HomeMy WebLinkAbout820612_routine_20240801Division of Water Resources
Facility °Number ®°°- d 0 Division of Soil and Water Conservation
0 Other Agency
Cype of Visit: IR Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
teason for Visit: )�) Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: 't Departure Time: E_______1 County: Sam S
Farm Name: gtn j e -Few Owner Email:
Owner Name: (I; �, f-eyP_ Iq- w Phone:
Mailing Address:
Physical Address:
Facility Contact: L Title: Ch Cf-2C Phone:
Onsite Representative: I V-P14 Q 0 N LAA UN Integrator:
Certified Operator: IL;tp-ye Certification Number:
Back-up Operator:
Certification Number:
Location of Farm: Latitude: Longitude:
Design Current
;Swine. ^ Capacity ° Pop.,
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Design Current
Wet Poultry Capacity Pop.
Layer
Non -Layer
Design Current 4
Dry Poultry Capacity Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Region: 'F�0
Design Current
Cattle Capacity Pop;
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes V No ❑ NA ❑ NE
❑ Yes D� No ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
❑ Yes P No ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
Page I of 3 511212020 Continued
Facility Number: jDate of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No
a. If yes, is waste level into the structural freeboard? ❑ Yes No
Structure 1
Identifier:
i
Spillway?:
No
Designed Freeboard (in):
Observed Freeboard (in):
Jpt
Structure 2 Structure 3 Structure 4
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
❑ NA ❑ NE
❑ NA ❑ NE
Structure 5 Structure 6
❑ Yes No ❑ NA ❑ NE
❑ Yes Q No ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [)No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes V No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s): I N b
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �] No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes k] No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes n No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
❑ Yes [Sj No ❑ NA ❑ NE
❑ Yes 'K] No ❑ NA ❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes �] No ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes Q No ❑ NA ❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes] No
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No
❑NA ❑NE
❑ Weather Code
❑ Sludge Survey
❑ NA ❑ NE
❑NA ❑NE
Page 2 of 3 511212020 Continued
Facility Number: jDate of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes )0 No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes 0 No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ' rj�] No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes � No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
KA No
❑ NA
❑ NE
If yes, contact a regional Air Quality representative immediately.
<
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes]
No
❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, over -'application)
`
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
No
❑ NA
❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
[P No
❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
No
❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
No
❑ NA
❑ NE
Farm IpoKC 900d,
irCorN .W{�r � pN
APP,bold /
eJ�sJ2�
qV
�Qf�Tdl)
Reviewer/Inspector Name: Kabz f l Jt- l®I Phone: I I _I_ Mb 1l
Reviewer/Inspector Signature: /�1/— Date:`1
Page 3 of 3 511212020
Division of Water Resources
Facility Number"-,.",, 0,Division of Soil and,Water Conservation,
Q Other Agency
Type of Visit: P Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: S 0 Arrival Time: Departure Time: County:�(M EGO Region:
i
Farm Name: i r 01 e�, Owner Email:
Owner Name: 0 hOr)ie Phone:
Mailing Address:
Physical Address:
Facility Contact: �jq �� CK 611 . Title: C� 1 ca L Phone:
Onsite Representative: �L�I Iy U� Integrator:
Certified Operator: f I I R- Certification Number:
Back-up Operator:
Location of Farm:
Latitude:
Certification Number:
Design, Current, Design Current
Swine Capacity Pop.Wet Poultry "Capacity Pop.
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Layer
Non
-Layer
Design Current
Dry Poultry Capacity Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field [ Other:
a. Was the conveyance man-made?
Longitude:
F1 V
Design. Current
Cattle-` �:a Capacity °, iPop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Yes ❑ No ❑ NA ❑ NE
I& I-
❑ Yes No ❑ NA ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes [ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
❑ Yes
X No
❑ NA
❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
❑ No
❑ NA
ONE
Page-1 of 3 511212020 Continued
Facility Number: - Date of inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
No
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
M No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier:
Spillway?: wo
Designed Freeboard (in):_
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
[�] No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental
threat,
notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
] Yes
❑ No
❑ NA
❑ NE
maintenance or improvement?
/D
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes]
No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
No
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge
into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application
Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
ly No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
1� No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
No
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑ Checklists [:]Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes Q No
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No
❑ NA ❑ NE
❑ Weather Code
❑ Sludge Survey
❑ NA ❑ NE
❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: jDate of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 1� No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check [:]Yes C� No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
No
❑ NA
❑ NE
❑ Yes
No
❑ NA
❑ NE
❑ Yes
[V No
❑ NA
❑ NE
❑ Yes N No ❑ NA ❑ NE
❑Yes [�No ❑NA ❑NE
[:]Yes N No ❑ NA ❑ NE
[—]Yes �j No
❑ Yes NJ No
❑ Yes � No
❑ NA ❑ NE
❑ NA ❑ NE
❑NA ❑NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
q _ f 9t house_ i leoKm J, wacte was fiouumq
c1 c �aCK, thf_s and Send dwK 0�paIf_
1��5-�e ��1� nnf I������ "��,e �roeeif�,
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
out Of
Piaure S,
ig✓
AV000
Slvdq-e q122j23
C01 i br(Uf DN
W fit
Phone: 11 T M(0. q 11 r
Dater ?
511212020
Page 3 of 3