Office Box 879 Clayton, North Carolina 27520-0879 Adequate time must be allowed for the potential bidders and this office to receive and act addenda prior to the receipt of bids for subject project. WWTP Improvements Town of Clayton Approval of Addendum No. 3 Project No. CS 370431-04 Alan W. Klimek. P.E. Director Division of Water Quality The approval of this addendum does not constitute any change in the amount of your loan for this project. William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources & r X TOne 1 1 • NorthCarolina Naturally go |\| I k; Sincerely, § ID/dr l V Attachment cc: /K- The Honorable Jody L. McLeod, Mayor Page 2 February 22, 2005 Should you have any questions regarding this matter, please do not hesitate to contact Ishwar Devkota, P.E. at (919) 715-6222. Cecil G. Madden, Jr. P. E., Supervisor Design Management Unit Construction Grants & Loans Section co co u1 The Wooten Company (Dr. Shankar R. Mistry, P.E.) Raleigh Regional Office, Surface Water Protection Daniel Blaisdell, P.E. Ishwar Devkota, P.E. Valerie Lancaster Amy Simes, P.E. Cecil G. Madden, Jr., P.E. CS 370431-04 Michael F. Easley, Governor February 18, 2005 / ✓ Subject: Dear Mayor McLeod: An Fnual Onnnrtiinitv/Affirmative Action t-mnlnvpr- Rocvclpd/in0:-. Pnc* Onnsumor Pannr Construction Grants and Loans Section 1633 Mail Service Center Raleigh NC 27699-1633 Phone: 919-733-6900 / FAX: 919-715-6229 / Internet: wvyw.nccgl.net The proposed addendum, as described in the attachment, has been reviewed by this office, and is hereby approved, and eligible for funding in accordance with the loan offer and conditions thereof. The approval of this addendum does not constitute any change in the amount of your loan for this project. Adequate time must be allowed for the potential bidders and this office to receive and act on addenda prior to the receipt of bids for subject project. A copy of the approved addendum is attached for your files, and one (1) copy retained for our files. The Honorable Jody L. McLeod, Mayor Town of Clayton Post Office Box 879 Clayton, North Carolina 27520-0879 Alan W. Klimek. P.E. Director Division of Water Quality Reference is made to Addendum Number 2, received February 1 7, 2005 from the engineer for revisions to the subject project. It is the responsibility of the recipient and the consulting engineer to insure that the project plan documents are in compliance with Amended N.C.GvS. 133-3 (ratified July 13, 1993). The administrative review and approval of addenda do not imply approval of a restrictive specification for bidding purposes; nor is it an authorization for noncompetitive procurement actions. O % WWTP Improvements Town of Clayton Approval of Addendum No. 2 Project No. CS 370431-04 William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources NorthCarolinaNaturallu 1 ID/dr Attachment cc: The Honorable Jody L. McLeod, Mayor Page 2 February 18, 2005 Should you have any questions regarding this matter, please do not hesitate to contact Ishwar Devkota, P.E. at (919) 715-6222. The Wooten Company (Dr. Shankar R. Mistry, P.E.) Raleigh Regional Office, Surface Water Protection Daniel Blaisdell, P.E. Ishwar Devkota, P.E. Valerie Lancaster Amy Simes, P.E. Cecil G. Madden, Jr., P.E. CS 370431-04 Sincerely, Cecil G. Madden, Jr. P. E., Supervisor Design Management Unit Construction Grants & Loans Section Engineer's Certification Signature Registration No. Date Send to: I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Town of Clayton A To C No. 025453A03 Issued February 17, 2005 Construction Grants & Loans DENR/DWQ 1633 Mail Service Center Raleigh, NC 27699-1633 I,, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Little Creek Water Reclaimation Facility, located in Johnston County for the Town of Clayton, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: A new 214,500 gallon anaerobic basin; one new 300,000 gallon anoxic tank, one new 200,000 gallon anoxic tank; modifications to the existing aeration basins; a new 360,000 gallon sludge holding/digestion tank with two blowers each having 1100 SCFM of aeration capacity, and twolO HP submersible mixers, instrumentation, site work, piping, electrical work, and associated appurtenances, pursuant to the letter of request received on December 29, 2003, and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. We understand that the new limits associated with the modifications to expand to 2.5 MGD now apply. February 14, 2005 SUBJECT: Dear Mr. Biggs: 1. 2. Construction Grants and Loans Section 1633 Mail Service Center Raleigh NC 27699-1633 Phone: 919-733-6900/ FAX: 919-715-6229/ Internet: www.nccgl.net An Equal Opponunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper As you were notified by letter from Governor Easley, the Town of Clayton has been approved for loan assistance from the Water Pollution Control Revolving Fund in the amount of $4,450,000. i his loan will assist the funding for nutrient removal and sludge handling improvements at the Little Creek Water Reclamation Facility. Mr. R. Steven Biggs, Town Manager Town of Clayton P.O. Box 879 Clayton, North Carolina 27520 One (1) copy of the original Offer and Acceptance Document executed by the authorized representative for the project. Retain the other copy for your files. A resolution adopted by the governing body accepting the loan offer and making the applicable assurances contained therein. (Sample copy attached) Alan W. Klimek, P.E. Director Division of Water Quality CERTIFIED MAIL RETURN RECEIPT REQUESTED Offer and Acceptance For a Slate Loan Project No. CS370431-04 Town of Clayton, North Carolina Enclosed are two (2) copies of an Offer and Acceptance Document extending a State Revolving loan in the amount of $4,450,000. This offer is made subject to the assurances and conditions set forth in the Offer and Acceptance Document. Upon executing the Offer and Acceptance Document, please submit the following items to the Construction Grants and Loans Section, 1633 Mail Service Center, Raleigh, North Carolina 27699-1633 within forty-five (45) days of receipt. ^^^vlichael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources _ TOneNorthCarolinaNaturally > Q •W|if Sincerely, ST/sd Enclosures cc: Mr. R. Steven Bigga February 14, 2005 Page 2 /ohn R. Blowe, P.E., Chief Construction Grants & Loans Section Raleigh Regional Office Valerie Lancaster SRF In addition, the enclosed pay request form must be used for all reimbursement requests. You may make additional copies as needed. Also, enclosed is a copy of a memorandum requesting your Federal Identification Number. Please contact the State Auditors office for the compliance pertaining to the North Carolina Clean Water Revolving Loan and Grant Program. On behalf of the Department of Environment and Natural Resources, I am pleased to make this offer of State Revolving Loan funds made available by the North Carolina Clean Water Revolving Loan and Grant Act of 1997 and the Federal Clean Water Act Amendments of 1987. In accordance with G.S. 159-26(b)(6), a capital project fund is required to account for all debt instrument proceeds used to finance capital projects. It is required that a capital project ordinance, in accordance with G.S. 159-13.2, be adopted by the governing board authorizing all appropriations necessary tor the completion of the project. A copy of the approved ordinance must be submitted to this office before requesting the first reimbursement request. Michael F. Easley, Governor February 10, 2005 SUBJECT: Dear Mayor McLeod: on Construction Grants and Loans Section 1633 Mail Service Center Raleigh NC 27699-1633 Phone: 919-733-6900 / FAX: 919-715-6229 / Internet: www.nccgl.net A copy of the approved addendum is attached for your files, and one (1) copy retained for our files. Reference is made to Addendum No. 1, received February 9, 2005 from the engineer for revisions to the subject project. I he approval of this addendum does not constitute any change in the amount of your loan for this project. The Honorable Jody L. McLeod, Mayor Town of Clayton Post Office Box 879 Clayton, North Carolina 27520-0879 Adequate time must be allowed for the potential bidders and this office to receive and act addenda prior to the receipt of bids for subject project. WWTP Improvements Town of Clayton Approval of Addendum No. 1 Project No. CS 370431-04 Alan W. Klimek, P.E. Director Division of Water Quality It is the responsibility of the recipient and the consulting engineer to insure that the project plan documents are in compliance with Amended N.C.G.S. 133-3 (ratified July 13, 1993). The administrative review and approval of addenda do not imply approval of a restrictive specification for bidding purposes; nor is it an authorization for noncompetitive procurement actions. The proposed addendum, as described in the attachment, has been reviewed by this office, and is hereby approved, and eligible for funding in accordance with the loan offer and conditions thereof. William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources 'X>& co > Q NorthCarolinaXaturalluFnnal Clnnnrti mitv/Affirmativa Artinn Pmnlnvor- ^H0/- Par\/rloH/in°/- Pnct Cnncnmar Donor Sincerely, ID/dr Attachment cc: - c / The Honorable Jody L. McLeod, Mayor Page 2 February 10, 2005 Should you have any questions regarding this matter, please do not hesitate to contact Ishwar Devkota, P.E. at (919) 715-6222. The Wooten Company (Dr. Shankar R. Mistry, P.E.) Raleigh Regional Office, Surface Water Protection Daniel Blaisdell, P.E. Ishwar Devkota, P.E. Valerie Lancaster Amy Simes, P.E. Cecil G. Madden, Jr., P.E. CS 370431-04 Cecil G. Madden, Jr. P. E., Supervisor Design Management Unit Construction Grants & Loans Section 03-07-2005 09:22AM P.001/002 F-520 ^^<3 MAGNAFAX TRANSMITTAL Date: To: Location: 1Fax No. £ /^y Location: Pagettto Follow A-5 From: _ Fax No. S'! I-l-'l/g S/zk.cJ~ (919) 715-6229 Tele: (919) 7/^~- G 7 DWQ - Construction Grants & Loans Section I FROM-CiAcgftants And Loans T-928 OF ^KlRONMENT AND NA TURALEE^^CES DIVISION OF WATER QUALITY FRO Grants And Loans 9197151 Full , as a duly registered ProfessionalMichael C. Wicker, P.E.I, aving been authorized to observe 1 t. 57/^7/^ fo hereby states that with the best of my abilites, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. rated at 75 HP to replace one 50 HP) SIGNATURE 7/26/02DATENC 11325REGISTRATION NO. c; j PROFESSIONAL ENGINEER’S CERTIFICATION X 4 OF CLAYTON (OWNER) ON WWTP UPGRADE CT NAME) NC, JOHNSTON COUNTY LOCATION) >453ACD, May 24, 2001 1IT NO.) Replacement of two existing Carousel aerators (one rated at 50 HP to replace one existing 25 HP aerator, one 1----- Addition of a 65 foot clarifier, all additional piping, valves, control equipment and appurtenances. 03-07-2005 09:22AM T-928 P.002/002 F-520 > <- ■ April 26, 2005 Subject: Dear Mr. Biggs: Phone (919) 791-4200 FAX (919)571-4718 Alan W. Klimek, P.E. Director Division of Water Quality 3. Talecris, another pharmaceutical SIU, is proposing a new process for its waste treatment. The SIU wants to add a fixed film reactor and a DAF unit with hopes of reducing COD concentrations in its process water. Mr. Warren sought the aid of S.T. Wooten for third party approval. Pretreatment Compliance Inspection Report Program: Town of Clayton Johnston County NPDES Number NC0025453 Mr. Steve Biggs, Town Manager Town of Clayton P.O. Box 879 Clayton, NC 27520 1. There are currently 3 Significant Industrial Users (SIU) discharging to the POTW, all of which are Categorical Industrial Users (CIU). Novo Nordisk, a pharmaceutical SIU, was found to be in SNC for the first semi-annual monitoring period of 2005 for acetone violations. The industry does not use acetone anywhere in its process. Mr. Warren believes the acetone could possibly originate from the EQ tank where isopropyl alcohol is exposed to sunlight and has the potential to degrade to acetone. As a result of the violations, the SIU was required to submit a plan of action to the POTW. Novo Nordisk is currently still trying to find the origins of the acetone. Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources NprthCaroli) -----------datura Hi Customer Service 1-877-623-6748 2. The Town of Clayton currently has a trading agreement with Johnston County where flow is partially diverted between the two POTWs. The pump station that services the 3 SIUs in Clayton has the capability of sending its flow to either POTW. In the past, the POTW that received greater than 50% of the flow was held accountable for pretreatment duties. In 2005, however, the percentages were extremely close, as Clayton received 50.3% of the flow and Johnston County received 49.7%. Whoever receives less of the flow will be required to get an IUP. The two POTWs are currently trying to resolve this issue of responsibility. On April 26, 2006 Mr. Christopher Wu of the Raleigh Regional Office performed a pretreatment compliance inspection with Mr. James Warren at the Town of Clayton’s Wastewater Treatment Facility. The inspection report is attached. Mr. Warren’s assistance was greatly appreciated as it facilitated the inspection process. The significant findings were as follows: rbjjca O . ' < NC DWQ/PERCS Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Internet: h2o.enr.state.nc.us/Pretreat/index.html 3800 Barrett Drive Raleigh, NC 27609 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Sincerely, You are doing an excellent job of meeting the pretreatment program goals for the Town of Clayton. Cc: Dana Folley, DWQ - PERCS Unit Chris Wu-RRO James Warren, Toami of Clayton Central Files 4. An inspection of Novo Nordisk was conducted with the assistance of Mr. David Bright, Environmental Health and Safety Manager, and Mr. Fred Seymour, Environmental Safety Specialist. Mr. Warren was very thorough in his evaluation. Christopher Wu Environmental Specialist Town of Clayton NC0025453 Thank you for your continued support of the Pretreatment Program. If you have any questions or comments, please contact Christopher Wu at (919) 791-4260 [email: Chris. Wu(£/ ncmail.net]. 5. Mr. Warren is keeping all of the files and data in a well organized fashioned. Such order eased the file review process. f 1. 2. 3. 4. 5. 6. Inspector (INSP) PSNC1 0 POTW INTERVIEW Yes KI No17. K No18. 19. 20. None KI No21. Page 1 I Filename: Clayton Revised: 6/30/98 Since the Last PCI, has the POTW had any POTW Permit Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? SNC for Limits: Novo Nordisk; acetone SNC for Reporting: None Not Published: None Main Program Permit Number I N I C I 0 I 0 I 2 I 5 I 4 I 5 I 3 I Trans.Code LnJ In spec.Type (TYPI) Yes Yes MM/DD/YY I 04 I 26 I 06 I (DTIA) 3_ 3_ £ o' £ 7 NOIN NOCM MSNC SNPS Fac. Type LU (FACC) SIUS CIUS I^h^lOLlNA DIVISION OF X^^EMMlLITY PRETREAl^^T COMPLIANCE INSPECTIO^pTl) REPORT Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass-Through, Blockage, Citizens’ Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? Which Industries have been in SNC during either of the Last 2 Semi- Annual Periods? Have any Industries in SNC (During Either of the Last 2 Semi-Annual Periods) Not Been Published for Public Notice? (May refer to PAR if Excessive SIUs in SNC) Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? Are Any Permits Or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)| Control Authority (POTW) Name: Town of Clayton Control Authority Representative(s): Mr. James Warren Title(s): WRF Superintendent Last Inspection Date: 05/20/2005 Inspection Type (Circle One): PCI Audit Has Program Completed All Requirements from the Previous Inspection or Program Info Sheet(s)? KI Yes No N/A Is POTW under an Order That Includes Pretreatment Conditions? Yes K] No Order Type and Number: Are Milestone Dates Being Met? Yes No K N/A PCS CODING 7. Current Number Of Significant Industrial Users (SIUs)?________________________________ 8. Current Number Of Categorical Industrial Users (CIUs)?________________________________ 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year?_____________________ 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year?______________________ 11. Enter the Higher Number of 9 or 10_________________________________________________ 12. Number of SIUs With No IUP, or With an Expired IUP_________________________________ 13. Number of SIUs in SNC for Either Reporting or Limits Violations During Either of the Last 2 Semi-Annual Periods (Total Number of SIUs in SNC)__________________________________ 14. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi-Annual Periods______ 15. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi-Annual Periods 16. Number of SIUs In SNC For Both Reporting and Limits Violations During Either of the Last 2 Semi-annual Periods I Program Element 01/15/200704/11/2002Headworks Analysis (HWA) 02/04/200802/07/2003Industrial Waste Survey (IWS) 08/19/1997Sewer Use Ordinance (SUO) 11/18/1998Enforcement Response Plan (ERP) Long Term Monitoring Plan (LTMP)10/02/1997 Nog] Yes 3.1. Novo Nordisk26. User Name Yes No Yes No a.nYesnNoDN/Aa-nYesDNoBN/A a-DYesDNoON/A Page 2 22. 23. 24. 25. Filename. Clayton Revised: 6/30/98 No Is the Table Adequate? PRETREATMENT PROGRAM^^^N^^E INDUSTRIAL USER PERMIT (IUP) FILE REVIEW(3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION) 2? VIEW- Please review POT Date of Last Approval □YesDNolWA □YesdNoEN/A □YesDNogN/A □YesEJNoDN/A YesDNoDN/A □YesONodN/A |g] Yes No ElYesDNodN/A laYesdNogN/A K]Yes No 0 Yes r~l No a. DYes ONo b. DYes DNo YesDNodN/A 0 Yes r~] No a. UYes DNo b. DYes UNo □YesdNodN/A a. ElYes DNo b-DYesDNoaN/A |0 Yes 0 No 0 Yes No a. E3Yes DNo b. DYes DNo dYesdNodN/A a.DYesDNoBN/A b-OYesaNoBN/A 0 Yes 0 No a. ElYes ENo b-DYesaNoDN/A 0 Yes 0 No a.nYesEINonNZA b-DYesaNoDN/A 0 Yes 0 No dYesdNodN/A 0 Yes 0 No b.qYesaNoDNZA dYesdNodN/A 0 Yes 0 No dYesdNodN/A a. qYesnNoDN/A b. qYesqNoDN/A 0 Yes 0 No 0 Yes 0 No dYesdNodN/A dYesdNodN/A 0 Yes 0 No b.BYesqNoqN/A DYesdNodN/A 0 Yes 0 No DYesdNodN/A 0003-02 0 Yes 0 No 06 / 30 / 07 439.40 0 Yes 0 No b.qYesqNoqN/A dYesdNodNM- 0 Yes 0 No dYesdNodN/A 0 Yes 0 No dYesdNodN/A 0 Yes | I No 7 7 0 Yes 0 No 7 7 ct^PFete the following:__________ Date Next Due, If Applicable LTMP FILE REVIEW: Is the LTMP Monitoring Being Conducted at Appropriate Locations and Frequencies? 0 Y< Should any Pollutants of Concern be Eliminated from or Added to the LTMP? If yes, which ones? Eliminated: Added: Are Correct Detection Levels being used for all LTMP Monitoring? 0 Yes Is the LTMP Data Maintained in a Table or Equivalent? 0 Yes 0 No es | | No 0 Yes 0 No a. EYes E)No b. qYesqNoEIN/A 0 Yes 0 No 27. IUP Number______________________________________________________ 28. Does File Contain Current Permit?__________________________________ 29. Permit Expiration Date_____________________________________________ 30. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A______________ 31. Does File Contain Permit Application Completed Within One Year Prior to Permit Issue Date?______________________________________________ 32. Does File Contain an Inspection Completed Within Last Calendar Year? 33. a. Does the File Contain a Slug Control Plan? b. If No, is One Needed? (See Inspection Form from POTW)__________ 34. For 40 CFR 413 and 433 TTO Certifiers, Does File Contain a Toxic Organic Management Plan (TOMP)?________________________________ 35. a. Does File Contain Original Permit Review Letter from the Division? b. All Issues Resolved?____________________________________________ 36. During the Most Recent Semi-Annual Period, Did the POTW Complete its Sampling as Required by IUP?___________________________________ 37. Does File Contain POTW Sampling Chain-Of-Custodies?_____________ 38. During the Most Recent Semi-Annual Period, Did the SIU Complete its Sampling as Required by IUP?______________________________________ 39. Does Sampling Indicate Flow or Production?_________________________ 40. During the Most Recent Semi-Annual Period, Did the POTW Identify All Non-Compliance from Both POTW and SIU Sampling?____________ 41. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self­ Monitoring Violations? b. Did Industry Resample Within 30 Days?___________________________ 42. Was the SIU Promptly Notified of Any Violations (Per ERP)?_________ 43. During the Most Recent Semi-Annual Period, Was the SIU in SNC? 44. During the Most Recent Semi-Annual Period, Was Enforcement Taken as Specified in the POTWs ERP?___________________________________ 45. Does the File Contain Penalty Assessment Notices?___________________ 46. Does The File Contain Proof Of Penalty Collection?__________________ 47. a. Does the File Contain Any Current Enforcement Orders? b. Is SIU in Compliance with Order?________________________________ 48. Did the POTW Representative Have Difficulty in Obtaining Any of This Requested Information For You? FILE REVIEW COMMENT:f The files were kept in good order and everything was readily accessible. PCI SUMMARY AND COMMENTS: PCI Comments: Clayton currently has a trade agreement with Johnston County. Flow is partially diverted between the two POTWs. Requirements: Recommendations: Unsatisfactory OSatisfactoryMarginal PCI COMPLETED BY: Christopher Wu DATE: 04/26/2006 INDUSTRY INSPECTION PCS CODING: Fac. Type[nspec.Type FACC)(TYPI) No Page 3 1. Industry Inspected: Novo Nordisk 2. Industry Address: 3. Type of Industry/Product: Pharmaceuticals 4. Industry Contact: David Bright, Fred Seymour Title: Environmental Health & Safety Manager, Environmental Safety Specialist Filename: Clayton Revised: 6/30/98 KI No KI No KI No Main Program Permit Number iNlclololzlsIdlsHI Trans.Code I N I Inspector (INSP) NOD: Yes NOV: Yes QNCR: Yes POTW Rating: MM/DD/YY I 04 I 26 I 06 I (DTIA) Phone: Fax: 5. Does the POTW Use the Division Model Inspection Form or Equivalent? KI Yes 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview KI Yes KI No B. Plant Tour KI Yes KI No C. Pretreatment Tour K Yes KI No D. Sampling Review K Yes KJ No E. Exit Interview K Yes KI No Industrial Inspection Comments: Mr. Warren was extremely thorough in his inspection of the SIU. “SERVICE” April 20, 2005 Re: Holding Tank Foaming Incident Town of Clayton NPDES # NC 00025453 Dear Mr. Hayes: 653 Highway 42 West • P.O. Box 879 • Clayton, North Carolina 27520 • (919) 553-1530 • Fax (919) 553-1541 VEHICLE MAINTENANCE (919)553-1530 ELECTRIC SERVICE (919)553-1530 The town is currently pursuing ways of preventing future occurrences. A high level alarm will be installed to alert plant personnel of problems, along with some procedural changes to lessen the potential of further problems. Steve Biggs Tim Simpson Mitch Hayes DWQ, Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 ETON OF CLA *0^ OPERATIONS CENTER “’’ENVIRONMENT’ As reported to Mr. Dare in your office on April 15, 2005. plant staff arrived and discovered that the sludge holding tank foamed over the side of the tank after the biosolids were lime stabilized. The incident was contained on Town property and cleaned up via vacuum truck. Approximately 7,000 gallons of rinse water was collected and treated in the plant influent. Additional lime was applied to the affected area. The incident did not pose a threat to the environment. Sincerely. C-kfmes Warren, ORC, Town of Clayton 'I --------PUBLIC WORKS ikri r^T^-335.30 ■'L ’------------WATER RECLAMATION "SERVICE" April 20,2005 Dear Mr. Hayes: Sincerely, 653 Highway 42 West • P.O. Box 879 • Clayton. North Carolina 27520 • (919) 553-1530 • Fax (919) 553-1541 Steve Biggs Tim Simpson VEHICLE MAINTENANCE (919)553-1530 ELECTRIC SERVICE (919) 553-1530 The town is currently pursuing ways of preventing future occurrences. A high level alarm will be installed to alert plant personnel of problems, along with some procedural changes to lessen the potential of further problems. As reported to Mr. Dare in your office on April 15,2005, plant staff arrived and discovered that the sludge holding tank foamed over the side of the tank after the biosolids were lime stabilized. The incident was contained on Town property and cleaned up via vacuum truck. Approximately 7,000 gallons of rinse water was collected and treated in the plant influent. Additional lime was applied to the affected area. The incident did not pose a threat to the environment. TOWN Ol OPERATIC WATER RECLAMATION (919) 553-1535 Jdmes Warren, ORC, Town of Clayton Re: Holding Tank Foaming Incident Town of Clayton NPDES # NC 00025453 Mitch Hayes DWQ, Raleigh Regioni_ . 