HomeMy WebLinkAboutNC0036919_Email_20240916 (2) United States Environmental Protection Agency Form Approved.
EPA Washington,D.C.20460 OMB No.2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NCO036919 111 121 24/09/12 I17 18 LC]I 19 I G I 201 I
21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
67 70LJ 71Ity 72 L-J 73 1 74 79 I I I I 80
Section B: Facility Data
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 09:55AM 24/09/12 21/08/01
New Hope Church of Christ WWTP
142 Swamp Rd Exit Time/Date Permit Expiration Date
Pantego NC 27860 10:33AM 24/09/12 24/11/30
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
Steven Randall Merrill/ORC//
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
Hallas H Boyd,PO Box 3 Pantego NC 278600003//252-943-5093/
No
Section C:Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations&Maintenar Records/Reports
Self-Monitoring Progran 0 Facility Site Review Pretreatment Multimedia
Effluent/Receiving Wate
Section D: Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
James Elmore Docusignedby* DWR/WAROWQ/252-946-6481/ 9/12/2024
BE91 DAD5DDC64C5...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
Raw T"" DEQ DWR WQRos 2529483921 9/16/2024
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete.
Page# 1
NPDES yr/mo/day Inspection Type (Cont.) 1
31 NCO036919 I11 12I 24/09/12 117 18 i c i
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On 09/12/2024, James Elmore and Breann Spencer of the Division of Water Resources conducted a
compliance inspection of the New Hope Church of Christ WWTP.
The July 2024 and March 2024 eDMR's were spot checked for accuracy, with no discrepancies
found. The ORC informed that he has been unable to record influent sampling results on the eDMR
for over a year, and has contacted several people regarding the issue. Despite not reporting influent
results on the eDMR, the influent is still being sampled and tested per the NPDES permit.
The current permit is set to expire on November 30, 2024. A renewal application has been submitted
and the existing permit will remain effective until a new permit is issued.
The current ORC has started and kept up an ORC visitation log, which was not present during the
last inspection.
The facility is deemed Compliant with NPDES permit NC0036919.
Page# 2
Permit: NCO036919 Owner-Facility: New Hope Church of Christ WWTP
Inspection Date: 09/12/2024 Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? ■ ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ■ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new ■ ❑ ❑ ❑
application?
Is the facility as described in the permit? ■ ❑ ❑ ❑
#Are there any special conditions for the permit? ■ ❑ ❑ ❑
Is access to the plant site restricted to the general public? ■ ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? ■ ❑ ❑ ❑
Comment: The current permit is set to expire November 30, 2024. A renewal application has been
submitted.
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit? ■ ❑ ❑ ❑
Is all required information readily available, complete and current? ■ ❑ ❑ ❑
Are all records maintained for 3 years (lab. reg. required 5 years)? ❑ ❑ ❑ ■
Are analytical results consistent with data reported on DMRs? ■ ❑ ❑ ❑
Is the chain-of-custody complete? ■ ❑ ❑ ❑
Dates, times and location of sampling ■
Name of individual performing the sampling ■
Results of analysis and calibration ■
Dates of analysis ■
Name of person performing analyses ■
Transported COCs ■
Are DMRs complete: do they include all permit parameters? ■ ❑ ❑ ❑
Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ■ ❑
(If the facility is = or> 5 MGD permitted flow) Do they operate 24/7 with a certified ❑ ❑ ■ ❑
operator on each shift?
Is the ORC visitation log available and current? ■ ❑ ❑ ❑
Is the ORC certified at grade equal to or higher than the facility classification? ■ ❑ ❑ ❑
Is the backup operator certified at one grade less or greater than the facility ■ ❑ ❑ ❑
classification?
Page# 3
Permit: NCO036919 Owner-Facility: New Hope Church of Christ WWTP
Inspection Date: 09/12/2024 Inspection Type: Compliance Evaluation
Record Keeping Yes No NA NE
Is a copy of the current NPDES permit available on site? ❑ ■ ❑ ❑
Facility has copy of previous year's Annual Report on file for review? ❑ ❑ ■ ❑
Comment: There is no paper copy of the NPDES permit onsite, the operator has an electronic
copy of the permit.
Pump Station - Influent Yes No NA NE
Is the pump wet well free of bypass lines or structures? ■ ❑ ❑ ❑
Is the wet well free of excessive grease? ■ ❑ ❑ ❑
Are all pumps present? ■ ❑ ❑ ❑
Are all pumps operable? ■ ❑ ❑ ❑
Are float controls operable? ■ ❑ ❑ ❑
Is SCADA telemetry available and operational? ❑ ❑ ■ ❑
Is audible and visual alarm available and operational? ■ ❑ ❑ ❑
Comment:
Influent Sampling Yes No NA NE
# Is composite sampling flow proportional? ❑ ❑ ■ ❑
Is sample collected above side streams? ■ ❑ ❑ ❑
Is proper volume collected? ■ ❑ ❑ ❑
Is the tubing clean? ❑ ❑ ■ ❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 ■ ❑ ❑ ❑
degrees Celsius)?
Is sampling performed according to the permit? ■ ❑ ❑ ❑
Comment:
Filtration (High Rate Tertiary) Yes No NA NE
Type of operation:
Is the filter media present? ■ ❑ ❑ ❑
Is the filter surface free of clogging? ■ ❑ ❑ ❑
Is the filter free of growth? ■ ❑ ❑ ❑
Is the air scour operational? ❑ ❑ ■ ❑
Is the scouring acceptable? ❑ ❑ ■ ❑
Is the clear well free of excessive solids and filter media? ■ ❑ ❑ ❑
Page# 4
Permit: NCO036919 Owner-Facility: New Hope Church of Christ WWTP
Inspection Date: 09/12/2024 Inspection Type: Compliance Evaluation
Filtration (High Rate Tertiary) Yes No NA NE
Comment:
Disinfection - UV Yes No NA NE
Are extra UV bulbs available on site? 0 ❑ ❑ ❑
Are UV bulbs clean? ❑ ❑ ❑
Is UV intensity adequate? 0 ❑ ❑ ❑
Is transmittance at or above designed level? 0 ❑ ❑ ❑
Is there a backup system on site? ❑ 0 ❑ ❑
Is effluent clear and free of solids? ❑ ❑ ❑
Comment: UV bulbs were recently cleaned as a result of fecal violations in July.
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting? 0 ❑ ❑ ❑
Is flow meter calibrated annually? ❑ ❑ 0 ❑
Is the flow meter operational? 0 ❑ ❑ ❑
(If units are separated) Does the chart recorder match the flow meter? ❑ ❑ 0 ❑
Comment: An inline water meter is used to record flow.
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? ❑ ❑ M ❑
Is sample collected below all treatment units? 0 ❑ ❑ ❑
Is proper volume collected? ■ ❑ ❑ ❑
Is the tubing clean? ❑ ❑ 0 ❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 ■ ❑ ❑ ❑
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type ❑ ❑ ❑
representative)?
Comment:
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑
Are the receiving water free of foam other than trace amounts and other debris? 0 ❑ ❑ ❑
If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑
Comment:
Page# 5
Permit: NC0036919 Owner-Facility: New Hope Church of Christ WWTP
Inspection Date: 09/12/2024 Inspection Type: Compliance Evaluation
Effluent Pipe Yes No NA NE
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, 0 ❑ ❑ ❑
and sampling location)?
Comment:
Page# 6