HomeMy WebLinkAboutNCC242871_Site Plan or Location Map_20240919 ESPC LEGEND
ESPC I BMP LINETYPE/SYMBOL O p, EXp�
CONSTRUCTION EXIT(CO) :��:�t `"
SILT FENCE(SF)
SILT FENCE-DOUBLE(SF) 14� )9 N
INLET PROTECTION(IF)
•
OUTLET PROTECTION(OP) 2 /
DUST CONTROL-DISTURBED AREAS DC
TEMPORARY SEEDING TS yeti SE K� G'V
C PERMANENT SEEDING PS
_ c — J I III MULCHING M
I \ o I SODDING So
II 0 ! \ l\l �_z—o
j \ o I= SLOPE STABILIZATION I PANDA EXPRESS,INC.
/ I ) GDP 1 14 \�/ \\ TREE PROTECTION �tP�
I II VE.
1 - -- / LL �\ I \ x7 o I I \� 1683 WALNUT GROVE A917
SEE LANDSCAPE/TREE PROTECTION PLANS FOR LEGEND SPECIFIC TO ROSEMEAD,CALIFORNIA 91770
/// /j_— 11 / I \ THOSE SHEETS TELEPHONE:626.799.9898
/ I /L (I` �1 \ I I FACSIMILE:626.372.8288
�i� / rl �/ L� _ J1 _ J
o, no,1, /1 r z ' 26 ea �/ — IL ESPC NOTES
�, s / _� ee / I \ All ideas,designs,arrangement and plans indicated or
17 / �� _ represented by this drawing are the property of Panda
— — — _ _ _ _ __ _ ay 2$_ j \ GENERAL Express Inc.and we created for use on this specific
NEW POI TE-BLVD. �' — —am — eo, —— a N" V— — t None of these ideas,deli arrangements N w Mproject. designs,arran is or
PATE \ N I \ _/ 1.EROSION CONTROL MEASURES SHALL BE MAINTAINED AT ALL plans may be used by or disclosed to any person,firm,or
(M.B.132,PG.6)(D.B.3608,PG.795)_ ®` ®, PS oo® ' I '' TIMES.IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES corporation without the written permission of
e
FA1417
/ ERO PROVIDE TRO EFFECTIVE SROSIDN CONTROL,ADDITIONALPanda Express Inc.
_ _ oo, EROSION CONTROL MEASURES ANO PRACTICES SHALL BE\ IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE
��6' o7 , } PS. • — —— — — AT THE EXPENSE OF THE CONTRACTOR.
- �\ W PS Z / \\ 2.THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED
_ \ I BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL
\ —26 _ /�_ — MEASURES AND PRACTICES PRIOR TO LAND DISTURBING REVISIONS:
1 �'% ACTIVITIES.
�� h 8 FI I ('S I 3.ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER A 08/29/2024 TOWN/UTILITY COMMENTS
\\\\ W Ill- m 1�/ THAN 14 DAYS SHALL BE STABILIZED WITH MULCH OR
/1 TEMPORARY SEEDING.
-
/ \ ft Z a N \ /(� 4.ANY AMENDMENT TO THE EROSION CONTROL PLANS WHICH HAVE
/ O^ {®PS a .r c--1
-— /� a�„ or
OPIIIIA SIGNIFICANT EFFECT ON AMPS WITH A HYDRAULIC COMPONENT
—�°_— III( II MUST BE CERTIFIED BV THE DESIGN PROFESSIONAL.
OOj \g' - 5.THE PERMITEE IS ONLY RESPONSIBLE FOR THE FOR THE
Ir
/ ¢ II' _ /' 1 I1�II�II I ^ INSTALLATION AND MAINTENANCE OF STORM WATER
_�I C O I I R2 m i I MANAGEMENT DEVICES PRIOR TO STABILIZATION OF THE SITE
I 11
I�1 AND NOT THE OPERATION AND MAINTENANCE OF SUCH
/ti ° D . nT®I II1L. I a I \ II 26\ COMPLETED.S AFTER CONSTRUCTION ACTIVITIES HAVE BEEN
p = 1 6.EROSION CONTROL AND TREE PROTECTION MEASURES SHALL BE
di 0 V I m I INSTALLED PRIOR TO ANY OTHER CONSTRUCTION ACTIVITY AND
o / �••e KO�^ J \m , MAINTAINED UNTIL PERMANENT GROUND COVER IS
ESTABLISHED.
