Loading...
HomeMy WebLinkAbout780032_30 day POA_20240809PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 78-32 County: Robeson Facility Name: Marshall Willoughby Certified operator Name: Marshall Willoughby Operator Number: 18208 t. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways_ Lagoon Name/U Spillway(Y or N): Level(inches): Lagoon t Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 f N 2_ Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges_ X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the AWO prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulation 11 animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3_ Earliest possible date to begin land application of waste: 8112124 Weather permitting. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Marshall Willoughby Phone: 910-740-9077 FacilityOwner]Manager (print) ` ��� Date: 8/912024 11 ` Facility Owner/Manager (signature) 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentifier (ID): I Marshall Willoughby 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yrI24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 2.0 inches top of dike surface area according to design d. (area at below structural freeboard elevation) 96416 ft2 e. line G12 x line d x 7.48 gallons/W 120199 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 145388.5 ft3 h. current herd # 4410 certified herd # 4410 actual waste produced = current herd # x line g = 145389 ft' certified herd # i, volume of wash water according to structural design I`-1 ft3 L 1. excess rainfall over evaporation according to design 59669.2 ft' k. (lines h + i + j) x 7.48 x 30 daysAne f= 255639 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 6123 22 2-4 1.88 lbs11000 gal. m. ((lines e + k)11000) x line I = 707 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) a.. II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure 10: 2. Structure ID: 3. Structure ID: 4. Structure ID 5. Structure ID: 6. Structure ID: 1 line m = 706.6 lb PAN line m = lb PAN line m Ib PAN line m = lb PAN line m = lb PAN line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 706.6 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN oeolnn tin Ur%r 1 ICT Mr-1 ne Tr%wulr`LI PAN rANNnT RI: APPI wn P111RING THIS 30 DAY PERIOD. o. tract # p_ field # q. crop r. acres S. remaining IRR 2 PAN balance (lblacre) L TOTAL PAN BALANCE FOR FIELD (Ibs_) Column r x s u application window' 2590 7 Bermuda Hay 3.10 251.97 781.1 MAR-SEP 2590 4 Bermuda Hay 4.82 188.06 906.4 MAR-SEP V. 101al rAN aVallaUlt! LLW All Iltalua Lnuru yr i.vw nay J — IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) _ x. Crop's remaining PAN balance (line v from section Ill) _ y. Overall PAN balance (w - x) = 706.6 Ib. PAN ­797�.6 lb_ PAN WU Ib. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Self reported to DWR on 819124.