Loading...
HomeMy WebLinkAbout310226_Application - Digester Design Revision_20240910w ENGINEERS • MANUFACTURERS CONSTRUCTORS September 10, 2024 Christine Lawson NCDEQ Division of Water Resources 1601 Mail Service Center Raleigh, NC 27699-1601 AFO Permit Application Subject: Rhett Enterprises, LLC Facility # AWS310226 State Digester General Permit — Design Revision Dear Ms. Lawson, Roeslein & Associates, on behalf of the farm owner, hereby submits the following revision for digester design at Rhett Enterprises, LLC. As discussed, we are revising the design to eliminate the mixing well at the digester. This mixing pump pulled water from the digester and discharged water back into the digester. Influent into the digester will either come from a wet well lift station between the barns and digester or directly from the barns via gravity pipe. The sampling protocol document verbiage has been updated to clarify that all digester influent sampling will be taken via cleanout in the influent piping prior to entering the lagoon. To facilitate your review of the enclosed documentation, the following is an itemized breakdown: 1. One (1) revised copy Sampling Protocol and Schedule 2. One (1) copy of revised General Arrangement Plan to reflect eliminated mixing pump 3. One (1) copy of revised Hydraulic Profile Plan to reflect eliminated mixing pump Please do not hesitate to contact me or my office if you have any questions, comments or require any additional information. Thank you, G . i� Christopher Fey Manager, Building Design & Construction Roeslein & Associates Attachments Cc: Farm Owner Page 1 of 1 Sampling protocol and schedule for Monarch sites Date: 08/23/2024 R08.23.24 Sample collection at all sites should be done using the sampling protocol outlined below. A submittal sheet will be sent to the person in charge of sampling prior to sampling. The respective person is responsible for print submittal forms, conducting sampling, label samples as per submittal form, safely storing (refrigerated containers during storage) and shipping samples to the respective lab (instructions on submittal form) Required accessories: 1. Telescopic sampler extendable to 18 feet and the pendulum beaker 2. Gloves and sampling containers 3. Ice packs. 4. Sampling submittal forms 5. Safety supplies During sampling event two people should be responsible while supporting tasks (shipping etc.) can be conducted by the person in charge alone. Sampling protocol for digester samples 1. Influent and effluent samples are intended to be collected for all sites from shortlisted digesters on a quarterly basis. Sampling to be conducted by two persons at the site. 2. Label all sampling containers with respective sampling ids. 3. The influent sample must be collected from a "cleanout" just prior to entering the lagoon using the telescopic sampler and 5-gallon bucket while following all site -specific safety policies, including Lagoon Access