1628 Mail Service Center Raleigh, NC 27699-1628 Co. Phone# Fax# 'S 'i.' jonal Office '•V TOWNOFCLAMj^ N Poet-it* Fax NoS^ coTd^T Phon®# Fax # 04/20/2005 13:46 1553 Michael F. Easley, Governor April 11,2005 Dear Mr. Gutierrez: Sincerely, cc: An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper MR. JAMES WARREN WRF SUPERINTENDENT TOWN OF CLAYTON P.O. BOX 879 CLAYTON, NC 27520 The Central and Regional Offices have reviewed the Pretreatment Annual Report (PAR) covering January through December 2004. This PAR was received on March 2, 2005. The PAR is considered complete and satisfies the requirements of 15A NCAC 2H .0908(b) and the Comprehensive Guidance for North Carolina Pretreatment Programs. Central Files James Warren, Town of Clayton Dana Folley, Pretreatment Unit Christopher Wu, RRO Christopher Wu Environmental Specialist Raleigh, NC 27699-1617 Raleigh, NC 27604 Phone (919) 733-5083 FAX (919)733-0059 Alan W. Klimek, P.E. Director Division of Water Quality NC DWQ/PERCS Unit 1617 Mail Service Center Internet: h2o.enr.state.nc.us/Pretreat/index.html 512 N. Salisbury St. Subject: Pretreatment Annual Report Review Town of Clayton Johnston County NPDES Number: NC0025453 NorthCarolina -------------Naturally Customer Service 1-877-623-6748 Thank you for your continued cooperation with the Pretreatment Program. If you have any questions or comments, please contact Dana Folley at (919) 733-5083 ext. 523 [email: dana.folley@ncmail.net]. William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources oU£^ I JI III SL> — // 09/I > || Michael F. Easley, Governor Division of Water Qualify February 17, 2005 Subject: Dear Mayor McLeod: i 1617 Mail Service Center 512 N. Salisbury St. An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper The Honorable Jody L. McLeod, Mayor Town of Clayton Post Office Box 879 Clayton, North Carolina 27520-0879 A letter of request for Authorization to Construct was received on December 29, 2003, by the Division, and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization for the construction of modifications to the existing 1.9 MOD Wastewater Treatment Plant, with discharge of treated wastewater into the Neuse River in the Neuse River Basin was issued on October 4, 2004. We are re-issuing this Authorization to Construct to correct the A to C number from 02543A01 to 025453 A03. No conditions of this Authorization to Construct are changed from previously issued Authorization to Construct except the A to C Number. This A to C thus voids A to C No. 02543A01 issued on October 4, 2004. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0025453 issued March 11, 2004, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0025453. Phone (9191 733-7015 FAX (919) 733-2496 North Carolina Division of Water Quality Internet: h2o.enr.state.nc.us Raleigh, NC 27699-1617 Raleigh, NC 27604 Authorization to Construct A to C No. 025453A03 Town of Clayton Little Creek WWTP Johnston County Project No. CS370431-04 William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W*. Klimek, P.E. Director NqrthCarolina ____ Naturally Customer Sen ice 1-877-623-6748 CD This authorization results in an increase in design and permitted capacity to 2.5 MGD. and is awarded for the construction of the following specific modifications: ___________-y z.. er j; , : < A new 214,500 gallon anaerobic basip; one new 300,000 gallon anoxic tank, one new 200,000 gallon anoxic tank; modifications to the existing aeration basins; a -new 360,000 gallon sludge holding/digestion tank with two blowers each having 1100 SCFM of aeration capacity, and two 10 HP submersible mixers, instrumentation, site work, piping, electrical work, and associated appurtenances, pursuant to the letter of request received on December 29, 2003, and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. > o The Honorable Jody L. McLeod, Mayor February 17, 2005 Page 2 The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Raleigh Regional Office, telephone number (919) 571-4700, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, 111 and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T1 5A:8G.02()2. During the constmction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility . You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and. when applicable, the North Carolina Dam Safety Act. hi addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to Cecil G. Madden, Jr., P.E., Construction Grants & Loans, DWQ / DENR, 1633 Mail Service Center, Raleigh, NC 27699- 1633. Sincerely, Alan W. Klimek, P.E. ICD.cgm cc: j The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. The Honorable Jody L. McLeod, Mayor February 17, 2005 Page 3 Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. If you have any questions or need additional information, please contact Cecil G. Madden, Jr., P.E. at telephone number (919) 715-6203. The Wooten Company, Shankar R. Mistry, Ph.D., P.E. Johnston County Health Department Raleigh Regional Office, Surface Water Protection Technical Assistance and Certification Unit Daniel Blaisdell. P.E. Point Source Branch. NPDES Program Cecil G. Madden, Jr., P.E. Ishwar Dcvkota, P.E. Project No. CS370431-04 t May 18, 2005 Dear Mr. Biggs: The speculative limits presented here Environmental Assessments of New Projects An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Mr. Steven Biggs, Manager Town of Clayton P.O. Box 879 Clayton, North Carolina 27520 1617 Mail Service Center 512 N. Salisbury St. William G. Ross, Jr., Secretary Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality Phone (919)733-5083 FAX (919)733-0719 Michael F. Easley, Governor State of North Carolina North Carolina Division of Water Quality Internet: h2o.enr.state.nc.us Raleigh, NC 27699-1617 Raleigh. NC 27604 Ikhnr b_aleigh regional Subject: Speculative Effluent Limits Request Town of Clayton NPDES Permit NC0025453 Johnston County lTDUJGt!' This letter is in response to your request for speculative effluent limits for the proposed expansions of Clayton’s wastewater treatment plant from 2.5 MGD to 8.0 MOD. We have reviewed the request and provide the following response. NorthCarolinaNaturally Customer Service 1-877-623-6748 ==4 An Environmental Assessment should contain a clear justification for the proposed project. It should provide an analysis of potential alternatives, including a thorough evaluation of non-discharge alternatives and connection to a regional treatment system. Nondischarge alternatives or alternatives to expansion, such as spray irrigation, water conservation, or inflow and infiltration reduction, are considered to be environmentally preferable to a surface water discharge. In accordance with the North Carolina General Statutes, the preferred alternative must be the practicable waste treatment and disposal alternative with the least adverse impact on the environment. If the EA demonstrates that the project may result in a significant adverse effect on the quality of the environment, you must then prepare an Environmental Impact Statement. Please be aware that you will have to evaluate this project for environmental impacts before receiving a modified permit. Anyone proposing to construct new or expanded waste treatment facilities using public funds or public (state) lands must first prepare an environmental assessment (EA) when wastewater flows (1) equal or exceed 0.5 MGD or (2) exceed one-third of the 7Q10 flow of the receiving stream. DWQ will not accept a permit application for a project requiring an environmental assessment until the Division has approved the EA and sent a Finding of No Significant Impact (FONSI) to the state Clearinghouse for review and comment. are based on our understanding of the proposal and of present environmental conditions. The Division of Water Quality (DWQ) cannot guarantee that it will issue the Town an NPDES permit to discharge treated wastewater into waters of the State. Nor can we guarantee that the effluent limitations and other requirements included in any permit will be exactly as presented here. Final decisions on these matters will be made only after the Division receives and evaluates a formal permit application for the Town’s proposed discharge. Speculative Effluent Limits SPECULATIVE LIMITS PARAMETER Monthly Average Weekly Average Daily Maximum 8.0 5.0 mg/L 7.5 mg/L 10.0 mg/L 15.0 mg/L 30.0 mg/L 45.0 mg/L 1.0 mg/L 3.0 mg/L 2.0 mg/L 6.0 mg/L 200/100 ml 400/100 ml 28 ng/L 21,400 (pounds/year) 2.0 mg/L BOPs - The limits for BOD are water quality based limits to protect the receiving stream. NH3-N - The limits for NH3-N are water quality based limits to protect the receiving stream. TSS - The limits for total suspended solids are standard for secondary treatment of municipal wastewater. P.O. - The D.O. limit is a water quality based limit to protect the receiving stream. Ms. Donald B. Rains Town of Princeton Page 2 Fecal Coliform, pH - The limits for fecal coliform bacteria and pH are derived to protect water quality in the receiving stream. Based on the available information, tentative limits for the Princeton WWTP at the expanded flow of 8.0 MGD are as follows: Total Residual Chlorine (TRC) - Facilities that use chlorine disinfection receive a total chlorine limit to protect against chlorine toxicity in the receiving stream. Minimum 6.0 mg/L >6.0 and <9.0 standard units Flow (MGD)__________ BOD, 5-day, 20°C (April 1 - October 31) BOD, 5-day, 20°C (November 1 - March 31) Total Suspended Solids NH3 asN (April 1 - October 31) NH3 asN (November 1 - March 31) Dissolved Oxygen______ PH_________________ Fecal Coliform (geometric mean)______ Total Residual Chlorine TN Load____________ Total Phosphorus Total Nitrogen - The nitrogen limit represents the Town’s annual allocation for total nitrogen, as defined in the proposed Neuse River Basin Strategy (T15A NCAC 2B.0234). The Strategy also gives dischargers in the basin the option of forming a group compliance association and working collectively to meet the overall nitrogen reduction target. The rule waives the individual nitrogen permit limits for any discharger that joins an approved association. The association then becomes responsible for meeting the collective allocation of its members. The Town’s allocation represents a nitrogen “cap” and does not increase with increasing flows. At the 1.9 MGD flow previously permitted, the 21,400 Ib/yr allocation was equivalent to an average concentration of 3.7 mg/L TN. The equivalent concentration will decrease to 0.87 mg/L at 8.0 MGD. The Division considers 3 mg/L as the Sincerely, cc: Ms. Donald B. Rains Town of Princeton Page 3 minimum technologically and economically feasible achievable treatment level. Considering that a limit of 0.87 mg/L is not feasible to achieve, the Town must evaluate other options such as pursuing water reuse or other non­ discharge options in order to reduce the amount of nitrogen discharged to the receiving stream. Furthermore, to increase its nitrogen allocation, the Town can purchase the allocation from existing dischargers or can purchase the allocation from the Wetlands Restoration Fund, which uses the payment to fund offsetting non-point nutrient reductions. Payments for the purchase of allocation are set at $22/lb and must be paid for a 30-year period prior to application for an NPDES permit modification. The limits presented above were based on the information presented in the speculative limits request. A complete evaluation of these limits and monitoring frequencies in addition to monitoring requirements for metals and other toxicants will be addressed upon receipt of a formal NPDES permit application. I trust this response offers sufficient guidance for the Town’s proposed treatment plant expansion. If you have any additional questions about these limits, feel free to contact Teresa Rodriguez at (919) 733-5083 ext. 553. Mark McIntire EAST NPDES Unit Supervisor Total Phosphorus - In the Neuse River Basin, facilities permitted at or above 0.5 MOD receive a TP limit. For facilities that are not members of the compliance association the corresponding limit is 1.0 mg/L as a monthly average. For compliance association members the limit is 2.0 mg/L as a quarterly average. Central Files Raleigh Regional Office # Construction Grants and Loans Section NPDES Unit Shankar R. Mistry, Ph.D., P.E. - The Wooten Company 120 North Boylan Avenue Raleigh, North Carolina 27603-1423 04/22/2005 09: 35 TOWNOFCLA PAGE 01 -'ENVIRONMENT’ FAX TRANSMITTAL SHEET mtcAATTN: FAX NO.: TOTAL NUMBER OF PAGES (INCLUDING COVER) : THANK YOU, WATER RECLAMATION (919)553-1535 PUBLIC WORKS (919)553-1530 TOWN OF CLAYTON OPERATIONS CENTER COMPANY: Owe FROM: ^33-97/^ ELECTRIC SERVICE ft ' (9)9) 553*4530 VEHICLE MAINTENANCE (919)553.1530 COMMENTS: Should you have any problems receiving this FAX, please call the Water Reclamation Facility at (919)553-1536, or our FAX number is (919) 553-1918. 653 Highway 42 Wc.