HomeMy WebLinkAboutNCC242745_Site Plan or Location Map_20240913 N
N z
4
JS 0 a J
BLANTON RD 2� d a
m
J F-
(3 0 0 z
SITE 2� Q LL J
a
Z B;
-
2 0 0 z
U aw 4.
Z Z 6
0 0 R "
VICINITY MAP / - F- w t
\ La Z J N a
z
0 Q r J o
z � v
Et J a i <
/ W CO / a m
/ 16800100
\
SUPPLY BAPTIST CHURCH I m
1680007606 ZONE:CLD
MORRISON LAURA H USE: CHURCH -
ZONE:CLD \
USE: COMMERCIAL
z
_______L _- —
—
BLANiON RD (SR 1535) In
60' ROW 55 •MPH_ -���
�� o >
_ — •,�.� esl • W
000. —
FABRIC �'=o o:= ._� o
.� 351
NCDOT CLASS A OR B _ "�• 3S1-
•O oo. Q
EROSION CONTROL •o o . ,.• I
STONE _ .4S1 / . •
4"TO 6" #57 • �i / / 1
STONE ON UPSTREAM\ _�.���,� ?
FACE \.,-rr'��1•��1� •7 ` li
FILTER I'�f1•��, �, le,
/ \r`rF ® DIVERSION #1 DIVERSION //2 • /`
FABRIC .,`erip •dir /y �1. N F .',\ - --'�
.4. .1WW/6,� •4 I• • a _
SECTION A—A TEMPORARY ��
STONE CHECK DAM N.NN
�. SEDIMENT BASINf I 1� / Z
STONE CHECK DAM MAINTENANCE: / /
INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY ANS / ` -- 7' ' • 4
AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL �.
EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, / _ r,
WH11
LIMEN NEEDEDS, OR .
DEBRIS THAT COULD CLOG THE CHANNEL \,® TsT POROUS BAFFLES �� 16800098 U
N SEE DETAILtti BRUNSWICK COUNTY W J
ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK ZONE:CLD I.
DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF �o • USE: COMMERCIAL LLI
THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT �1
EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN NI. • 7LLOBE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIPRAP LINER 1680007604 LIN THAT CHANNEL. \ SIMPSON DONALD R \ .. U
ZONE:CLD sF
REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS N. USE: COMMERCIAL N / r n LL• Q Q
NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW / u
AND PREVENT LARGE THE CHANNEL TO DRAIN
FLOWS THROUGH
ROM CARRYINGE CHECK DAM,
SEDIMENT OVER / \ �I O CL
THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAINN.
W C' Q
DESIGN HEIGHT AND CROSS SECTION. / Z LL U U
/ ci.
H S CD W
N. / 3" OUTLET PIPE 'n
10'x10'x1' RIP �C. 4�, ATTACH SKIMMER r LLI i1 w0
s N. PER DETAIL UJ a w z^o
O RAP ENERGY ��'� o Q
Gw,o DISSIPATER
N ornw
'1'C;7&A, / 7l L.L U J
IV
N / /�/ N LW W J _WI-
-'1--,.?4)
I
U
CONSTRUCTION SEQUENCE \ �w// I
1. SCHEDULE PRE—CONSTRUCTION MEETING WITH DEQ—DEMLR WILMINGTON // Q
ONGITHE SITE
UPON THE COMMENCEMENT OF & DISTURBED ACTIVITIES GS/ \ H
2. INSTALL GRAVEL CONSTRUCTION ENTRANCE N. zo / ❑
sa0007soa0
3. INSTALL TEMPORARY SILT FENCE — IF REQUIRED / , // CAMPBELL BROTHERS INVESTMENTS LLC \
4. BEGIN CLEARING & GRUBBING \ e// ZONE:OLD ,(
5. EXCAVATE DIVERSION DITCHES TO CHANNEL FLOW TO SEDIMENT BASIN USE: VACANT N �l
6. CONTINUE CONSTRUCTION N / // W
7. STABILIZE & SEED DISTURBED AREAS '- /
8. MAINTAIN INLET PROTECTIONS & ALL OTHER ASPECTS MENTIONED IN I
APPROVED SEDIMENTATION & EROSION CONTROL PERMIT
-V-O' MIN.r #24-047
DATE: 07/03/24
DESIGN: TUG
' t. FLOw DRAWN: TJS
. • .. .. :. • III- `,111111111/,, - .,
i- - l-n-n-n- _- -n-r 1 i-_ 1 I 11 `,,,N C A R,�`',,C
- I11 I-11 I-11 I-11 I-11 I-11-11—III III 11I _ I I HI I 11 c2arbF�s�b m%
IIi11111111111i1111 I1-111-111-111-11L= IIIIIIIIIIIIIIIIIIII IIIII�IIIII�I—iiiIIIIii—iii Ii11111i1—ICI-ICI—ICI— IIIIIiIIII1,III1i, ? l
S I T E DATA LEGEND B�-O"TYPICAL =7.a? `46 °
PARCEL#: 1680007607 -- PROPERTY LINE CHANNEL UNNER NGLE FIBERGLASS ROVING (Sj +� G p•:'�N`
SNE AREA: 1.86 AC 32 DLIST1NG CONTOUR TEMPORARY DIVERSION SWALE F� qS n�SC,`o``
DISTURBED AREA: 77,522 SF/ 1.78 AC - - EX. PROP UNE/ROW NOTES: NTS 0
ZONING: CLD —LOD LODLOD UNITS OF DISTURBANCE 1. THIS PLAN HAS BEEN DEVELOPED FROM INFORMATION TAKEN FROM BRUNSWICK
"` TEMPORARY SILT FENCE COUNTY GIS AND IS TO BE CONFIRMED BY BOUNDARY & TOPOGRAPHIC SURVEY. 0 40 80 120 ^ O
140.001 PROPOSED ELEVATION 2. ANY DEWATERING OF THE SEDIMENT BASIN SHALL OCCUR AT THE DESIGNATED OUTLET , U
p OOOOOd STONE CHECK DAM LOCATION WITH THE USE OF A SILT SACK. SCALE. 1"=40'