Safety Procedure 4. The effluent sample must be collected from the crossover pipe/wet well using the telescopic sampler and 5-gallon bucket while following all site -specific safety policies, including Lagoon Access Safety Procedure 5. Procedure for sample collection from a Cross over pipe a. On opening the valve on crossover pipe it is recommended to allow enough time to pass such that the standing debris in the pipe is flushed out and a good representative sample can be collected. b. Collect 3 x 500 mL samples using the sampler into a clean 5-gallon bucket. c. Repeat this procedure 2 more times, while collecting all the samples into the same 5-gallon bucket. d. Allow sufficient time between two collection events such that pipe contents are flushed. e. At the end of the sampling event, you may have — 1.3-1.5-gallon sample, homogenize the contents of the bucket gently mixing using the sampler and the pendulum beaker on the sampler. 6. Sampling for sample collection from a wet well or cleanout. a. Using the telescopic sampler (beaker attached to the rod) gently homogenize contents of the wet well. b. Collect 6-8 beakers of sample into a 5-gallon bucket from different areas of the wet well/cleanout to get a representative sample. c. Gently homogenize the contents of the bucket. 7. Grab a sample from the homogenized mixture to fill the labeled sampling container (influent or effluent) and put the container cap tightly ensuring a watertight seal. 8. If the samples are to be stored for more than 2 hours before shipping, store them in a refrigerator preferably 4°C or lower. 9. If refrigeration is not available use frozen icepacks to cool the samples and replace icepacks at regular intervals, store the samples in a well -ventilated space. 10. DO NOT STORE SAMPLES IN REFRIGERATORS MEANT FOR FOOD STORAGE 11. Ship samples to the lab (details in the submittal form) to deliver overnight. Include ice packs in the shipping box to keep samples cool during transit. Sampling protocol for lagoon liquid samples (Secondary lagoon 1. Lagoon liquid samples are intended to be collected from all the open lagoons at every site on a quarterly basis. 2. Label all sampling containers with respective sampling ids. (Refer sample list for Sample IDs) 3. The sample must be collected from the multiple spots (6-8) in the open lagoon using the telescopic sampler and 5-gallon bucket while following all site -specific safety policies, including Lagoon Access Safety Procedure 4. Use the 18 feet telescopic sampler to reach lagoon water surface from the berm, it is needed that the sampling in charge is accompanied by another operator onsite for this sampling for ease of equipment handling and safety. 5. Collect 2 x 500 mL samples at each spot, using the sampler into a clean 5-gallon bucket. 6. Repeat this procedure at all 6-8 randomly chosen spots along with periphery of the lagoon, collect all the samples into the same 5-gallon bucket. 