HomeMy WebLinkAbout820044_5 and 30 day POA_20240809PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82.44 County: Sampson Facility Name: Baggett & Sons Certified Operator Name: Gary Baggett Operator Number: AWA18344 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: Spiliway(Y or N): Level(inches): 2. Check all applicable items 10 X_ Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that 1 have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Gary Baggett Phone: 910-385-5923 Facility Owner/Manager (print) w r -ot- Date: 8l9/2024 Facility ot ner/Ma (signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 2. Structure ID: Lagoon 2 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n.lines 1+2+3+4+5+6= line m = 1821.3 lb PAN line m = 1711.5 lb PAN line m = D PAN line m = lb PAN line m = lb PAN line m = lb PAN 3532.8 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BF APPI IFn nl IRndr: Tlals an nev orolnn O. tract # p. field # q. crop r. acres S. remaining IRR 2 PAN balance (Ib/acre) t TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s U. application window' 1 Sorghum 4.60 128.40 590.6 April -Sept 15 2A Bermuda 0.70 121.60 85.1 Mar -Sept 2B Bermuda 1.40 121.00 169.4 Mar -Sept 3 Bermuda 4.70 118.40 556.5 Mar -Sept 4 Bermuda 1.40 198.30 277.6 Mar -Sept 9 Bermuda 2.60 148.70 386.6 Mar -Sept 10 Soybeans 5.30 49.80 263.9 April -Sept 15 11 Soybeans 4.40 51.10 224.8 April -Sept 15 12 Soybeans 5.30 46.10 244.3 April -Sept 15 AH Soybeans 16.50 132.90 2192.9 April -Sept 15 State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4991.8 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 3532.8 lb. PAN PoA (30 Day) 2121/00 x. Crop's remaining PAN balance (line v from section III) = 4991.8 lb. PAN y. Overall PAN balance (w - x) _ -1459 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pumIthe' haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new P based on new information. If new fields are to be included as an option for lowering lagoon level, add th fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled another permitted facility, provide information regarding the herd population and lagoon freeboard levels receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. facility is being depopulated now. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Lagoon 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 5.0 inches 20.4 inches 15.4 inches 73500 ftz 705551 gallons 180 days g. volume of waste produced according to structural design 96925.7 ft' h. current herd # 2940 certified herd # 2940 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 4/23/2024 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 96926 ft' Oft? 42875 ft3 174285 gallons 2.07 Ibs/1000 gal. 1821.3 lbs. PAN PoA (30 Day) 2/21/00 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n.lines 1+2+3+4+5+6= o. line n / 27154 = Lagoon 1 Lagoon 2 line I = 329613 gallons line I = 120677 gallons line I = gallons line I = gallons line I = gallons line I = gallons 450291 gallons 16.58 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD''2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. traot # q. field # r. soil type s. crop t, acres u. remaining IRR-2 PAN balance (Ib/acre) v. maximum application rate (inthr) w. maximum application amount (inches) 9H NoA Soybeans 9.58 136.5 5 1 5 NoA Bermuda H 0.40 299 0.5 1 6 NoA Bermuda H 1.30 299 0.5 1 x. total acres available during 5 day draw down (sum of column t) = 11.28 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE PoA y Da 2/ fine0o- 1.47 inches per acre to be applied within 5 days l5 y) line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd radurfinn nntinnc th farm now. Should be completly depop'd by tomorrow. to 1. Describe moisture conditions of fields? (e.g. Is there water standina in field: dope im,,ti n rates per irrigation event; cnanges mane in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to PoA (5 Day) 2/21/00 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Lagoon 1 -—1 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period I. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # U certified herd # 2940 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h+ i +j) x 7.48 x 5 days/line f= 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 5.0 inches 12.0 inches 7.0 inches 73500 ftz 320705 gallons 180 days 96925.7 W W f�W �� 42875 W 8908 gallons 329613 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00