$t • PO. Box 879 • Clayton. North Carolina 27520 • (919) 553-153(7’ Fax (919) 553-1541 91 -’ENVIRONMENT’"SERVICE" April 22,2005 Re: Effluent Pump Station Problem, Town of Clayton NPDES # NC 00025453 Dear Mr. Hayes: Please call me directly at 919-553-1536 if you have any questions. :rel 653 Highway 42 West • P.O. Box 879 • Clayton. Nonh Carolina 27520 • (919) 553-1530 • Fax (919) 553-1541 VEHICLE MAINTENANCE (919)553-1530 ELECTRIC SERVICE (919)553-1530 James Warren, ORC, Town of Clayton Steve Biggs Tim Simpson As reported to you on April 18, 2005, plant staff was notified of a high water alarm at our effluent pump station. An automobile accident had occurred near the plant site and as result the plant experienced transient power surges. As a result of these transient or short terms power surges the variable frequency drives tripped out and had to be reset. The backup pump had a problem with the float system this was repaired later in the am. The disinfected effluent was over running the pump station when the operator arrived. Power was restored to the controls and the pump station returned to normal operation. The time between the call out and response was less than thirty minutes and normal operation was noted within 45 minutes. The estimated volume for 45 minutes at 833 gpm would be 37,485 gls.. The effluent sheet flowed into the woods behind pump station and did not pose a threat to the environment. WATER RECLAMATION (919) 553-1535 Mitch Hayes DWQ, R^eigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 PUBLIC WORKS (919)553-1530 TOWNQFCLA^^N TOWN OF CLAYTO OPERATIONS CENTER 04/22/2005 09:35 PAGE 02 May 18, 2005 Dear Mr. Biggs: Environmental Assessments of New Projects An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Mr. Steven Biggs, Manager Town of Clayton P.O. Box 879 Clayton, North Carolina 27520 This letter is in response to your request for speculative effluent limits for the proposed expansions of Clayton’s wastewater treatment plant from 2.5 MOD to 8.0 MGD. We have reviewed the request and provide the following response. North Carolina Division of Water Quality Internet: h2o.enr.state.nc.us 1617 Mail Service Center 512 N. Salisbury St. Phone(919)733-5083 FAX (919) 733-0719 Michael F. Easley, Governor State of North Carolina Raleigh, NC 27699-1617 Raleigh. NC 27604 ..OneNorthCarohnaNaturally Customer Service 1-877-623-6748 3 Irf__J 1 REGIONAL Of M; Subject: Speculative Effluent Limits Request Town of Clayton NPDES Permit NC0025453 Johnston County The speculative limits presented here are based on our understanding of the proposal and of present environmental conditions. The Division of Water Quality (DWQ) cannot guarantee that it will issue the Town an NPDES permit to discharge treated wastewater into waters of the State. Nor can we guarantee that the effluent limitations and other requirements included in any permit will be exactly as presented here. Final decisions on these matters will be made only after the Division receives and evaluates a formal permit application for the Town’s proposed discharge. William G. Ross, Jr., Secretary Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality ■» An Environmental Assessment should contain a clear justification for the proposed project. It should provide an analysis of potential alternatives, including a thorough evaluation of non-discharge alternatives and connection to a regional treatment system. Nondischarge alternatives or alternatives to expansion, such as spray irrigation, water conservation, or inflow and infiltration reduction, are considered to be environmentally preferable to a surface water discharge. In accordance with the North Carolina General Statutes, the preferred alternative must be the practicable waste treatment and disposal alternative with the least adverse impact on the environment. If the EA demonstrates that the project may result in a significant adverse effect on the quality of the environment, you must then prepare an Environmental Impact Statement. Please be aware that you will have to evaluate this project for environmental impacts before receiving a modified permit. Anyone proposing to construct new or expanded waste treatment facilities using public funds or public (state) lands must first prepare an environmental assessment (EA) when wastewater flows (1) equal or exceed 0.5 MGD or (2) exceed one-third of the 7Q10 flow of the receiving stream. DWQ will not accept a permit application for a project requiring an environmental assessment until the Division has approved the EA and sent a Finding of No Significant Impact (FONSI) to the state Clearinghouse for review and comment. .oVC,, N, Co /ill I Speculative Effluent Limits SPECULATIVE LIMITS Daily MaximumWeekly AverageMonthly AveragePARAMETER 8.0 7.5 mg/L5.0 mg/L 15.0 mg/L10.0 mg/L 45.0 mg/L30.0 mg/L 3.0 mg/L1.0 mg/L 6.0 mg/L2.0 mg/L 400/100 ml200/100 ml 28 gg/L 21,400 (pounds/year) 2.0 mg/L BOPs - The limits for BOD are water quality based limits to protect the receiving stream. NfL-N - The limits for NH3-N are water quality based limits to protect the receiving stream. TSS - The limits for total suspended solids are standard for secondary treatment of municipal wastewater. P.O, - The P.O. limit is a water quality based limit to protect the receiving stream. Minimum 6.0 mg/L >6.0 and <9.0 standard units Ms. Donald B. Rains Town of Princeton Page 2 Based on the available information, tentative limits for the Princeton WWTP at the expanded flow of 8.0 MGD are as follows: Fecal Coliform. pH - The limits for fecal coliform bacteria and pH are derived to protect water quality in the receiving stream. Total Nitrogen - The nitrogen limit represents the Town’s annual allocation for total nitrogen, as defined in the proposed Neuse River Basin Strategy (T15A NCAC 2B.0234). The Strategy also gives dischargers in the basin the option of forming a group compliance association and working collectively to meet the overall nitrogen reduction target. The rule waives the individual nitrogen permit limits for any discharger that joins an approved association. The association then becomes responsible for meeting the collective allocation of its members. The Town’s allocation represents a nitrogen “cap” and does not increase with increasing flows. At the 1.9 MGD flow previously permitted, the 21,400 Ib/yr allocation was equivalent to an average concentration of 3.7 mg/L TN. The equivalent concentration will decrease to 0.87 mg/L at 8.0 MGD. The Division considers 3 mg/L as the Total Residual Chlorine (TRC) - Facilities that use chlorine disinfection receive a total chlorine limit to protect against chlorine toxicity in the receiving stream. Flow (MGD)__________ BOD, 5-day, 20°C (April 1 - October 31) BOD, 5-day, 20°C (November 1 - March 31) Total Suspended Solids NH3 asN (April 1 - October 31) NH3 asN (November 1 - March 31) Dissolved Oxygen_____ PH_________________ Fecal Coliform (geometric mean)______ Total Residual Chlorine TN Load Total Phosphorus cc: Ms. Donald B. Rains Town of Princeton Page 3 The limits presented above were based on the information presented in the speculative limits request. A complete evaluation of these limits and monitoring frequencies in addition to monitoring requirements for metals and other toxicants will be addressed upon receipt of a formal NPDES permit application. I trust this response offers sufficient guidance for the Town’s proposed treatment plant expansion. If you have any additional questions about these limits, feel free to contact Teresa Rodriguez at (919) 733-5083 ext. 553. Mark McIntire EAST NPDES Unit Supervisor Total Phosphorus - In the Neuse River Basin, facilities permitted at or above 0.5 MOD receive a TP limit. For facilities that are not members of the compliance association the corresponding limit is 1.0 mg/L as a monthly average. For compliance association members the limit is 2.0 mg/L as a quarterly average. Central Files Raleigh Regional Office Construction Grants and Lcians Section NPDES Unit Shankar R. Mistry, Ph.D., P.E. - The Wooten Company 120 North Boylan Avenue Raleigh, North Carolina 27603-1423 minimum technologically and economically feasible achievable treatment level. Considering that a limit of 0.87 mg/L is not feasible to achieve, the Town must evaluate other options such as pursuing water reuse or other non­ discharge options in order to reduce the amount of nitrogen discharged to the receiving stream. Furthermore, to increase its nitrogen allocation, the Town can purchase the allocation from existing dischargers or can purchase the allocation from the Wetlands Restoration Fund, which uses the payment to fund offsetting non-pomt nutrient reductions. Payments for the purchase of allocation are set at $22/lb and must be paid for a 30-year period prior to application for an NPDES permit modification. Sincen August 8, 2005 SUBJECT: Dear Mr. Biggs: An Eaual Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper n n f r I am writing to confirm the status of our review of the subject Engineering Report that was received on May 13, 2005. A preliminary review of the report determined that the town’s discharge, after the proposed plant upgrade and expansion, could not comply with its current allocation and permit limit of 21,400 Ib/year for total nitrogen at the 8.0 mgd design flow. The report concludes “The Town needs to make an official request to NCDWQ for either increase in Total Nitrogen discharge allocation or provide BAT limit for Total Nitrogen.” The report further recommends that the town “Maintain the membership of the Lower Neuse Basin Association... The town will be responsible for group compliance limits. The town will not get a notice of violation from the N.C. Division of Water Quality for non-compliance with its individual total nitrogen discharge limit.” During our June 2, 2005 meeting with you and your engineers, we discussed the need for additional information regarding this recommendation before beginning our formal review of the Engineering Report. Mr. R. Steven Biggs, Town Manager Town of Clayton Post Office Box 879 Clayton, North Carolina 27520 Accordingly, the Division met with the Executive Committee of the Neuse River Compliance Association on June 23, 2005 to discuss nitrogen allocation accounting issues. In the meeting, it was agreed to consider an approach by which any member of the Association could pursue a plant expansion without having to first acquire the traditional allocation it will Construction Grants and Loans Section 1633 Mail Service Center Raleigh NC 27699-1633 Phone: 919-733-6900 / FAX: 919-715-6229 / Internet: www.nccgl.net Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, I’.E. Director Division of Water Quality We have since discussed your specific requests and also, generically, nitrogen allocation issues. Changes in nitrogen allocations or limits must conform to the provisions of the Neuse River Basin Nutrient Management Strategy rule (T15A NCAC 2B.0234) and be consistent with the Neuse River Estuary TMDL approved by the United States Environmental Protection Agency. As a result, the Division does not have the authority to increase the town’s allocation or limit by either of the approaches suggested in the Engineering Report. Although the town is a member of the Neuse River Compliance Association, it must demonstrate to the Division’s satisfaction that 1) it can and will meet its TN limit for the life of the project, or that 2) it can acquire the additional allocation necessary for compliance, before the Division can approve the proposed expansion. ij. AUG I I 2 i ,.___t ■ :D7hNR RALEIGH REGION*! OFFICE • Town of Clayton Engineering Report for Wastewater Treatment System Capacity Study and Improvements Project No. CS370431-05 DUJQ. O * X- NorthCarolinaNaturally DMB/dr cc: Sincerely, / eventually need. This approach would require a joint effort by the member and the Neuse River Compliance Association to develop and submit a Nutrient Management Plan as part of its project proposal. In Clayton’s case the plan would detail the strategy for complying with the town’s nitrogen discharge limit for the life of the project. For example, the town and the Compliance Association could propose that in the first 5 to 10 years, Clayton will rely on unused allocation available from the Association; and that by year “x”, other specific steps will be taken to meet the town’s long-term needs, such as constructing a reuse system to reduce the nitrogen discharge, or purchasing allocation from another discharger or from the Ecosystems Enhancement Program. In order to be approved, the Nutrient Management Plan would have to provide sufficient detail to demonstrate that the facility will comply with its nitrogen limits through each phase of the strategy, up to and including the proposed design capacity of the plant expansion. The Plan must include a clear timeline for wastewater treatment improvements, construction of a reuse system, and/or the acquisition of additional nitrogen allocation needed during the life of the project, and a detailed plan for financing those efforts. Wherever the Plan relies on the Compliance Association, another discharger, or other entity, it must document the commitment of each such entity. Mr. R. Steven Biggs, Town Manager Page 2 August 8, 2005 In summary, before the Division can begin its review of the Engineering Report, modify Clayton’s individual NPDES permit, or issue an Authorization to Construct for a project that will not meet its current nitrogen limit, the town and the Neuse River Compliance Association must provide an approvable Nutrient Management Plan. Upon the Division’s approval, the Nutrient Management Plan will become an enforceable part of the town’s NPDES pennit. Neuse River Compliance Association - Cindy Finan, Executive Director Neuse River Compliance Associate - Haywood Phthisic, President Division of Water Quality - Alan Klimek, P.E., Director