HomeMy WebLinkAbout20241224 Ver 1_ePCN Application_20240913DW R
Division of Water Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
October 2, 2023 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes No
Is this project a public transportation project?*
Yes No
Change only If needed.
Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or
fuel, including natural gas, diesel, petroleum, or electricity?
Yes No
BIMS # Assigned Version# *
20241224 1
Is a payment required for this project?*
No payment required
Fee received Reviewing Office*
Fee needed - send electronic notification Mooresville Regional Office - (704) 663-1699
Select Project Reviewer*
Mary Plummer:mary.plummer
Information for Initial Review
1a. Name of project:
Intersection Improvements to SR 2025 (Miranda Road & Oakdale Road), SR 2108 (Sunset Road), SR 2040 (Lawing Road) and SR 2041 (Simpson Road) (TIP W-5710X)
1a. Who is the Primary Contact?*
Joel Howard, NCDOT- Division 10
1b. Primary Contact Email: * 1c. Primary Contact Phone:*
jmhoward@ncdot.gov (704)983-4423
Date Submitted
9/13/2024
Nearest Body of Water
Gutter Branch
Basin
Catawba
Water Classification
Ws -IV
Site Coordinates
Latitude: Longitude:
35.323-80.9022
A. Processing Information
Is this project connected with ARPA funding?
Yes No
County (or Counties) where the project is located:
Mecklenburg
Is this a NCDMS Project
Yes No
O
Is this project a public transportation project?*
Yes No
Is this a NCDOT Project?*
Yes No
(NCDOT only) T.I.P. or state project number:
W-571OX
WBS # (?)
44856.1.24
1a. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
1b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number: 14 - Linear transportation
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application? *
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
NCDOT
2b. Deed book and page no.:
2c. Contact Person:
Joel Howard. NCDOT- Division 10
401 Water Quality Certification - Express
Riparian Buffer Authorization
Yes No
Yes No
2d. Address
Street Address
716 West Main Street
Address Line 2
City
Albemarle
Postal / Zip Code
28001
2e. Telephone Number:
(704)983-4423
2g. Email Address:*
jmhoward@ncdot.gov
4. Agent/Consultant (if applicable)
4a. Name:
Anna Reusche
4b. Business Name:
TranSystems
4c.Address
Street Address
One Glenwood Avenue
Address Line 2
Suite 600
city
Raleigh
Postal / Zip Code
27603
4d. Telephone Number:
(919)816-7745
4f. Email Address:*
areusche@transystems.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
Charlotte
7 Prniarf Irlanfifir-afinn
State / Province / Region
NC
Country
USA
2f. Fax Number
State / Province / Region
NC
Country
USA
4e. Fax Number
2a. Property Identification Number:
2b. Property size:
38.4
2c. Project Address
Street Address
Miranda Road and Oakdale Road
Address Line 2
City
State / Province / Region
Charlotte
NC
Postal / Zip Code
Country
28216
USA
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
Gutter Branch
3b. Water Resources Classification of nearest receiving water:
WS-Iv
3c. What river basin(s) is your project located in?*
Catawba
3d. Please provide the 12-digit HUC in which the project is located.
030501011403
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:
Land use in the immediate vicinity of the proposed intersection improvements primarily consists of commercial development interspersed with undeveloped forested areas. Areas further
surrounding the project are residential and commerical.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
0.02
4g. List the total estimated linear feet of all existing streams on the property:
615
4h. Explain the purpose of the proposed project:"
The primary purpose of the proposed project is to improve safety and traffic operations, as the offset intersections contain many conflict points that increase the risk of vehicle collisions
and steep/narrow shoulders that limit safe pedestrian use of the area.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
The proposed pair of single -lane roundabouts will include curb and gutter as well as a sidewalk along the northern side of both roundabouts from Sunset Road (S.R. 2108) to Miranda
Road (S.R. 2025) with eight (8) pedestrian crosswalks in total. The shoulders along other portions of the roundabouts will be built wide enough to accommodate future sidewalks. A
driveway extension is proposed for the Oakdale Post Office along Sunset Road and a driveway at 1827 Lawing Road will be required to be relocated with driveway/street access along
Simpson Road. All roads are currently 2-lane with shoulders/ditches. No access control exists in the current vicinity and access control is not included in project designs. Typical equipment
used for roadway construction will be utilized including track hoes, bulldozers and dump trucks.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes No O Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
SAW-2019-00060
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Robert Lepsic
Agency/Consultant Company: TranSystems (Formerly SEPI)
Other:
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
USACE - 1/30/2019
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries Buffers
Open Waters Pond Construction
2. Wetland Impacts
0
2a1 Reason (?)
2b. Impact type* (?)