7. At the end of the sampling event, you may have — 1.3-1.5-gallon sample, homogenize the contents of the bucket gently mixing using the sampler and the pendulum beaker on the sampler. 8. Grab a sample from the homogenized mixture to fill the labeled sampling container and put the container cap tightly ensuring a water/airtight seal. 9. If the samples are to be stored for more than 2 hours before shipping, store them in a refrigerator preferably 4C or lower or use frozen icepacks to cool the samples in a small container and replace icepacks at regular intervals, store the samples is a well -ventilated space. 10. DO NOT STORE SAMPLES IN REFRIGERATORS MEANT FOR FOOD STORAGE 11. Ship samples to the lab (details in the submittal form) to deliver overnight. Include ice packs in the shipping box to keep samples cool during transit. Sludge survey and sampling from secondary lagoon 1. The secondary lagoon, source of sludge, will be examined for sludge levels once every four years. 2. Sludge levels in the covered digesters will be examined once every four years appropriate sludge management plans will be put in place to keep sludge levels in the digester under control. 3. Sludge sampling, from the secondary lagoon, will be conducted during sludge management events to determine sludge composition especially Nitrogen, Phosphorus, potassium, and other micronutrients. 4. This sampling protocol is intended to help evaluate progression of sludge level in the secondary lagoon and covered digeste and ensure agronomic land application. 5. Sludge sampling will be conducted using a sludge judge, while sludge surveys will be conducted using sonar devices that can be remotely controlled from the berm following all site -specific safety policies, including Lagoon Access Safety Procedure. Recommended analysis Table 1 Recommended tests for lagoon/digester effluent sampling Digester effluent, secondary lagoon effluent and sludge testing Manure package Eff-MMDDYY Inff-MMDDYY Nitrogen, Ammonium Nitrogen, Organic Nitrogen, Phosphate, Potash, Calcium, Copper, Iron, Magnesium, Manganese, Sodium, Sulfur, Zinc, Moisture/Total Solids, Total Salts, pH VS Alkalinity Volatile organic acids COD BOD5 Total testing cost Amongst the manure package TS, Ammonium nitrogen, pH are mandatory tests and if done separately cost more than the package. Table 2 Optional tests for lagoon/digester effluent sampling Orthophosphate Sulfate Sulfide EC Carbon Mr I # (S-8) RA-STD-255 oil LAGOON 17049 - �o W79.00 RAINWATER LINE S-4 RA-STD-256 S-7 RA-STD-264 F AVITY SFER job (S-2) RA-STD-295 27518A RECYCLE PUMP rt� PROPOSED GAS LINE TEMPORARY FLARE. MIN 50' AWAY (S-8) RA-STD-255 DIGESTER-�� INFLUENT 71.00 i DIGESTER EFFLUENT (S-1) RA-STD-280 (S-1) RA-STD-285 5 SEWER INFLUENT LINE MODIFICATIONS NEEDED jpm-mmpw WATER TRANSFER LINE RAINWATER LINE S-4 RA-STD-256 (S-3) RA-STD-274, (S-9) RA-STD-261 ' (S-9) RA-STD-267 S-6 RA-STD-266 83.00 , &L 0 0 27518B