Loading...
HomeMy WebLinkAboutDARDAN Impact Table 09-10-24.pdfPage 4 of 10 PCN Form – Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Wetlands Streams – tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 W2 W3 W4 W5 W6 2g.Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 S2 S3 S4 S5 S6 3h. Total stream and tributary impacts 3i. Comments: Land Clearing Bottomland Hardwood Forest Yes Corps 0.05 Yes/No - Yes/No - Yes/No - Yes/No - Yes/No - 0.05 The wetland impacts are proposed for the connection to the preexisting sanitary sewer located on the property. The area will be restored to pre-exisitng conditions. Culvert S-1 INT Corps 3.12 139 S-1 3.12 129 278 T - - - - - Choose one Choose one Choose one Choose one Choose one Choose one Choose one Choose one Choose one Choose one P T - - - - Dewatering Choose one Choose one Choose one Choose one INT - - - - Corps - - - -