HomeMy WebLinkAbout820432_30 day POA_20240809PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
Facility Name:
82-432
McPhail Farms
Certified Operator Name: Ray Mc Phail
County: Sampson
Operator Number: 25258
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name11D:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
1
N
16
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 8/10/24 Weather permitting.
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Thomas Ray McPhail Phone: 910-214-4093
Facility Owner/Manager (print) �I
�m2C- e `� 7�A:;_ � Date: 8/g/2024
Facility Ow er/Manager (signature)
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 1 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 16.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 3.0 inches
top of dike surface area according to design
d. (area at below structural freeboard elevation) 43560 ftZ
e. line c/12 x line d x 7.48 gallons/ft' 81457 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 40880 ft3
h. current herd # 5580 certified herd # 5580
actual waste produced = current herd # x line g = 40880 ft'
certified herd #
i. volume of wash water according to structural design Oft3
j. excess rainfall over evaporation according to design 25410 ft3
k. (lines h + i +j) x 7.48 x 30 days/line f= 82642 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 6/14/2024 1.66
m. ((lines e + k)/1000) x line I = 272 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE
STRUCTURES FOR FACILITY
1.
Structure ID: 1
line m = 272.4 Ito PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 272.4lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
10497
F2-1
Bermuda -Graze
3.56
145.32
517.3
MAR-SEP
10497
F2-2
Bermuda -Graze
3.84
147.22
565.3
MAR-SEP
v. I otal PAN avaname Tor all Clews; (sum of column t)
IV. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) _
x. Crop's remaining PAN balance (line v from section III) _
y. Overall PAN balance (w - x) =
1 JbZ. / In. PAN
272.4 lb. PAN
1082.7 lb. PAN
7810 lb. PAN
y must show as a deficit. If line y does not show as a deficit, list course of action here including pump anc
depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
d on new information. If new fields are to be included as an option for lowering lagoon level, add these
s to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
ier permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
ving facility.
Self reported to DWR on 8/8/24.