WELL 100' SET BACK w AREA 1000 RHETT ENTERPRISES FARM 27018 LOCATION DETAIL ZACHARY STEWART 9/5/2024 9:34:30 AM C:\VAULT\PROJECTS\MONARCH BIO ENERGY\REGISTER NC\CADD\01 RA270\ORTHOS\DWGS\00 GENERAL ARRANGEMENTS\RA270-00-27018.DWG (S-1) RA-STD-285 1 SEWER INFLUENT LINE MODIFICATIONS NEEDED 4�r I qp i�� 400 FARM PRODUCTION INFORMATION CITY AVG AN N UAL AN I MAL POPU LATI ON 7200 ESTIMATED RNG I NJ DTH/YR 7982 AN I MAL TYPE GF BARN OPERATION TYPE Flush ti SYSTEMS SYSTEM OPTION SELECTED CITY EXISTING BARN EFFLUENT GRAVITY SEWER 8 S-1 DIGESTER INFLUENT LIFT STATION 1 S-2 DIGESTER EFFLUENT GRAVITY TRANSFER 2 S-3 WET WELL YES 1 S-4 COVER/RAIN WATER REMOVAL YES 2 S-5 POWER FLUSH YES 1 S-6 SLUDGE REMOVAL YES 1 S-7 EMERGENCY VENT YES 2 S-8 BIOGAS INTERFACE YES 1 DIGESTER PARAMETER VALUE UNITS 1 LENGTH 345 FT WI DTH 170 FT TOP OF DIKE ELEVATION 94.2 FT DEPTH 12 FT BOTTOM ELEVATION 82.2 FT DIKE WIDTH 15 FT INTERIOR SLOPE 3:1 EXTERIOR SLOPE 3:1 OPERATING HEIGHT 10 FT OPERATING ELEVATION 92.2 FT - LOW DIGESTER OPERATING HEIGHT N/A FT LOW DIGESTER OPERATING ELEVATION N/A FT OPERATING VOLUME 2923874 GAL TOTAL VOLUME 3755881 GAL CUT 9567 CY FI LL 9325 CY NET 242 CY PIPE SERVICE SIZE SPECIFICATION CITY UNITS BARN EFFLUENT (GRAVITY) 1211 PL01 350 FT EXISTING BARN EFFLUENT (FORCED) N/A N/A N/A N/A LIFT STATION OVERFLOW 12" HP01 100 FT DIGESTER INFLUENT (FORCED) 811 HP02 1000 FT DIGESTER INFLUENT (FORCED) 611 HP02 900 FT DIGESTER INFLUENT CLEANOUT X11 PL01 N/A EA DIGESTER EFFLUENT (FORCED) 611 HP02 500 FT WATER TRANSFER WET WELL LATERAL 12" HP01 50 FT DIGESTER EFFLUENT (GRAVITY) 12" HP01 300 FT WET WELL LATERAL N/A N/A N/A FT COVER WATER SUCTION 311 HP01 80 FT COVER WATER DISCHARGE 311 HP02 200 FT POWER FLUSH 611 HP02 100 FT SLUDGE REMOVAL 1211 HP02 50 FT N MIXING SUCTION 811 HP02 50 FT �o MIXING DISCHARGE 6" HP02 358 FT TRUE NORTH I I I SCALEslzE MILLIMETERS: D 04SEPT24 UPDATED DATA INFORMATION ZTS MVK CIF'— 1 -250' E C 21SEP23 ISSUED FOR GROWERS MEETING ZTS ZTS MVK MVK ♦J``�-fr'FES / B 08SEP23 ISSUED FOR GROWERS MEETING ZTS ZTS MVK MVK DIMENSION TOLERANCE xx _+0.10 'L��i�� A 11AUG23 ISSUED FOR REVIEW ZTS ZTS MVK MVK (UNLESS OTHERWISE xxx=±0.010 SPECIFIED) ANGLES =±0.5° REV DATE REVISION DESCRIPTION BY DRWN CHK'D APP'D I S t - # BY BY BY FRACTIONS: INCHES: — i �656059 �Uf THIS DOCUMENT, ALONG WITH ITS DESIGNS, KNOW-HOW AND DRAWINGS, CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION MACHINED PARTS =±1/64 THAT IS THE PROPERTY LROESLEIN AND FEDERALAAW, NCLUDINGASSOCIATES, D O t 8 U C SECTIION1836 AND 17NUCSECTION 101 eeq. ROESLEIN & ASSOCIATES, INC. AND ROESLEINSTATE =±1/32 .XX =±.010 HOLE LOCATIONS ON ��� ALTERNATIVE ENERGY, LLC RESERVES ALL PATENT, COPYRIGHT AND OTHER PROPRIETARY RIGHTS TO THIS DOCUMENT, INCLUDING ALL WELDED ASSEMBLIES i'�� ♦� DESIGN, MANUFACTURING, REPRODUCTION, USE, AND SALES RIGHTS THERETO, EXCEPT TO THE EXTENT SAID RIGHTS ARE EXPRESSLY .XXX =±.005 (i �..' ♦ LINEAR DIMENSIONS ON