Loading...
HomeMy WebLinkAboutNCC242864_ESC Approval Submitted_20240918 Garrett Kraus From: Garrow, Benjamin A <benjamin.garrow@deq.nc.gov> Sent: Monday, September 16, 2024 1:16 PM To: Garrett Kraus Subject: FW: NC DEMLR - FROF Application Approval with Modifications Needed CRM:0242166 Attachments: Application Report - Monday, September 16, 2024 104 PM.pdf From: SVC_DoNotReply-DEQPermits<DoNotReply-DEQPermits@deq.nc.gov> Sent: Monday, September 16, 2024 1:15 PM To: CIP ICC LLC<ania@ciprealestate.com> Cc: Daylight Engineering<nick@daylighteng.com> Subject: NC DEMLR- FROF Application Approval with Modifications Needed CRM:0242166 J . _ North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Land Quality Section Roy Cooper Governor Elizabeth S. Biser Secretary William Vinson Jr. (Acting) Director 09-16-2024 1 CIP ICC LLC 19762 Macarthur Blvd Irvine, CA 92612 RE: Project Name: International Corporate Center Acres Approved:4.9 Application ID: PA-007248 Permit Number: CABAR-2024-0106 Address:Corporate Drive NW City:Concord County:Cabarrus River Basin:Yadkin-Pee Dee Stream Classification: C:Aquatic Life,Secondary Contact Recreation, Fresh water Plan Type: Revised Plan Dear CIP ICC LLC, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page.The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit.After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email.As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity.The eNOl form may be accessed atdeq.nc.gov/NCG01. Please direct questions about the eNOl form totheStormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtaina newCOC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. 2 Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan, not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Modifications Required for Approval: This Approval is for the change of the Financially Responsible Party. All Modifications listed under the Approval from February28th, 2024 still apply to this project. Your cooperation is appreciated. Sincerely, North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval Lt North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville NC,28115 704-663-1699 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 3