Loading...
HomeMy WebLinkAboutNCC242900_ESC Approval Submitted_20240919 ft Iredell County Planning & Development Erosion Control Section I R E D E L L 349 North Center Street / N. I N C P.O. Box 788 Statesville, NC 28687 Date: September 10th 2024 LETTER OF APPROVAL David Borreson Peachtree Residential 7380 McGinnis Ferry Rd. Suwannee, GA 30024 RE: Project Name: Pirates Cove Lots 1-4 Acres Approved: 1.89 Project ID: IREDE-2025-010 Project Location: PIN 4648170210.000 Submitted By: Bluestone Land Management, PLLC Date Received: September 9th 2024 Plan Type: New Dear Mr. Borreson: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3)years following the date of approval as is required by Title 15A NCAC 4B.0129 and Appendix H of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also,this letter gives notice as required by G.S. 113A-61.1(a) and Appendix H of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Letter of Approval Pirates Cove Lots 1-4 September 10th 2024 Page 2 of 3 Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the applicable annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form and fee details may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. As required in the approved plan construction sequencing, please schedule a preconstruction conference with our staff prior to land disturbing activity. Your cooperation is appreciated. Sincerely, o la--X/49‘/---, Jonathan Williams, CESSWI Erosion Control Coordinator Enclosures: Fact Sheet on the New NCG01 Permit Permit Letter of Approval Pirates Cove Lots 1-4 September 10th 2024 Page 3 of 3