Loading...
HomeMy WebLinkAbout090045_strucural insepction_202408120 Division of Water Resources ❑ Division of Soil and Water Conservation ❑ Other Agency Facility Number: 090045 Facility Status: Active Permit: AWS090045 ❑ Denied Access Inspection Type: Structure Evaluation Inactive Or Closed Date: Reason for Visit: Follow-up County: Bladen Region: Fayetteville Date of Visit: 08/12/2024 Entry Time: 10:45 am Exit Time: 11:00 am Incident #: Farm Name: Fox Bay Farm Owner Email: Owner: Bk2 Farms LLC Phone: 910-876-1680 Mailing Address: 4912 NC Hwy 87 W Elizabethtown NC 28337 Physical Address: 8361 Center Rd Bladenboro NC 28320 Facility Status: ❑ Compliant 0 Not Compliant Integrator: Murphy -Brown LLC Location of Farm: Latitude: 34' 35' 24" Longitude: 78' 49' 02" From Tar Heel, S on NC 131, 3.8 miles. Rt (SW )on Marsh Rd (SR 1101) across NC 41. Continue on Marsh Rd 2.9 miles farther. Rt (SW) on Center Rd (SR 1100) 1.1 miles to entrance rd. East approx. 0.5 miles Question Areas: Waste Col, Stor, & Treat Certified Operator: Operator Certification Number: Secondary OIC(s): On -Site Representative(s): Name Title Phone On -site representative Byron Melvin Primary Inspector: Inspector Signature: Secondary Inspector(s): Diane Harrison Inspection Summary: DWR staff checked on status of lagoon Phone: Date: Page 1 of 2 Permit: AWS09004� Owner: Bk2 Farms LLC Facility Number:090045 Inspection Date:08/12/24 Inspection TypeStructure Evaluation Reason for Visit:Follow-up Waste Structures Effective Built Closed Designated Observed Type Identifier Date Date Date Freeboard Freeboard Lagoon LAGOON 1 05/12/2005 31/25/1996 19.00 12.00 Lagoon LAGOON 2 01/02/2009 1 19.00 10.00 Waste Collection, Storage & Treatment 4. Is storage capacity less than adequate? If yes, is waste level into structural freeboard? 5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ larc trees, severe erosion, seepage, etc.)? 6. Are there structures on -site that are not properly addressed and/or managed through a waste management or closure plan? 7. Do any of the structures need maintenance or improvement? 8. Do any of the structures lack adequate markers as required by the permit? (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or improvement? Yes No NA NE ■❑❑❑ ■❑❑❑ ❑■❑❑ ■❑❑❑ ❑■❑❑ ❑■❑❑ Page 2 of 2