2c. Type of W.*
2d. W. name
2e. Forested*
2f. Type of Jurisdicition *
?)
2g. Impact
area
Roadway Fill
L
Bottomland Hardwood Forest
WA
Yes
Both
0.010
acres)
2g. Total Temporary Wetland Impact
0.000
2g. Total Permanent Wetland Impact
0.010
2g. Total Wetland Impact
0.010
2i. Comments:
Roadway fill/channel relocation
3. Stream Impacts
❑
3a. Reason for impact (?)
3b.lmpact type "
3c. Type of impact*
3d. S. name *
3e. Stream Type*
3f. Type of
3g. S. width
3h. Impact
(?)
Jurisdiction*
length*
S1
Channel Relocation/Bank
Permanent
Bank Stabilization
UT to Gutter Branch
Intermittent
Both
61
Stabilization
Average (feet)
(linear feet)
S2
Channel Relocation/Bank
Temporary
Bank Stabilization
UT to Gutter Branch
Intermittent
Both
197
Stabilization
Aveage (feet)
(linear feet)
S3
Roadway Fill
Permanent
Fill
UT to Gutter Branch
Intermittent
Both
4
161
Average (feet)
(linear feet)
3i. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts:
222
3i. Total stream and ditch impacts:
419
3j. Comments:
E. Impact Justification and Mitigation
1. Avoidance and Minimization
3i. Total temporary stream impacts:
197
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
NCDOT requested a detailed delineation of streams and wetlands within the proposed project boundaries prior to finalizing the plan to ensure the
limitation of impacts of the natural environment.
following the delineation, the proposed grading and disturbance limits were shifted in places to minimize impacts to the wetlands and streams. Wetland
impacts have been minimized by steepening fill slopes and elongating erosion control basins where appropriate.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Implementation of NCDOT's Best Management Practices for the Protection of Surface Waters (BMPs) will minimize impacts to water resources during
the preconstruction, construction, maintenance, and repair situations. All project construction activities initiated within jurisdictional streams will be
carried to completion in an expeditious manner to minimize the period of disturbance within the jurisdictional streams. All work will take place during dry
conditions and can be facilitated from high, non -jurisdictional, stable ground. Erosion control devices shall be installed immediately following the clearing
operation.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2c. If yes, mitigation is required by (check all that apply):
D W R Corps
2d. If yes, which mitigation option(s) will be used for this project?
Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
Yes No
4b. Stream mitigation requested:
(linear feet)
4d. Buffer mitigation requested (DWR only):
(square feet)
4c. If using stream mitigation, what is the stream temperature:
4e. Riparian wetland mitigation requested:
(acres)
0.02
Q
4f. Non -riparian wetland mitigation requested:
(acres)
4g. Coastal (tidal) wetland mitigation requested:
(acres)
4h. Comments
6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR
6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information.
Yes No
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
If no, explain why:
The project is located in the Catawba River Basin.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?
Yes No
Comments:
See NCDOT Stormwater Management Plan attached.
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federallstate) land?
Yes No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)?*
Yes No
1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?
Yes No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
3b. If you answered "no," provide a short narrative description.
The primary purpose of the project to improve safety and traffic operations at the existing intersection. No new development is anticipated to occur as a
result of the project.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?
Yes No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?
Yes No
5d. Is another Federal agency involved?*
Yes No Unknown
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
USFWS IPaC, NC NHP and protected species surveys
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
https: //www.fish eries. noaa. gov/resource/map/essenti a I -fish -habitat -map per
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?"
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources? *
A conclusion of No Archaeological Survey Required was reached by NCDOT's Archaeology Group based on a review of HPO maps and GIS data,
historical maps, soil maps and topography for the project study area.
NCDOT's Historic Architecture and Landscapes Group found a conclusion of No Survey Required based on review of HPO quad maps, relevant
background reports, historic designation roster and indexes of properties within the project study area.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? *
Yes No
8c. What source(s) did you use to make the floodplain determination?"
FEMA Floodmaps Panel No. 3710453700K
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
W-5710X_Catawba Tribal Coordination —Concurrence Letter(2_27_24).pdf
283.59KB
W-5710X_Cherokee Tribal Coordination Letter (Signed 1_25_2024).pdf
7.43MB
24-260_Intrsctn Imprvt W-5710X Informal_ MecklenburgCoUSFWS.pdf
139.91 KB
W-5710X_SA_NCSAM_REV08-30-2024.pdf
193.06KB
C-5613L NRTR.pdf
1.42MB
W-5710X_Permit Support Doc.pdf
27.38MB
File must be PDF or KMZ
Comments
Signature
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Joel M. Howard
8
Signature
,77ft A NOWA#P
Date
9/13/2024