HomeMy WebLinkAbout780032_30 day POA_20240809PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 78-32 County: Robeson
Facility Name: Marshall Willoughby
Certified operator Name: Marshall Willoughby Operator Number: 18208
t. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways_
Lagoon Name/U
Spillway(Y or N):
Level(inches):
Lagoon t Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
f
N
2_ Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges_
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the AWO prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
"Attach a complete schedule with corresponding animal units and dates fro depopulation
11 animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3_ Earliest possible date to begin land application of waste: 8112124 Weather permitting.
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Marshall Willoughby Phone: 910-740-9077
FacilityOwner]Manager (print)
` ��� Date: 8/912024
11 ` Facility Owner/Manager (signature)
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Namelldentifier (ID): I Marshall Willoughby
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker
17.0 inches
b. designed 25 yrI24 hr. storm & structural freeboard
19.0 inches
c. line b - line a (inches in red zone) =
2.0 inches
top of dike surface area according to design
d. (area at below structural freeboard elevation)
96416 ft2
e. line G12 x line d x 7.48 gallons/W
120199 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
180 days
g. volume of waste produced according to structural design
145388.5 ft3
h. current herd # 4410 certified herd # 4410
actual waste produced = current herd # x line g =
145389 ft'
certified herd #
i, volume of wash water according to structural design
I`-1 ft3
L
1. excess rainfall over evaporation according to design
59669.2 ft'
k. (lines h + i + j) x 7.48 x 30 daysAne f=
255639 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 6123 22 2-4
1.88 lbs11000 gal.
m. ((lines e + k)11000) x line I =
707 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
a..
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure 10:
2. Structure ID:
3. Structure ID:
4. Structure ID
5. Structure ID:
6. Structure ID:
1
line m =
706.6 lb PAN
line m =
lb PAN
line m
Ib PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
n. lines 1 + 2 + 3 + 4 + 5 + 6 = 706.6 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
oeolnn tin Ur%r 1 ICT Mr-1 ne Tr%wulr`LI PAN rANNnT RI: APPI wn P111RING THIS 30 DAY PERIOD.
o. tract #
p_ field #
q. crop
r. acres
S. remaining IRR
2 PAN balance
(lblacre)
L TOTAL PAN
BALANCE FOR
FIELD (Ibs_)
Column r x s
u application window'
2590
7
Bermuda Hay
3.10
251.97
781.1
MAR-SEP
2590
4
Bermuda Hay
4.82
188.06
906.4
MAR-SEP
V. 101al rAN aVallaUlt! LLW All Iltalua Lnuru yr i.vw nay J —
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) _
x. Crop's remaining PAN balance (line v from section Ill) _
y. Overall PAN balance (w - x) =
706.6 Ib. PAN
797�.6 lb_ PAN
WU Ib. PAN
Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Self reported to DWR on 819124.