® a 0 2,697 SF g N I / 7.SEE GRADING 8 DRAINAGE NOTES. ISSUE DATE:
�PS / FFE=26.50'
a n•`. I PERMIT/BID 07/17/2024
\\ ° I / PO L OP SLOPES AND DISTURBED AREA STABILIZATION PERMIT/BID 08/29/2024
III
ill I I / F a ® I I 1.CONCENTRATED FLOW AREAS AND ALL SLOPES 2H:1V OR
STEEPER SHALL BE STABILIZED WITH THE APPROPRIATE EROSION
CONTROL MATTING OR BLANKET.
ti6 ® I v I 2.ALL CUT AND FILL SLOPES MUST BE SURFACE ROUGHENED AND
J J N I "R1.1 II N VEGETATED WITHIN(7)DAYS OF THEIR CONSTRUCTION.
gi__ �(i\ / F a I I 3.ALL DISTURBED AREAS SHALL BE GRASSED AS SOON AS
jI CONSTRUCTION PHASES PERMIT. NO EXPOSED GRADE WILL BE
I o f I a I I II 16 N / LEFT UNSTABLE FOR MORE THAN 7 DAYS.
6 4.PERMANENT GRASSING AND LANDSCAPING OF DISTURBED AREAS
/� d / yl——tit a�`J—— 1 I I I I I O SHALL BE COMPLETED AS QUICKLY AS POSSIBLE. TEMPORARY
/jj , ' I BE REQUIRED STABILIZATION THE Y ULCHING EVENT OF PROOR JECT ECT DELAYSv SEEDING WILL
IWL °°Il O., , J) I I 5.WIRE MESH REINFORCED SEDIMENT BARRIERS SHALL BE PLACED DRAWN BY:DA
/ I PS \,,,,
m iOP 0 DRAI AT THE TOE OF ALL FILL SLOPES.
J \ II I O
Z
?' _ I� ■ LLL \
N II I }Ce 1.ALL DRAINAGE STRUCTURES SHALL BE EROSION PROOFED.
I I O MAINTENANCE AND INSPECTIONS PANDA PROJECT#:D32523
? I PANDA STORE#:TBD
n.
r °SA\ I i ,�®■ / s mI:I�II IIII
1.SEDIMENT CONTROL DEVICES MUST BE INSPECTED DAILY AND CIVIL PROJECT#:240010
CHECKED AFTER EACH STORM EVENT AND CLEANED OR
_=I o°� I - I I I I I I REPLACED WHEN THEY REACH 1/3 OF DESIGN CAPACITY.
I 2.MAINTENANCE OF ALL SOIL AND SEDIMENTATION CONTROL
//�6. I I o I I Im MEASURES AND PRACTICES, WHETHER TEMPORARY OR
/ F III 'L I I / I J \ 9 I I� I I PERMANENT,SHALL BE AT ALL TIMES THE RESPONSIBILITY OF „
ll `a�� — �� / \?� g —I PS PSI I II III IIII 1 THE CONTRACTOR. ,r I N G E N I U M
\ I-
7.
�, �T , I ❑ \ °I I� I I /
I III / \ PS u / \ I I / INGENIUM ENTERPRISES,INC.
I Io / II I 1 .. I ® 0 I I III II I I� / 19445 SSUMARD OAK DR.
3-La' SUITE 102
—25- l �—J6 18 I I m° I I I� m I I LAND 0 LAKES,FL 34638
BASED IN THE WEB SOIL SURVEY PHONE:(813)387-0084
il
,�. — I - I I I I r FFE=zs.14 INFORMATION,ALL SOILS AT THIS SITE
4
'� �� I E� I I I I I ARE CLASSIFIED AS FO:FORESTON NCBEESCERTIFICATE#C-4114
SI I N N LOAMY FINE SAND,TO:TORHUNTA
m I II N _ / I MUCKY FINE SANDY LOAM
' \ •
. L J r°� Q li I 1
/ T
L Jr", ■ / N6 = I N N TOTAL DISTURBED AREA THIS
J ® I PS oN I I I I I I J \ PHASE: 0.97 AC.
\ �25 /I ° 111 \ / /\ ( I8 '/
II JII�I 1 1111 III 9 � a`'jH CARO���.,-
I � II North8 l
(III)JIII,1�bL � '�:
/' (f.: - ■ - - - ■ 26 'f �4.-L----,*1�III 1�� �' - - Carolina �. p - L -— 1 I 1 / www.nc811.or9
-\ y
— ryr— • / ,�9F I�NAg
Y/
MAINTAIN SEDIMENT CONTROL \ 24-HOUR CONTACT: � 71
=L__— ?s_ DUSTIN SCOLES
AT ALL TIMES.ANY SEDIMENT \ ` /'� / 828-460-1272
WHICH EXITS THE PROJECT AREA �z6 -
MUST BE CLEANED DAILY. / /
ESPC PLAN
GATEWAY BLVD. / / FINAL PHASE
VARIABLE WIDTH PUBLIC RIGHT OF WAY
�� — — — — — L.B.106,PG.70) / b
_ i —/ Il%� zo ap
ALL FINAL STABILIZATION SHALL _ — - / _ \ II a. C 0 6 • 3
— Z---� \ a� SCALE:1"=20'
MATCH THE LANDSCAPE PLANS —_ — \�\ j — -_--�--_- S,
PANDA HOME