Division of Water Quality - Colleen Sullins, Deputy Director Mike Templeton, P.E. DWQ Raleigh Regional Office The Wooten Company - Shankar Mistry, P.E. Bobby Blowe, P.E. Daniel Blaisdell. P.E. Amy Simes, P.E. Rob Brown DMU/FEU/SRF 1K. Lawrence Horton, III, P.E., Supervisor Facilities Evaluation Unit If you have any questions regarding this matter, please contact me at (919) 715-6225 or Mr. Daniel M. Blaisdell, P.E. at (919) 715-6211. August 22, 2005 Subject: Dear Mr. Biggs: Date Limit Value Reported Value Limit Type 04/30/05 1 mg/1 1.02 mg/1 Nitrate + Nitrite Not Sampled Total Nitrogen Not Sampled Total Phosphorous Not Sampled NorthCarolinaNaturally Nitrogen, Ammonia Total (as N) The Division of Water Quality has reviewed Little Creek WWTP's monitoring report for April 2005 and we noted the following violation(s) had been reported: Parameter Raleigh Regional Office Surface Water Protection 03/27/05- 04/02/05 03/27/05- 04/02/05 03/27/05- 04/02/05 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality phone (919) 791-4200 facsimile (919) 571-4718 Weekly Monitoring Violation Weekly Monitoring Violation Monthly Average Exceeded NOTICE OF VIOLATION Permit No. NC0025453 Little Creek WWTP Case No. NOV-2005-LM-0008 Johnston County R Steven Biggs Town of Clayton PO Box 879 Clayton NC 27520 1628 Mail Service Center Raleigh, NC 27699-1628 Customer Service 1-877-623-6748 O II NCDEM Weekly Monitoring Violation A review of the April 2005 submitted DMR for this facility shows that the POTW status was marked as ‘Compliant’. Please submit an amended DMR for April 2005 with the POTW status marked as ‘Noncompliant’. Please provide an explanation for the sampling deficiencies for April 2005 as well. Please remember, every permit violation has a potential negative impact on the surface waters of our State. We urge you to immediately take any and all steps necessary to avoid future occurrences. By doing so, you will prevent further action by the State regarding the problems this month while protecting our lakes, rivers and streams. 0 7 u —£ Sincerely, xc:WQ Central Files Kenneth Schuster, P.E. Raleigh Regional Surface Water Quality Supervisor Town Of Clayton Little Creek WWTP ” Case No. NOV-2005-LM-0008 If you should have any questions regarding this notice, please contact Chad Cobum at 919-791- 4200 extension 4247, or by e-mail at chad.cobum@ncmail.net. EFFLUENT APRIL YEAR 2005DISCHARGE NO.NPDES PERMIT NO.NC0025453 MONTH COUNTY Johnston James Warren IV PHONE 919-553-1536 (2) Leigh Honeycutt, Jimmy CreechPERSON(S) COLLECTING SAMPLESCHECK BOX IF ORC HAS CHANCED Mail ORIGINAL and ONE COPY to: ATTN: CENTRAL FILES '^■1 DIV. OF ENVIRONMENTAL MANAGEMENT DEHNR P.O BOX 29535 RALEIGH. NC 27626-0535 50050 00010 00400 00310 00530 655 600 630 625 95 thp3b FLOW < < < 1.84 0.56 1.28 0.57 < < < < <1.33 0.57 0.76 1.42 << < <3.28 1.18 2.1 3.12 3.74 1.32 2.42 0.52< #### lbs 1.424 1.116 1.043 2 *Q O O X (SIGNAnjR£<5F OPERATOR IN RESPONSIBLE CHARGE) BY THtS^IGNITURE, I CERTIFY THAT THE REPORT IS ACCURATE AND COMPLETE TO THE BEST OF MY KNOWLEDGE £ n O o o o a Q s o CMO 2 >. i "o ■O o o £ o X o UJ Q S <n 5 1 ►- o S §. O 5 i t z -I o AVERAGE MAXIMUM MINIMUM Comp. (C) Grab (G) Monthly Limit Total Eff MG DEM Form MR-1 (12/93) 2.5 42.763 1.425 2.162 1.043 16.952 20 15 G 17 18 16__ 16 17 7.5 7 G 7.5 7.5 7.5 7.5 7.3 2 2.3 3.2 3.5 4.4 1.02 3.81 0 C 1 0.00 0.66 0.51 2.27 1.58 7 74 1 G 200/100 Total 8.1 8.4 9.4 8.1 8.1 691 1028 414 17 16 18 19 18 20 16 15 15 15 19 16 18 17 17 7.5 H 7.3 7.5 r 7.4 7.5 G 28 2.738 4.4 2 C 5 1.048 2 1__ C 30 1 1 1 1 1 10 15 8 16 1 1 5 2 10 15 4 2 16 8 1 7.8 8.9 7,8 7.6 8.6 7.4 9.9 8.9 9.5 MGA- 3.12 2.62 0.93 1.32 0.56 1004 * 1000 ~ 1019 " 1028 916 435 445 514 576 643 _1_ 2 4 _6_ 7 8 10 11 1Z ]I 11 11 11 1Z _18 .11 20 21_ .22" 23 24 26 J7 28 29 30 31 3.81 3.05 1.05 1.34 1.55 74 42 6 24 5 8,51 9.9 7.3 G 6 Nitrogen 2.56 3.74 1.33 C MGA 1.01 uS 437 1.75 3.12 0.52 C MG/L 1.61 ■c 16 MG/L 2 425 414 420 __ 441 458 HRS 8 6 8 8 8 8 8 8 8 2 8 8 8 8 8 4.5 7.5 8 ‘: 8 f 8 8 8 8 8 8 8 8 8 8 8 UNITS 7 #100ML 14 9.5 8.3 8.6 8.2 7.3 913.71__________________________ Fornn by WndowCh«m(707)8a4H»45J>/n11158?<5.0;1/i/B6 861 833 863 894 893 HRS 7:00 7:30 8:00 7:00 7:00 7:00 7:00 7:00 8:00 7:30 7:00 7:00 7;00 7:00 7:00 8:00 6:00 7:00 7:00 7:00 7:00 7:00 6:00 7:00 7:00 7:00 7:00 7:00 7:00 7:30 Y/N/B Y N N Y Y Y IIISYB Y N N Y Y Y Y Y N Y Y Y Y Y Y N N Y Y _______ Y 1.465 Y Y N 50060 —Z----f o X o < g s £ UG/L MG/L < 1 00300 I iI MG/L . To/ 7.2 7.2 7.2 7.4 7.5 7.1 7.1 7.2 7.1 7.2 3.9 2.7 3.7 3.8 3.9 MG/L, zz 00610 I I MG/L 1.08 001 CLASS IV GRADE Sui MGD 1.374 1.261 1.504 1.42 1.258 1.192 1.187 1.224 1.234 1.254 1.272 1.134 1.488 1.786 2.009 1.495 2.162 1.477 1.485 1.598 1.442 1.531 1.352 1.541 1.533 1.502 FACILITY NAME Little Creek Water Reclamation OPERATOR IN RESPONSIBLE CHARGE (ORC) CERTIFIED LABORATORIES (1) ________Tri-Test S Q SS V> Q 32 o 11 o 5 2 E a EFF INF a w ^2 £P s. o w d £ 2 1 < 1 < 1__ 1 1_ 1_ i< 1 < 1 < 1 | 31616 0.69 0.58 0.00 < 0.00 < 0.00 Bill Taylor, Charlie Harrell Tl'i'IoS------ Ite 2 2 -J 2 < __ 2_ < 2 < __1_ < __1_ < 1 1 2.15 0.54 < 0.00 < 0.00 0.55 < ___2 < 2 < ___2_ ___X9 2.2 All monitoring data and sampling frequencies meet permit requirements /11oS Forms by WindowChem(707)864-0B45;p/n11158:v5.0;1/1/96 01207 Cadmium ___________3/31/2008 Permit Exp. Date I I Compliant If the facility is noncompliant, please comment on corrective actions being taken in respect to equipment, operation, maintenance, etc., and a time table for improvements to be made. 71880 Formaldehyde 71900 Mercury 81551 Xylene 00010 Temperature 00076 Turbidity 00080 Color (Pt-Co) 00082 Color(ADMII) 00665 Total Phosphorous 00720 Cyanide 00745 Total Sulfide 00927 Total Magnesium 00929 Total Sodium 00940 Total Chloride 00556 Oil & Grease 00600 Total Nitrogen 00610 Ammonia Nitrogen 00625 Total Kjeldhal Nitrogen 00630 Nitrates/Nitrites 01045 Iron 01051 Lead 01147 Total Selenium 31616 Fecal Coliform 32730 Total Phenolies 34235 Benzene 34481 Toluene 38260 MBAS 39516 PCBs 50050 Flow 01067 Nickel 01077 Silver 01092 Zinc 01105 Aluminum 50060 Total Residual Chlorine 01307 Total Cobalt 01042 Copper 00095 Conductivity 00300 Dissolved Oxygen 03100 BOD5 00340 COD 00400 pH 00530 Total Suspended Residue 00545 Settleable Matter 919-553-5002 Phone Number Steve Biggs_________________ Permittee (Please print or type) PO Box 879, Clayton NC 27520 Permittee Address The facility exceeded the monthly ammonia limit of 1.0 mg/l, the reported limit was 1.02 mg/l. __________________ The limit excursion was attributed to seasonal turnover. The BNR project underway should improve the performance of the facility._______________ ___________________ _______ BOD QC did not meet reporting criteria 4/06/05._______________________________________________________ This sheet was amended to reflect lab error on ammonia reporting, and missing phosphorus and nitrogen data. ^1'01-0^- Date "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 01032 Hexavalent Chromium 01034 Chromium PARAMETER CODES 00951 Total Flouride 01002 Total Arsenic Signiture of Permittee** Copyright© 1992-1996, WindowChem SoftwareAll rights reserved http://www.windowchem com Facility Stai!^(PraKe check one of the following) * ORC mmust visit facility and document visitation of faciclity as required per 15 A NCAC 8A .0202 (b) (5) (B) ** If signed by other than the permittee, delegaation of signatory authority must e on file with the state per 15A NCAC 2B 0506 (b) (2) (D) Parameter Code assistance may be obtained by calling the Waer Quality Compliance Group at (919) 733-5083, extension 581 or 534 The monthly average for fecal colifrrom is to be reprted as a GEOMETRIC mean. Use only units designated in the reportin facility's permit for reprtin data. All monitoring data and sampling frequencies do NOT meet permit requirements |x | Noncompliant “SERVICE” September 1, 2005 Re: Monthly DMR Report Forms: NPDES# 0025453 To Whom It May Concern: Please contact me directly at 919-553-1536 if you have any questions. 653 Highway 42 West • P.O. Box 879 • Clayton, North Carolina 27520 • (919) 553-1530 • Fax (919) 553-1541 TOWN OF CLAYTON OPERATIONS CENTER VEHICLE MAINTENANCE (919)553-1530 ELECTRIC SERVICE (919)553-1530 WATER RECLAMATION (919) 553-1535 PUBLIC WORKS (919) 553-1530 NC Division of Water Quality 1617 Mail Service Center Attn. Information Processing Unit Raleigh, NC 27699 Sincerely, dames Warren, ORC, Town Of Clayton, NC “’’ENVIRONMENT” Enclosed please find an amended DMR for April 2005. Due to a calculation error the monthly value for ammonia has changed, and the data for phosphorus, total nitrogen has been added for April 1st. Also included is an amended facility status form. Page 1 of 1 Laboratory Report Work Order#:0504-00007 CL1535 ! QualifierMethodResultsTest Performed Reviewed by: No. 001 Total Kjeldahl Nitrogen Nitrate-Nitrite Total Nitrogen Calculation ERA 351.2 ERA 353.2 Time Sampled 9:00 1.61 mg/L 1.01 mg/L as N 2.62 mg/L Report Date: Date Received: Gust. Code: Gust. P.O.#: NC/WW Cert. #: 067 NC/DW Cert. #: 37731 Sample Type Composite 4/7/05 4/5/05 4/7/05 4/8/2005 4/1/2005 Condition 4 +/- 2 deg C Telephone: (919) 834-4984 Fax: (919) 834-6497 Sample ID EFFLUENT COMPOSITE Date Sampled 4/1/2005 3909 Beryl Road Raleigh, NC 27607 Matrix WW 10:46 6:29 10:46 — Prepared for — Ms. Leigh Honeycutt Clayton WWTP, Town of PO Box 879 Durham St. ext. Clayton, NC 27528 ------ for Tritest, Inc. I o o TCoTEST Analyzed Date Time Project No.: 01 Project ID: TOTAL NITROGEN STM 4500-P 18th ed. j j (pt 3 j~3 sumx2-(sumx)2/#stds. 2.0066671.1822.6 XY 0.478 0 50Blank PHOSLIN.XLS Dup. Dup. T-Phosphorus Town of Clayton, NC Using 100 ml volumetric flasks: (1 ml of the Standard solution in 50 mis DI water. Bring to volume.) .1 ml Std = 1 ml of 10 ml Stock in 50 mis of DI water, bring to volume. .5 ml Std= 5 mis of the 10 ml stock in 50 mis of DI water, bring to volume. 1.0 ml Std: 10 mis of thelOml stock in 50 mis of DI water, bring to volume. 2.0 ml Std; 20 m|s of the 10ml stock in 50 mis of DI water, bring to volume. Second Source Standard (SSC) Make up a 10 ml stock solution from the Second Source; Using 100 ml volumetric flasks: (1 ml of the Second Source solution in 50 mis DI water, bring to volume.) 1.0 mlStd= 10 mis of the SSC in 50 mis DI water, bring to volume. Date: Time: Analyst: 0.1 0.5 2 0.8666667 0.394 %R ReRun if -102.862 <90 % Primary Source Std.: Assurance Phosphorus Lot #9-1 SOP Second Source Std.: HACH Lot# A 1302 Corelation Coefficient > .995 0.999952 0.5849 0.0173 0.142 1.45 0 ____0 1.6093| 4/22/05 1:00 Leigh Honeycutt 0.475 0.723 0.716 0.654 0.255 0.721 0.203 0.438 0.436 Absorbence Y square 0.029929 0.080656 0.525625 0 ______0 0.63621 50 25 25 50 50 25 50 5 5 50 5 1.04 3.13 3,10 1.42 0.57 3.12 0.46 9.60 9.56 #DIV/0! 1.04 #VALUE! #VALUE! #VALUE! 0.03 1 mg/l Eff 4/22 Eff 4/22 Eff 4/15 Eff 4/8 Eff 4/1 Eff 3/24 Inf 4/22 Inf 4/1 Inf SSC1.0 factor STTJ ______1 _______2 _______2 _______1_ _______1_ _______2 _______1_ ______10 ______10 #DIV/0! _______1_ ______10 #VALUE! #VALUE! 