HomeMy WebLinkAbout090137_routine_20240723`- q=Pc-o 1�. -
"elDivision of Water Resources
Facility Number 7, 0 Division of Soil and Water Conservation
0 Other Agency
Cype of Visit: EMompliance Inspection O Operation Review O Structure Evaluation O Technical Assistance
teason for Visit: (DIfo—utine O Complaint O Follow-up O Referral O Emergency 0 Other 0 Denied Access
Date of Visit: C Arrival Time: t Departure Time: County: Region:V;P_�
Farm Name: &A /=,O� rat p2 J— 3 Owner Email:
Owner Name: �1—JA5Z zkn, _4s_ Phone:
Mailing Address:
Physical Address:
Facility Contact:
Title:
f Phone:
—d
Onsite Representative: �� Integrator:
Certified Operator: ��� �/,�G.� Certification Number:
Back-up Operator:
Location of Farm:
Design Current
Swine, Capacity . °Pop.
Wean to Finish
Wean to Feeder
eederto Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Certification Number:
Latitude:
Design Current,
Wet Poultry Capacity Pop.
LayerI I ::::]
Non -Layer
Design Current
Dry Poult`ry Capacity. Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
Design Current
Cattle Capacity 'Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
["Yes ❑ No ❑ NA ❑ NE
Q'Qes
❑ No
❑ NA
❑ NE
❑ Yes
20 o
❑ NA
❑ NE
�1'e's
❑No
❑NA
❑NE
❑ Yes
[i]'No
❑ NA
❑ NE
❑ Yes
D-No
❑ NA
❑ NE
Page I of 3 511212020 Continued
Facility Number: -LIZ Date of Inspection: ..
Waste Collection & Treatment
N
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
E
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
[:]Yes
❑ No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
[�o
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
[]"No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environmental
threat, notify DWR
7. Do any of the structures need maintenance or improvement?
[—]Yes
[E]'�Io
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
: o
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
L2rles
No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
L�J o
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes Q�io ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ -Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s): Z 7e- ZC=1--
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ERIr10 ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? [:]Yes ®'1Go ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
2j'�Io
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
�o
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
[:]Yes
CTNo
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
Q<o
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑ Checklists [:]Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑-No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [j NTo o ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
OZOZ/ZI/S
£f'O £ a-Qvd
L'1Qsz'4 —Q/� :auogd
oinluuOiS ao;oadsul/zannaina-I
oT,uv j ao;oodsuI/.iannarna-j
�ht .J� -��sa�eZ�J�
�.� � ,�,,�� Joy f ,.�•��s��-� ��,�d �� �; -..�ovp ����
7 7r
•(naussaaau su saaua inuoi;ipps asn) suoa;un;is ulujaxa la;;aq o; AIII!njjo Oulmuap asn
s;uatumoa gag;o fuu ao suol;upuauiuioaa c IuuoiI!ppu Suu io/pue saumm SaA Suu uruldxa :(# uoi;sanb o; aa;ax) sluatuLUODI
gx ❑
dN ❑
oN ❑
so.&.0
&ouai?u omus oqj Xq;isin dn-nnollod u onnbai Xjijiou.I au; sooQ -tE
gN ❑
dN ❑
qL2
soA ❑
6ani;u;u3sazdoi a;is-uo uu q;inn uoi;oodsui/maini ssnosip of Ilu3 zoloodsul/.:an oun1 aql PIQ 'EE
gN ❑
vN ❑
ob�_0
s3A ❑
�dWMVD .:o Iiuuad oq; jo aoumIdwoo-uou asnuo goignn pa;ou swolgojd luuoi;ippu ,tut, onAk -ZE
:zaq;o ❑ puod a&,zo;S/uooBu-I ❑ plaid uoi;uoilddV ❑
am ❑
vN ❑
off❑
sak ❑
-molaq xoq a;uudoiddu oq; }joago `soXjj 4,Cl11joud aq;;u Isixo sumip all; oozjznsgns oQ -IE
(uoijuoijddu-.iano `swolgo:d piuogaa.zj `a�?iugosip `•a•i) 41iuuad
gN ❑
yN ❑
�0
sak ❑
oq; Xq pazinbaz su suot;en;is (OUOOJDWO3o oogjo juu0120-d aLp X3llou oI IiuJ f4illou3 all PiQ '0E
Gila;uipauuui ani;u;uasa:dai S4iluna TiV luuoi�30.1 z;ouluoo `saX JI
gN ❑
`dN ❑
oNZ
sak ❑
Luzaouoo Cltlunb iiu zo zopo uu asod fqiliou3 age pip uoi;oadsui aq;jo auii; aq;;d '6Z
Lluuuou uuq; zagfiq onmjuq; solar X111upoui liodai puu
ax ❑
dN ❑
>21
soA ❑
;uouznoop zo/puu sinoq tZ q;lnn sluuiiuu puap jo asodsip Xljodo:d of Iiuj /4111ouj aq; piQ -SZ
sanssl .aaq;O
gN ❑ dN ❑ >—u soA ❑ zuopuagijlao (I Vjj) s;uawssmsu ssol sruogdsogd u aznoas o; Iiuj fiiliouj oq; piQ 'LZ
ax ❑ dN ❑ ol�l�i sak ElLa�augo ui lo;uzado pagiIJao Clan►;au uu Jo uot;u;uauznoop apinozd o; Iiup �jjjmj aq; piQ '9Z
�" mmildwoo-uou Oui;uoipui Scums Iszg jo olup put, (s)azn;otuis;s17
u002ul Xuu ui slanal o2pnls;umjduzoo-uoX
sjanaj oBpnjs zoj dOd u dolanap of aznjiuA Xanans o2pnjs junuuu a;aldwoo o; oinilu3 El
•nnoloq (so)xoq oluizdoiddu aqp
gN ❑ dN ❑ oN ❑ sa� 3joogo `sofjj �ai?pnjs o; pa;ulaz suoi;ipuoo;iuuod Ll;inn aoueilduzoo jo Ino ,�4lliouj oq; sI -gZ
gN ❑ dN ❑ oN sa,& ❑ LIiuuad aqI Xq polinbaa su Iuowdinba uot;uoilddu a;sum a;u:gituo o; Iiu.I ?�illouj aq; PIQ 'tiZ
:uoi;aadsu13o a;uQ - :.iagmnm �giau