HomeMy WebLinkAbout820056_Routine_20240723ivision of Water Resources
Facility Number ®- ® 0 Division of Soil and Water Conservation
0 Other Agency !w`
Type of Visit: ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: GHZo-utine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: Departure Time: County: Region
Farm Name: ,,� h .�/ yg Alip Owner Email:
Owner Name: L,�� �'����"�%p,,/ Phone:
Mailing Address:
Physical Address:
Facility Contact: �j � P&x/ Title: % �j �� 1. Phone: /
Onsite Representative: r mil! Integrator: sue„ ' �J
Certified Operator: ell ►` I i — i ? -7:;-, fit, Certification Number: Al 14�xg!"
Back-up Operator:
Location of Farm:
Latitude:
Certification Number:
Longitude:
Design Current _ .i Design Current Design Current
Swine Capacity„ Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
W n to Finish
can to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
FT
DischarLyes and Stream Impacts
Layer
Non -Layer
Design Current
Dry Poultry Capacity Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
1. Is any discharge observed from any part of the operation?
❑ Yes
2 j o
❑ NA
❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
❑ Yes
❑ No
❑ NA
❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes
❑ No
❑ NA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑ Yes
❑ No
❑ NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes
,E115o
❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
Facility Number: - �• Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes
a. If yes, is waste level into the structural freeboard? ❑ Yes
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5
Identifier:
Spillway?: _
Designed Freeboard (in): _
Observed Freeboard (in): _
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
E o ❑ NA ❑ NE
❑No ❑NA ❑NE
Structure 6
❑ Yes �No ❑ NA ❑ NE
❑ Yes EKo ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [�No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require Yes ❑ No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): %��p/f�cic✓� �r-�
13. Soil Type(s): (36)_T
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
es
❑ No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
[ No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
[�lo
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
E3<o
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
❑�J o
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checldists ❑Design ❑ Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes
[2-N-o—
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes
[�]iQo
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes
L j <o
❑ NA
❑ NE
Page 2 of 3 511212020 Continued
Facility Number: - ,�`p Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [3No
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes Ea -No
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes E? No
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes E? No
❑NA ❑NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
0 Yes
Ealro ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
Io ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
� 1 o ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
ETNo ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
E]-No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
[a -No ❑ NA ❑ NE
VsCq,nM_Ane0ts'(refer to: question *): Explain any -YES answers and/or any additional,;recomn endations or any other comments.
drawings,af, facilityato Better explain situations (use additional pages as necessary).
cLl
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
Phone:
M
Date: 2 :1-;7-3 r�{
511212020