1 Standards: Make up a 10ml stock solution from the Primary Source; 50 ml. Sample: Concentration X X square 0.01 0.25 4 0 0 4.26 0.725 RPD ReRun if 4.70 <10 % 0.471049 -0.014242 “SERVICE” September 1, 2005 2005 Re: NOV, Permit # NC0025453, Little Creek WRF, Case # NOV-2005-LM-0008 Dear Mr. Schuster: An amended DMR has been submitted for April 2005. Please contact me directly at 919-553-1536 if you have any questions. Sincerely, 653 Highway 42 West • P.O. Box 879 • Clayton, North Carolina 27520* (919) 553-1530 • Fax (919) 553-1541 VEHICLE MAINTENANCE (919) 553-1530 ELECTRIC SERVICE (919)553-1530 Copy: Steve Biggs Tim Simpson The reporting violations for missing data was also attributed to a laboratory transcription error, the tests were ran but not recorded. Copies of the data are attached. The facility is taking measures to ensure such mistakes are corrected. James Warren. ORC Little Creek Water Reclamation Facility, Town Of Clayton, NC The ammonia monthly limit of 1.0 mg/1 was exceeded; the DMR submitted should have recorded the value of 1.02 mg/1. The lab analyst left one of the values out of the calculation by accident. The higher ammonia values for the month could be attributed to seasonal turnover of the microbes in the facility. The BNR process upgrade the town has started should enable the system to treat the waste more efficiently. PUBLIC WORKS (919) 553-1530 "ftwN OF CLAYTOR OPERATIONS CENTER WATER RECLAMATION (919) 553-1535 Kenneth Schuster P.E. Raleigh Regional Surface Water Quality Supervisor DWQ Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 This letter serves as a response to the Notice of Violation issued to the Town Of Clayton, NC on August 22, 2005. “’’ENVIRONMENT’ Michael F. Easley, Governor Date: October 24, 2005 Subject: Notice of Incomplete Discharge Monitoring Report - NC0025453 Dear Permittee: Sincerely, cc: An Equal Opportunity/Affirmative Action Employer Future DMR submittals with the same or similar problems will be unacceptable. If you have any questions about the proper completion of DMRs, please contact Michele Phillips at 919-733-5083 Ext. 534. Thank you for your assistance in this matter. Incomplete or illegible DMRs affect our staffs ability to provide a timely and effective evaluation of DMR submittals. Please be aware that until the Division receives a corrected DMR, you may be considered noncompliant with your NPDES permit and 15A NCAC 02B .0506, and you may be subject to further enforcement action. Please take the necessary steps to correct the problems and submit two copies of the amended DMR within fifteen (15) days of the date of this letter to the following address: Raleigh Regional Office Central Files 1617 Mail Service Center 512 N. Salisbury St. Attention: Michele Phillips Division of Water Quality Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 William G. Ross Jr., Secretary Nonh Carolina Department of Environment and Natural Resources Phone: (919)733-7015 Fax: (919)733-0719 Alan W. Klimek, P. E. Director Division of Water Quality N. C. Division of Water Quality Internet: http://h2o.enr.state.nc.us R Steven Biggs Post Office Box 879 Clayton, NC 27520 Raleigh. North Carolina 27699-1617 Raleigh, NC 27604 k. ^/^Alan W. Klimek, P.E. The purpose of this letter is to call your attention to problems with the recent submittal of the Discharge Monitoring Report (DMR) from your facility. As you may know, the data recorded on your DMR is keyed into the Division’s database. Our data entry staff has informed me of problems with your recent DMR submittal. Until these problems have been corrected, your DMR will be considered incomplete. Please see the attached form along with a copy of the problem DMR for details regarding the DMR’s deficiency. D C- NorthCarolina____ Naturally Customer Service 1-877-623-6748 ^/Til I > (L/UUk-^ Notice of Incomplete Discharge Monitoring Report O The written values are illegible. I | The Average, Maximum, and/or the Minimum data points have been omitted. Q The Units of Measure have been omitted or are incorrect Permit Number Facility: __J County. DMR Month and Year ^ohnSrfcrY______ ______— The Division of Water Quality deems the aforementioned DMR as incomplete due to the followdng reason(s): (Please see the highlighted areas on the attached DMR for details.) Q The DMR Parameter Codes have been omitted. Other Ok e. fa p hz?spWu-% Mi lrvztp(fgcfr. lo^ &Ote & b t MW* Permit: NC0025453 Inspection Date: 10/14/2005 Yes No NA NE ■ Yes No NA NE Yes No NA NE Yes No NA NE Yes No NA NE Yes No NA NESolids Handling Equipment Is storage adequate? Is the equipment operational? Is the chemical feed equipment operational? Owner - Facility: Little Creek VWVTP Inspection Type: Compliance Evaluation ■ ■ ■ ■ ■ ■ o ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ D ■ O ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ Influent Sampling Is composite sampling flow proportional Is sample collected above side streams? Is proper volume collected'? Is the tubing clean? Is proper temperature set for sample storage (kept at 1 0 to 4.4 degrees Celsius)? Is sampling performed according to the permit? Comment: Temperature was 1.5 degrees C. Effluent Sampling Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected'? Is the tubing clean? Is proper temperature set for sample storage (kept at 1 0 to 4 4 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)"? Comment: Temperature was 3 degrees C. Aerobic Digester Is the capacity adequate? Is the mixing adequate? Is the site free of excessive foaming in the tank? Is the odor acceptable? Is tankage available for properly waste sludge? Comment: Sludge was being lime stablized during inspection. Will be hauled week of October 9-15. Drying Beds Is there adequate drying bed space? Is the sludge distribution on drying beds appropriate? Are the drying beds free of vegetation? Is the site free of dry sludge remaining in beds? Is the site free of stockpiled sludge? Is the filtrate from sludge drying beds returned to the front of the plant? Is the sludge disposed of through county landfill? Is the sludge land applied? (Vacuum filters) Is polymer mixing adequate"? Comment: Drying beds are used as a back-up only. Sludge is lime stablized to Class B and hauled by Atlantic Coast Record Keeping Facility has copy of previous year's Annual Report on file for review? Comment: July 2004 through July 2005 DMR's checked for permit limit and monitoring violations. One monthly violation for Ammonia was noted for April 2005. This has already been addressed July 2005 DMR was checked for data entry, lab bench sheet, COC's. No discrepancies noted. Yes No NA NE Yes No NA NE Owner - Facility: Little Creek WWTP Inspection Type: Compliance Evaluation ■ ■ ■ ODD ■ D D D ■ D D D ■ D D D ■ D D D ■ D D D Is containment adequate? Is storage adequate? Are backup pumps available? Is the site free of excessive leaking? Comment: Alum is used for chemical phosphorus removal and polymer is used for enhanced clarification. Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris'? If effluent (diffuser pipes are required) are they operating properly"? Comment: Effluent discharge pipe was submerged in the river at the time of inspection. Effluent appeared clear and was mixing with the water with no foam or solids. Solids Handling Equipment Is the site free of high level of solids in filtrate from filter presses or vacuum filters? Is the site free of sludge buildup on belts and/or rollers of filter press'? Is the site free of excessive moisture in belt filter press sludge cake? The facility has an approved sludge management plan? Comment: Sludge press was not being operated at the time of inspection. Chemical Feed Yes No NA NE ■ D D D ■ D D D ■ D D D Permit: NC0025453 Inspection Date: 10/14/2005 Permit: NC0025453 I nspection Date: 10/14/2005 Nutrient Removal Yes No NA NE Yes No NA NE Down flow Yes No NA NE Yes No NA NE Are extra UV bulbs available on site? Are UV bulbs clean? Yes No NA NE (Sodium Hypochlorite) Is pump feed system operational? Is bulk storage tank containment area adequate? (free of leaks/open drains) Is the level of chlorine residual acceptable? Is the contact chamber free of growth, or sludge buildup"’ Is there chlorine residual prior to de-chlormation? Comment: Liquid chlorination is used only as a back-up. Contact chamber would need to be cleaned out if used Disinfection - UV Comment: One bank out of two is used. Both banks are used when flow is high. Pump Station - Effluent Is the pump wet well free of bypass lines or structures? Are all pumps present? Are all pumps operable? Are float controls operable? Are cylinders secured adequately? Are cylinders protected from direct sunlight? Is there adequate reserve supply of disinfectant? Are tablet chlorinators operational? Are the tablets the proper size and type? Number of tubes in use? Is SCADA telemetry available and operational’’ Is audible and visual alarm available and operational? Comment: Is UV intensity adequate? Is transmittance at or above designed level? Is there a backup system on site? Is effluent clear and free of solids? Owner - Facility: Little Creek WWTP Inspection Type: Compliance Evaluation ■ ■ o ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ Type Is chemical feed required to sustain process? Is nutrient removal process operating properly? Comment: Magnesium hydroxide and sodium hydroxide are used for pH control. Filtration (High Rate Tertiary) Type of operation: Is the filter media present? Is the filter surface free of clogging? Is the filter free of growth? Is the air scour operational? Is the scouring acceptable? Is the clear well free of excessive solids and filter media? Comment: Teritiry filters are covered. Effluent appeared clear in channel. Disinfection-Liquid ■ ■ ■ ■ ■ ■ Biological ■ ■ Permit: NC0025453 Inspection Date: 10/14/2005 Yes No NA NE Yes No NA NE Incubator (Fecal Coliform) set to 44 5 degrees Celsius+/- 0 2 degrees? Yes No NA NEFlow Measurement - Effluent Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? Yes No NA NERecord Keeping Dates of analysis Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Is a copy of the current NPDES permit available on site? Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site? Is there an emergency agreement with a fuel vendor for extended run on back-up power? Is the facility using a contract lab? Is proper temperature set for sample storage (kept at 1 0 to 4.4 degrees Celsius)? Incubator (BOD) set to 20.0 degrees Celsius +/-1 0 degrees? Comment: Fecal coliform water bath was 44.5, BOD incubator was 18 7, drying oven was at 103 degrees C. Tritest analyzes all N parameters, Pace Laboratories analyzes aquatic toxicity. (If units are separated) Does the chart recorder match the flow meter? Comment: Flow meter was calibrated 06/23/2005 Are records kept and maintained as required by the permit? Is all required inform,ation readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain-of-custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Name of person performing analyses Transported COCs Owner - Facility: Little Creek VWVTP Inspection Type: Compliance Evaluation ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ 0 ■ ■ Standby Power Is automatically activated standby power available? Is the generator tested by interrupting primary power source? Is the generator tested under load? Is the generator fuel level monitored^ Comment: Generator is load tested weekly. Laboratory Are field parameters performed by certified personnel or laboratory? Are all other parameters!excluding field parameters) performed by a certified lab? Permit Yes No NA NE Yes No NA NE Comment: Bar Screens Yes No NA NE b.Mechanical Yes No NA NE b.Mechanical Is the grit free of excessive organic matter? Is the grit free of excessive odor? Is disposal of grit in compliance? Type of bar screen a.Manual (If the present permit expires in 6 months or less) Has the permittee submitted a new application? Is the facility as described in the permit? Are there any special conditions for the permit? Is access to the plant site restricted to the general public"? Is the inspector granted access to all areas for inspection? Owner - Facility: Little Creek WWTP Inspection Type: Compliance Evaluation ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ o ■ Permit: NC0025453 Inspection Date: 10/14/2005 Are the bars adequately screening debris? Is the screen free of excessive debris? Is disposal of screening in compliance? Is the unit in good condition? Comment: Grit Removal Type of grit removal a Manual Yes No NA NE ■ ■ ■ ■ ■ ■ ■ O ■ ■ Comment: Permit describes units that are on site but are no longer in use. The units not in use consists on the orginal wastewater treatment plant. The treatment facility consists of a mechanically cleaned bar screen a manually cleaned bar screen, vortex type grit removal system, 9-inch Parshall flume for influent flow metering, influent wastewater pumping, extended aeration Carrousel type oxidation ditches, secondary clarifiers, sludge recirculation/waste pumping, magnesium hydroxide feed system for pH and alkalinity controls,'alum feed system for chemical phosphorus removal, polymer feed system for enhanced clarification, tertiary shallow bed traveling bridge filters, UV disinfection, chlorination/dechlonnation facilities (back-up only), effluent pumping to the Neuse River aerobic sludge digestion tank, polymer sludge conditioning and thickening by drum thickener, sludge storage tank sludge drying beds, and sludge loading station for sludge disposal by land application Operations & Maintenance Is the plant generally clean with acceptable housekeeping-? Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids pH DO Sludge Judge, and other that are applicable? Pump Station - Influent Is the pump wet well free of bypass lines or structures? Is the wet well free of excessive grease? Are all pumps present? Are all pumps operable? Are float controls operable? Is SCADA telemetry available and operational? Is audible and visual alarm available and operational? weeHo'test'tlfe^V0'1 V'SUal alarms were tested using mar"jal switch. ORC stated that floats are pulled once a Permit: NC0025453 Inspection Date: 10/14/2005 Yes No NA NEGrit Removal Yes No NA NE Is the clarifier free of black and odorous wastewater? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Yes No NA NEPumps-RAS-WAS Are pumps in place? Comment: Yes No NA NE'rickling Filter Is the distribution of flow even from the distribution arms'? Is the filter free of excessive filter files, worms or snails? Yes No NA NE Are the aerators operational? Are the aerators free of excessive solids build up? Is the foam the proper color for the treatment process? Does the foam cover less than 25% of the basin's surface? Is the DO level acceptable? Yes No NA NE Is total nitrogen removal required? Is total phosphorous removal required? Comment: Trickling filters are on site but are not being used. They will be dismantled at a later date. Oxidation Ditches Are settleometer results acceptable (> 30 minutes)? Is the DO level acceptable?(1.0 to 3.0 mg/l) Are settelometer results acceptable?(400 to 800 ml/l in 30 minutes) Comment: Foam covered approximatly 40% of the surface area. Nutrient Removal Is the site free of excessive buildup of solids in center well of circular clarifier"? Are weirs level? Is scum removal adequate? Is the site free of excessive floating sludge? Are pumps operational? Are there adequate spare parts and supplies on site? Is the filter free of uneven or discolored growth? Is the filter free of sloughing of excessive growth? Are the filter’s distribution arms orifices free ofclogging? Is the filter free of ponding? Is the filter free of leaks at the center column of filter's distribution arms? Owner - Facility: Little Creek WWTP Inspection Type: Compliance Evaluation ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ Comment: Uses a vortex grit classifier. Seconda ry Cl arifi er Is the overflow clear of excessive solids/pm floc? Is the sludge blanket level acceptable? (Approximately 7« of the sidewall depth) Comment: Moderate amount of scum of secondary clarifier number 1, lesser amount on number 2, and little to none on number 3. Scum most likely from running aerators at a higher rate than normal. ■ ■ ■ ■ ■ ■ ■ ■ ■ ERA NPDES 12,25453 I I I I I I I I I I I I I !6c Entry Time/Date Permit Effective Date 03/04/01AMLittle Creek WWIp Durham St Extension Exit Time/Date Permit Expiration Date Clayton NC Ob/1L/1 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)Other Facility Data James O Warrer./ORJ/919-553-1536 Name, Address of Responsible Official/Title/Phone and Fax Number Steven Flow Measurement Operations & Maintenance Facility Site Review (See attachment summary) Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date Mitchell RRO XQ//'?1-4 ■’00 Ext. 2f: 5/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. 3| Water Compliance Inspection Report Section A: National Data System Coding (i.e, PCS) Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Records/Reports Effluent/Receiving WatersSludge Handling Disposal Storm Water United States Environmental Protection Agency Washington, D C. 20460 Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Inspection Work Days 67| I 69 Bl 71 LI Facility Self-Monitoring Evaluation Rating 70U yr/mo/day 05/10/14 Contacted No QA 72U I17 Inspection Type 1BI_I FacType 20U Inspector ,9U ____________________________________________Section B: Facility Data______ POTW namLeO^dONPDESCp^mitSflum^»ffOr '"““S1" diSChar9in9 ,0 P°™- aB° indUde -379 Claytrn NC _7Slu/'rcwn Manager /919- 55 3-58-36/91955 31o41 73| | |74 —Reserved---------------------- 75| I I | | | | | 80 K Permit Self-Monitoring Program Ml Laboratory J" Remarks I I I I I I I I I I I I I I I I I I | | | | | | | | | | | | | | | Section D. Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Transaction Code 1 U 2 Id 11:3 • PM 7 (cont.)1NPDESyr/mo/day /10/14NC0025453 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) ,2I3IJ1’ Inspection Type ,8uJ17 plant: Is pnrmitted for 2.5 MGD. Units havr not bben —-.mt riprcd that will increase the design and permitted cap«icity to 2.5 YGO. Upgrade to the plant will include a rew 21 4,000-gal Ion anaerobic basin; • no new 300,000 gallon anoxic Lank, one new 200^600 gallon anoxic Lank; modi fl c ati.-i to the existing aeration basins; a new 560,000 gallon sludge liolding/digestion tank with two blowers each having HOC §cfM of deration capacity, and two 10 H? sutcersib-e mixers ? Grading is underway ter the sludge i ••idir.g tank. Influent pump station has three submersible centrifugal pt. ps witr VFD tor tw: ■_ t ‘he pimps. Audible arid visual alarms fur.ctitned when tested by the switch. Wet well has ultrasonic flew riieter with ba> up float. 3oth oxidation ditches were in operation. CQ is kept at 2.2 mg/1. ?crty percent of surface area was covered with foam. Influent was light brown to brown. Anoxic and anaerobic selectors will be added in front of oxidation ditches during next upgrade. Thick scum was noted in Secondary clarifier number 1, lesser amount in number two, and little to none in number 3. Very little scum was flowing over weirs. All weirs had even flow. Very little algae growth was noted cn weirs. Tertiary filters are covered. No algae were noted in flit •>.-. Effi lent appeared clear ir. clear well. One bank of UV was being operated. Tw«. banks are operated during ; flow. Thlcrir.o and sodium bisulphate -are on hand for back-up chlcrir.ation/dechlorinaticn. The aerated sludge holding tank was full and being lime stabiiizted during inspection. Sludge will be hauled later ir. the week by Atlantic Coast, Sludge drying beds were not being used and are used as a back up. In plant reuse ... tr ated wastewater is used si-e for nun-potable usage. Permit WQ002222'1 l.s under review to install a water reuse ro ect use an average o£ i’5,00i; gallons .! per day at the Pine Hollow Go_l Coarse. The effluent discharge submerged in the NeuSe River. Effluent appeared clear and was dxing with th-? river with no toam, solids or :doc.' July 2C04 through July 2005 DMR’s checked for permit limit and monitoring violations. One monthly violation for Ammonia was noted for April 2005. Ibis has already been addressed. July 2CG5 ZMR was checked for data -ntry, compared with lab tench sheets and cc-mmercial data and COC's. No discrepancies noted. Lab was checked in a cursory manner. Fecal coliform water bath was 44,5, BOD incubator was 18.J, drying .'-as at 103 degrees •?. Tritest analyzes all M parameters, Pace Laboratories analyzes aquatic toxicity. Michael F. Easley, Governor November 9, 2005 Subject: Dear Mr. Biggs: Cc: Central Files OneNorth Carolina Naturally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper North Carolina Division of Water Quality Internet: h2o.enr.state.nc.us Mr. Steven Biggs, Town Manager Town of Clayton P.O. Box 879 Clayton, North Carolina 27520 Mitch Hayes of the Raleigh Regional Office conducted the subject inspection October 5, 2005. The cooperation of James Warren, Grade IV ORC, during the inspection was appreciated. Please find the attached Basin Wide Information Management System (BIMS) inspection checklist summarizing the inspection. 1617 Mail Service Center 512 N. Salisbury St. Mitch Hayes Environmental Technician William G. Ross. Jr., Secretary North Carolina Department of Environment and Natural Resources Phone (919) 733-5083 FAX (919) 733-9612 Alan W, Klimek, P.E.. Director Division of Water Quality Raleigh, NC 27699-1617 Raleigh, NC 27604 Compliance Evaluation Inspection Little Creek Water Reclamation Facility NPDES Permit NC0025453 Johnston County Customer Service 1-877-623-6748 If you have any questions concerning this report 919.791.4200. or the inspection, please contact me at /DUJGi Sincerely, Permit: NC0025453 I nspection Date: 10/14/2005 Yes No NA NEInfluent Sampling ■ Is proper volume collected? ■ Is the tubing clean? ■ Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)? ■ Is sampling performed according to the permit^ Comment:Temperature was 1.5 degrees C. Yes No NA NEEffluent Sampling ■ Is composite sampling flow proportional? ■ Is sample collected below all treatment units? ■ OIs proper volume collected? ■ Is the tubing clean? ■ Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)? ■ Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Comment:Temperature was 3 degrees C. Yes No NA NEAerobic Digester ■ Is the capacity adequate? ■ Is the mixing adequate^ ■ Is the site free of excessive foaming in the tank? ■ # Is the odor acceptable7? ■ # Is tankage available for properly waste sludge? Yes No NA NEDrying Beds ■ oIs there adequate drying bed space? ■ Is the sludge distribution on drying beds appropriate? ■ Are the drying beds free of vegetation? ■ # Is the site free of dry sludge remaining in beds? ■ Is the site free of stockpiled sludge? ■ O Is the filtrate from sludge drying beds returned to the front of the plant? ■ # Is the sludge disposed of through county landfill? ■ # Is the sludge land applied? Page #9 Owner - Facility: Little Creek VWVTP Inspection Type: Compliance Evaluation Comment: Sludge was being lime stablized during inspection. Will be hauled week of October 9-15. Permit: NC0025453 Inspection Date: 10/14/2005 Yes No NA NEDrying Beds ■ (Vacuum filters) Is polymer mixing adequate? Yes No NA NESolids Handling Equipment ■ Is the equipment operational? ■ Is the chemical feed equipment operational? ■ Is storage adequate? ■ Is the site free of high level of solids in filtrate from filter presses or vacuum filters? ■ Is the site free of sludge buildup on belts and/or rollers of filter press? ■ Is the site free of excessive moisture in belt filter press sludge cake? ■ The facility has an approved sludge management plan? Comment:Sludge press was not being operated at the time of inspection. Yes No NA NEChemical Feed ■ Is containment adequate? ■ Is storage adequate^ ■ O Are backup pumps available? ■ Is the site free of excessive leaking? Yes No NA NEEffluent Pipe ■ Is right of way to the outfall properly maintained? ■ Are the receiving water free of foam other than trace amounts and other debris? ■ If effluent (diffuser pipes are required) are they operating properly? Page# 10 Owner - Facility: Little Creek VWVTP Inspection Type: Compliance Evaluation Comment: Effluent discharge pipe was submerged in the river at the time of inspection. Effluent appeared clear and was mixing with the water with no foam or solids. Comment: Drying beds are used as a back-up only. Sludge is lime stablized to Class B and hauled by Atlantic Coast. Comment: Alum is used for chemical phosphorus removal and polymer is used for enhanced clarification. Yes No NA NEDisinfection - UV ■ Is effluent clear and free of solids? One bank out of two is used. Both banks are used when flow is high.Comment: Yes No NA NEPump Station - Effluent ■ Is the pump wet well free of bypass lines or structures? ■ Are all pumps present? ■ Are all pumps operable? ■Are float controls operable? ■ Is SCADA telemetry available and operational? ■Is audible and visual alarm available and operational? Comment: Yes No NA NEStandby Power ■ Is automatically activated standby power available? ■ Is the generator tested by interrupting primary power source? ■ Is the generator tested under load? ■ Was generator tested & operational during the inspection? ■ Do the generator(s) have adequate capacity to operate the entire wastewater site? ■ Is there an emergency agreement with a fuel vendor for extended run on back-up power? ■ Is the generator fuel level monitored7 Comment:Generator is load tested weekly. Yes No NA NELaboratory ■ Are field parameters performed by certified personnel or laboratory? ■ Are all other parameters(excluding field parameters) performed by a certified lab? ■ # Is the facility using a contract lab? ■ Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)? ■ Incubator (Fecal Coliform) set to 44.5 degrees Celsius*/- 0.2 degrees? ■ Incubator (BOD) set to 20.0 degrees Celsius +/-1.0 degrees? Yes No NA NEFlow Measurement - Effluent ■ # Is flow meter used for reporting? Page#7 Owner - Facility: Little Creek WWTP Inspection Type: Compliance Evaluation Permit: NC0025453 Inspection Date: 10/14/2005 Comment: Fecal coliform water bath was 44.5, BOD incubator was 18.7, drying oven was at 103 degrees C. Tritest analyzes all N parameters, Pace Laboratories analyzes aquatic toxicity. Yes No NA NEFlow Measurement - Effluent ■ Is flow meter calibrated annually? ■ Is the flow meter operational? ■ (If units are separated) Does the chart recorder match the flow meter? Comment:Flow meter was calibrated 06/23/2005 Yes No NA NERecord Keeping ■ Are records kept and maintained as required by the permit? ■ Is all required information readily available, complete and current? ■ Are all records maintained for 3 years (lab. reg. required 5 years)? ■ Are analytical results consistent with data reported on DMRs? ■ Is the chain-of-custody complete'? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs ■ Are DMRs complete: do they include all permit parameters? ■ Has the facility submitted its annual compliance report to users and DWQ? ■ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? ■ Is the ORC visitation log available and current? ■ Is the ORC certified at grade equal to or higher than the facility classification? ■ Is the backup operator certified at one grade less or greater than the facility classification? ■ Is a copy of the current NPDES permit available on site? ■ Facility has copy of previous year's Annual Report on file for review? Yes No NA NEInfluent Sampling ■ # Is composite sampling flow proportional? ■ Is sample collected above side streams? Page #8 Owner - Facility: Little Creek VWVTP Inspection Type: Compliance Evaluation Permit: NC0025453 Inspection Date: 10/14/2005 Comment: July 2004 through July 2005 DMR's checked for permit limit and monitoring violations. One monthly violation for Ammonia was noted for April 2005. This has already been addressed. July 2005 DMR was checked for data entry, lab bench sheet, COC's. No discrepancies noted. Pumps-RAS-WAS Yes No NA NE ■ Are pumps in place? Are pumps operational?■ Are there adequate spare parts and supplies on site?■ Comment: Trickling F[lter Yes No NA NE ■ Is the filter free of ponding? ■ Is the filter free of leaks at the center column of filter's distribution arms? ■ Is the distribution of flow even from the distribution arms? ■ Is the filter free of uneven or discolored growth? ■ Is the filter free of sloughing of excessive growth? ■ Are the filter’s distribution arms orifices free of clogging? ■ Is the filter free of excessive filter flies, worms or snails? Oxidation Ditches Yes No NA NE ■ Are the aerators operational? ■ Are the aerators free of excessive solids build up? ■ # Is the foam the proper color for the treatment process? ■ Does the foam cover less than 25% of the basin’s surface? ■ Is the DO level acceptable? ■Are settleometer results acceptable (> 30 minutes)? ■ Is the DO level acceptable?(1.0 to 3.0 mg/l) ■Are settelometer results acceptable?(400 to 800 ml/l in 30 minutes) Comment:Foam covered approximatly 40% of the surface area. Nutrient Removal Yes No NA NE ■ # Is total nitrogen removal required? ■ # Is total phosphorous removal required? BiologicalType ■ # Is chemical feed required to sustain process? ■ Is nutrient removal process operating properly? Page #5 Permit: NC0025453 Inspection Date: 10/14/2005 Owner - Facility: Little Creek VWVTP Inspection Type: Compliance Evaluation Comment: Trickling filters are on site but are not being used. They will be dismantled at a later date. Permit: NC0025453 Inspection Date: 10/14/2005 Yes No NA NENutrient Removal Magnesium hydroxide and sodium hydroxide are used for pH control.Comment: Yes No NA NEFiltration (High Rate Tertiary) Down flowType of operation: ■ Is the filter media present? ■ Is the filter surface free of clogging? ■ Is the filter free of growth? ■ Is the air scour operational9 ■ Is the scouring acceptable? ■ Is the clear well free of excessive solids and filter media? Comment:Teritiry filters are covered. Effluent appeared clear in channel. Yes No NA NEDisinfection-Liquid ■ Are cylinders secured adequately? ■ Are cylinders protected from direct sunlight? ■ Is there adequate reserve supply of disinfectant? ■ Are tablet chlorinators operational? ■ Are the tablets the proper size and type? Number of tubes in use? ■(Sodium Hypochlorite) Is pump feed system operational? ■ Is bulk storage tank containment area adequate? (free of leaks/open drains) ■ Is the level of chlorine residual acceptable? ■ 0Is the contact chamber free of growth, or sludge buildup9 ■ Is there chlorine residual prior to de-chlorination? Yes No NA NEDisinfection - UV ■ Are extra UV bulbs available on site? ■ Are UV bulbs clean? ■ Is UV intensity adequate? ■ Is transmittance at or above designed level? ■ DIs there a backup system on site? Page #6 Owner - Facility: Little Creek VWVTP Inspection Type: Compliance Evaluation Comment: Liquid chlorination is used only as a back-up. Contact chamber would need to be cleaned out if used. Permit Yes No NA NE ■ (If the present permit expires in 6 months or less). Has the permittee submitted a new application? ■ Is the facility as described in the permit? # Are there any special conditions for the permit?■ ■ Is access to the plant site restricted to the general public? ■ Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping?■ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge ■ Judge, and other that are applicable? Comment: Pump Station - Influent Yes No NA NE ■ Is the pump wet well free of bypass lines or structures? Is the wet well free of excessive grease?■ ■ Are all pumps present? ■ Are all pumps operable? ■ Are float controls operable? ■ Is SCADA telemetry available and operational? ■ Is audible and visual alarm available and operational? Bar Screens Yes No NA NE Type of bar screen a.Manual Page#3 Permit: NC0025453 Inspection Date: 10/14/2005 Owner - Facility: Little Creek VWVTP Inspection Type: Compliance Evaluation Is the inspector granted access to all areas for inspection? Comment: Permit describes units that are on site but are no longer in use. The units not in use consists on the orginal wastewater treatment plant. The treatment facility consists of a mechanically cleaned bar screen, a manually cleaned bar screen, vortex type grit removal system, 9-inch Parshall flume for influent flow metering, influent wastewater pumping, extended aeration Carrousel type oxidation ditches, secondary clarifiers, sludge recirculation/waste pumping, magnesium hydroxide feed system for pH and alkalinity controls, alum feed system for chemical phosphorus removal, polymer feed system for enhanced clarification, tertiary shallow bed traveling bridge filters, UV disinfection, chlorination/dechlorination facilities (back-up only), effluent pumping to the Neuse River, aerobic sludge digestion tank, polymer sludge conditioning and thickening by drum thickener, sludge storage tank, sludge drying beds, and sludge loading station for sludge disposal by land application. Comment: Audible and visual alarms were tested using manual switch. ORC stated that floats are pulled once a week to test the A/V. Yes No NA NEBar Screens b.Mechanical ■ Are the bars adequately screening debris? ■ Is the screen free of excessive debris? ■ Is disposal of screening in compliance? ■ Is the unit in good condition? Comment: Yes No NA NEGrit Removal Type of grit removal a.Manual b Mechanical ■ Is the grit free of excessive organic matter? ■ Is the grit free of excessive odor'? ■ # Is disposal of grit in compliance? Comment:Uses a vortex grit classifier. Secondary Clarifier Yes No NA NE ■ Is the clarifier free of black and odorous wastewater? ■ Is the site free of excessive buildup of solids in center well of circular clarifier? ■ Are weirs level? ■ Is the site free of weir blockage? ■ Is the site free of evidence of short-circuiting? ■ Is scum removal adequate? ■ Is the site free of excessive floating sludge? ■ Is the drive unit operational? ■ Is the return rate acceptable (low turbulence)? ■ Is the overflow clear of excessive solids/pin floc? ■ Is the sludge blanket level acceptable? (Approximately 14 of the sidewall depth) Pumps-RAS-WAS Yes No NA NE Page#4 Owner - Facility: Little Creek VWVTP Inspection Type: Compliance Evaluation Permit: NC0025453 Inspection Date: 10/14/2005 Comment: Moderate amount of scum of secondary clarifier number 1, lesser amount on number 2, and little to none on number 3. Scum most likely from running aerators at a higher rate than normal. EPA NPDES yr/mo/day 12| 74 Entry Time/Date Permit Effective Date 0 AMLillie Creek WWTP Exit Time/DateDurham St Extension Permit Expiration Date MC PM C/11 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)Other Facility Data James O Warrer./ORC/ Name, Address of Responsible Official/Title/Phone and Fax Number O/Tcwr. Permit Facility Site Review Effluent/Receiving Waters Section D Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) 1 -571-4 Agency/Office/Phone and Fax Numbers EPA Form Page #1 L 3I Self-Monitoring Program Laboratory Sludge Handling Disposal Storm Water United States Environmental Protection Agency VUashington, DC. 20460 Form Approved. OMB No. 2040-0057 Approval expires 8-31 -98 Inspection Work Days 67|| 69 Facility Self-Monitoring Evaluation Rating 70U QA 72U Contacted NO I11 Inspection Type 18IJ —Reserved----------------------- 75| | | | | I I I80 Fac Type 20UI17 Agency/Office/Phone and Fax Numbers Inspector 19l_l / 2-z DateName(sj and Signature(s) of Inspector(s) 73LU Water Compliance Inspection Report Section A: National Data System Coding (i.e., PCS) Bl71 u_ ___________________________________________________Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW also include POTW name and NPDES permit Number) Signatui^/of Management & A ReviewerntjrThX 3q60-3 (Rev 9-94) Previous editions are obsolete. Steven Si'. Maneger/91 Section C: Areas Evaluated During Inspection (Check only those areas evaluated) H Flow Measurement ■ Operations & Maintenance ■ Records/Reports Transaction Code 1 LI 2 LI Remarks 21| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | [ | | | | | | | | | | | | [66 J17 NPDES NC0025453 yr/mo/day 05/10/14"I 12| Inspection Type 18. . July 2004 through July 2005 DMR's checked for permit limit and monitoring violations. One monthly violation for Ammonia was noted for April 2005. This has already been addressed. July 2005 DMR was checked for data entry, compared with lab bench sheets and commercial data and COC's. No discrepancies noted. The effluent discharge pipe was submerged in the Neuse River. Effluent appeared clear and was mixing with the river with no foam, solids or odor. Lab was checked in a cursory manner. Fecal coliform water bath was 44.5, BOD incubator was 18.7, drying oven was at 103 degrees C. Tritest analyzes all N parameters, Pace Laboratories analyzes aquatic toxicity. (cont.) 1 Page # 2 r _______Section D Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Plant is permitted for 2.5 MOD. The next upgrade has already begun and will include the following: a 214,000-gallon anaerobic basin; one 300,000 gallon anoxic tank, one 200,000-gallon anoxic tank; modifications to the existing aeration basins; a 360,000 gallon sludge holding/digestion tank with two blowers each having 1100 SCFM of aeration capacity, and two 10 HP submersible mixers. Grading is underway for the sludge holding tank. Influent pump station has three submersible centrifugal pumps with VFD for two of the pumps. Audible and visual alarms functioned when tested by the switch. Wet well has ultrasonic flow meter with back up float. Both oxidation ditches were in operation. DO is kept at 2.2 mg/l. Forty percent of surface area was covered with foam. Influent was light brown to brown. Anoxic and anaerobic selectors will be added in front of oxidation ditches during next upgrade. Thick scum was noted in secondary clarifier number 1, lesser amount in number two, and little to none in number 3. Very little scum was flowing over weirs. All weirs had even flow. Very little algae growth was noted on weirs. Tertiary filters are covered. No algae were noted in filters. Effluent appeared clear in clear well. One bank of UV was being operated. Two banks are operated during heavy flow. Chlorine and sodium bisulphate are on hand for back-up chlorination/dechlorination. The aerated sludge holding tank was full and being lime stabilized during inspection. Sludge will be hauled later in the week by Atlantic Coast. Sludge drying beds were not being used and are used as a back up. In plant reuse of treated wastewater is used on site for non-potable usage. Permit WQ0022224 is under review to install a water reuse project to use an average of 175,000 gallons of per day at the Pine Hollow Michael F. Easley, Governor December 9, 2005 Subject: Dear Mr. Biggs: If you have any questions concerning this report, please contact me at 919.791.4200. Sincerely, Cc: Central Files An Equal Opportunity/Affirmative Action Employer - 50% Recyded/10% Post Consumer Paper North Carolina Division of Water Quality Internet: h2o.enr.state.nc.us Mr. Steven Biggs, Town Manager Town of Clayton P.O. Box 879 Clayton, North Carolina 27520 Please find the amended Basin Wide Information Management System (BIMS) inspection checklist summarizing the inspection. James Warren stated that first BIMS checklist I sent indicated that the plant was not permitted for 2.5 MGD. This was not my intent and I apologize for the confusion. The original checklist will be expunged from the file and replaced with the attached BIMS checklist. 1617 Mail Service Center 512 N. Salisbury St. William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources Phone (919) 733-5083 FAX (919)733-9612 Alan W. Klimek, P.E., Director Division of Water Quality Raleigh. NC 27699-1617 Raleigh. NC 27604 Customer Service 1-877-623-6748 Amended Compliance Evaluation Inspection Report Little Creek Water Reclamation Facility NPDES Permit NC0025453 Johnston County NprthCarolina Naturally Mitch Hayes / Environmental Technician 6^-^ aia