XXXX=±.0002 N ♦ GRANTED TO OTHERS. THIS DOCUMENT MUST NOT BE DUPLICATED OR DISCLOSED, IN WHOLE OR IN PART, WITHOUT THE EXPRESS =±1/16 I � STRUCTURAL WELDMENTS =+ ♦ ANGLES _.05° i1"' �CONTPROVIDED ISNED NS PERMIHIS SSION PROHIIBITOTHER THAN BY THF ED. UPON OTHE REQUEST OF ROESLIZED RECIPIENT & ASSOCIATES, NC EXPRA D ROESLESS OESN ALFOR ERNATIVEOENERGY,,N LC ANGLES =±1 ° THE HOLDER OF THIS DOCUMENT AGREES TO IMMEDIATELY RETURN OR DESTROY THIS DOCUMENT AND ALL COPIES THEREOF IN ITS D O NOT SCALE PRINT 09/0, POSSESSION. ©2023 ROESLEIN & ASSOCIATES, INC. AND ROESLEIN ALTERNATIVE ENERGY, LLC MONARCH BIO ENEGRY REGISTER, NC AREA 1000 RHETT ENTERPRISES FARM NEW DIGESTER LAYOUT ENGINEERS • MANUFACTURERS • CONSTRUCTORS DWG. G . SHEET REV NO. RA270-00-27018 4OF6 D 120 110 100 �! 1 :1 LIFT STATION F:(88.2) FF:(88.2) FF:(88.2) FF:(88.2) (SEE DETAIL) T:87.20 PIT:87.20 PIT:87.20 PIT:87.20 RIM: 87.70 F PI LIFT STATION IL FF:(84.5) FF:(84.5) FF:(84.5) FF:(84.5) FF:(84.5) (SEE DETA) PIT:82.50 PIT:82.50 PIT:82.50 PIT:82.50 PIT:82.50 RIM:83.00 BOTTOM: 77.70 BOTTOM: 73.00 70 NOTE: INVERTS OF EXISTING GRAVITY PIPING ARE APPROXIMATED BASED ON BEST AVAILABLE SURVEY INFORMATION. LEGEND: TOB: TOP OF BANK ELEVATION FF: FINISHED FLOOR ELEVATION FB: FREEBOARD ELEVATION EG: EXISTING GRADE ELEVATION OL: OPERATING LEVEL ELEVATION INV: INVERT ELEVATION SHWT: SEASONAL HIGH WATER TABLE LIQUID FLOW DIRECTION TOB: 94.20 HDPE COVER PROPOSED DIGESTER BOTTOM: 82.20 RIM: 95.20 12" MIN ABOVE EX GRADE I INV: 89.20 NV: 89.45 LEVEL CONTROL PIPE (LC-1) 0.5 0 MIN. BOTTOM: 87.20 INV: 90.20 LEVEL CONTROL WET WELL (SEE DETAIL) OUTLET: _t/__92.20 (LC-2) FLOATING EXISTING PUMP LAGOON FB:81.75 (27518A) NV: 80.88 TOP OF TEMP STORAGE: 81.05- BOTTOM: 72.75 TOB: 82.75 WATER TRANSFER � �SHWT:77.75 EXISTING LAGOON FB:85.00 27518B TOP OF TEMP STORAGE: 84.30 BOTTOM: 73.00 TOB: 86.00 SHWT: 80.00 120 110 EE 70 .1] CHAMILTON 8/22/2024 11:32:51 AM R:\200599\06-DRAWINGS\CIVIL\AlK\REGISTER-CLUSTER 1\AFO PERMIT DRAWINGS\27018 RHETT ENTERPRISES AFO PERMIT.DWG F PI LIFT STATION IL FF:(84.5) FF:(84.5) FF:(84.5) FF:(84.5) FF:(84.5) (SEE DETA) PIT:82.50 PIT:82.50 PIT:82.50 PIT:82.50 PIT:82.50 RIM:83.00 BOTTOM: 77.70 BOTTOM: 73.00 70 NOTE: INVERTS OF EXISTING GRAVITY PIPING ARE APPROXIMATED BASED ON BEST AVAILABLE SURVEY INFORMATION. LEGEND: TOB: TOP OF BANK ELEVATION FF: FINISHED FLOOR ELEVATION FB: FREEBOARD ELEVATION EG: EXISTING GRADE ELEVATION OL: OPERATING LEVEL ELEVATION INV: INVERT ELEVATION SHWT: SEASONAL HIGH WATER TABLE LIQUID FLOW DIRECTION TOB: 94.20 HDPE COVER PROPOSED DIGESTER BOTTOM: 82.20 RIM: 95.20 12" MIN ABOVE EX GRADE I INV: 89.20 NV: 89.45 LEVEL CONTROL PIPE (LC-1) 0.5 0 MIN. BOTTOM: 87.20 INV: 90.20 LEVEL CONTROL WET WELL (SEE DETAIL) OUTLET: _t/__92.20 (LC-2) FLOATING EXISTING PUMP LAGOON FB:81.75 (27518A) NV: 80.88 TOP OF TEMP STORAGE: 81.05- BOTTOM: 72.75 TOB: 82.75 WATER TRANSFER � �SHWT:77.75 EXISTING LAGOON FB:85.00 27518B TOP OF TEMP STORAGE: 84.30 BOTTOM: 73.00 TOB: 86.00 SHWT: 80.00 120 110 EE 70 .1] CHAMILTON 8/22/2024 11:32:51 AM R:\200599\06-DRAWINGS\CIVIL\AlK\REGISTER-CLUSTER 1\AFO PERMIT DRAWINGS\27018 RHETT ENTERPRISES AFO PERMIT.DWG LIFT STATION IL FF:(84.5) FF:(84.5) FF:(84.5) FF:(84.5) FF:(84.5) (SEE DETA) PIT:82.50 PIT:82.50 PIT:82.50 PIT:82.50 PIT:82.50 RIM:83.00 BOTTOM: 77.70 BOTTOM: 73.00 70 NOTE: INVERTS OF EXISTING GRAVITY PIPING ARE APPROXIMATED BASED ON BEST AVAILABLE SURVEY INFORMATION. LEGEND: TOB: TOP OF BANK ELEVATION FF: FINISHED FLOOR ELEVATION FB: FREEBOARD ELEVATION EG: EXISTING GRADE ELEVATION OL: OPERATING LEVEL ELEVATION INV: INVERT ELEVATION SHWT: SEASONAL HIGH WATER TABLE LIQUID FLOW DIRECTION TOB: 94.20 HDPE COVER PROPOSED DIGESTER BOTTOM: 82.20 RIM: 95.20 12" MIN ABOVE EX GRADE I INV: 89.20 NV: 89.45 LEVEL CONTROL PIPE (LC-1) 0.5 0 MIN. BOTTOM: 87.20 INV: 90.20 LEVEL CONTROL WET WELL (SEE DETAIL) OUTLET: _t/__92.20 (LC-2) FLOATING EXISTING PUMP LAGOON FB:81.75 (27518A) NV: 80.88 TOP OF TEMP STORAGE: 81.05- BOTTOM: 72.75 TOB: 82.75 WATER TRANSFER � �SHWT:77.75 EXISTING LAGOON FB:85.00 27518B TOP OF TEMP STORAGE: 84.30 BOTTOM: 73.00 TOB: 86.00 SHWT: 80.00 120 110 EE 70 .1] CHAMILTON 8/22/2024 11:32:51 AM R:\200599\06-DRAWINGS\CIVIL\AlK\REGISTER-CLUSTER 1\AFO PERMIT DRAWINGS\27018 RHETT ENTERPRISES AFO PERMIT.DWG BOTTOM: 77.70 BOTTOM: 73.00 70 NOTE: INVERTS OF EXISTING GRAVITY PIPING ARE APPROXIMATED BASED ON BEST AVAILABLE SURVEY INFORMATION. LEGEND: TOB: TOP OF BANK ELEVATION FF: FINISHED FLOOR ELEVATION FB: FREEBOARD ELEVATION EG: EXISTING GRADE ELEVATION OL: OPERATING LEVEL ELEVATION INV: INVERT ELEVATION SHWT: SEASONAL HIGH WATER TABLE LIQUID FLOW DIRECTION TOB: 94.20 HDPE COVER PROPOSED DIGESTER BOTTOM: 82.20 RIM: 95.20 12" MIN ABOVE EX GRADE I INV: 89.20 NV: 89.45 LEVEL CONTROL PIPE (LC-1) 0.5 0 MIN. BOTTOM: 87.20 INV: 90.20 LEVEL CONTROL WET WELL (SEE DETAIL) OUTLET: _t/__92.20 (LC-2) FLOATING EXISTING PUMP LAGOON FB:81.75 (27518A) NV: 80.88 TOP OF TEMP STORAGE: 81.05- BOTTOM: 72.75 TOB: 82.75 WATER TRANSFER � �SHWT:77.75 EXISTING LAGOON FB:85.00 27518B TOP OF TEMP STORAGE: 84.30 BOTTOM: 73.00 TOB: 86.00 SHWT: 80.00 120 110 EE 70 .1] CHAMILTON 8/22/2024 11:32:51 AM R:\200599\06-DRAWINGS\CIVIL\AlK\REGISTER-CLUSTER 1\AFO PERMIT DRAWINGS\27018 RHETT ENTERPRISES AFO PERMIT.DWG TOB: 94.20 HDPE COVER PROPOSED DIGESTER BOTTOM: 82.20 RIM: 95.20 12" MIN ABOVE EX GRADE I INV: 89.20 NV: 89.45 LEVEL CONTROL PIPE (LC-1) 0.5 0 MIN. BOTTOM: 87.20 INV: 90.20 LEVEL CONTROL WET WELL (SEE DETAIL) OUTLET: _t/__92.20 (LC-2) FLOATING EXISTING PUMP LAGOON FB:81.75 (27518A) NV: 80.88 TOP OF TEMP STORAGE: 81.05- BOTTOM: 72.75 TOB: 82.75 WATER TRANSFER � �SHWT:77.75 EXISTING LAGOON FB:85.00 27518B TOP OF TEMP STORAGE: 84.30 BOTTOM: 73.00 TOB: 86.00 SHWT: 80.00 120 110 EE 70 .1] CHAMILTON 8/22/2024 11:32:51 AM R:\200599\06-DRAWINGS\CIVIL\AlK\REGISTER-CLUSTER 1\AFO PERMIT DRAWINGS\27018 RHETT ENTERPRISES AFO PERMIT.DWG