Loading...
HomeMy WebLinkAboutNCG551598_ncg551598 CEI letter 2024_20240912 Docusign Envelope ID:2C616379-FD75-4CD2-AAAO-FA6C262E4935 t�E STATE a,.� y ti ROY COOPER Governor ELIZABETH S.BISER Secretary RICHARD E.ROGERS,JR. NORTH CAROLINA Director Environmental Quality September 12,2024 Holt Farley 7313 Kepley Road Chapel Hill,NC 27517-6092 Subject: Compliance Evaluation Inspection Single Family Wastewater Treatment System Facilty address: 7313 Kepley Road Certificate of Coverage NCG551598 Durham County Dear Mr. Farley: On September 6, 2024,Danny Smith from the Raleigh Regional Office of the Division of Water Resources(DWR)visited your single-family residence(SFR)wastewater treatment system to evaluate compliance with the subject General NPDES Permit. This wastewater treatment system is located at 7313 Kepley Road in Durham County,NC. The treatment system is currently permitted to Holt Farley. Our records indicate the wastewater treatment system consists of a septic tank,AdvanTex treatment System,UV disinfection and an outlet pipe. General NPDES Permit NCG550000 and Certificate of Coverage (COC)NCG551598 authorizes this discharge of domestic wastewater from your treatment system to receiving waters designated as unnamed tributary to Little Creek in the Cape Fear River Basin. The subject site visit and file review revealed the following: 1. Pumping the septic tank: Septic tanks should be pumped out approximately every five years or when the solids level is found to be more than 1/3 of the liquid depth in the septic tank compartment,whichever is greater. A pumping company can check the status periodically and determine when pumping is required. The General NPDES Permit requires the permittee to retain records associated with sewage disposal activities for a period of at least S years. It was explained that the septic tank is inspected by contractor and periodically pumped as needed. Please keep records (receipts) of septic tankpumping/solids removal for review during inspection. 2. Disinfection. Your system uses ultraviolet(UV)light for disinfection. Please ensure that you continue to maintain and replace the UV disinfection bulbs, as appropriate,to ensure proper wastewater disinfection. 3. Analyzing the effluent: Part 1. C.,Effluent Limitations and Monitoring Requirements,within General Permit NCG550000 requires a permittee to annually sample and analyze the effluent leaving the treatment system prior to discharge. D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office 1 3800 Barrett Drive I Raleigh,North Carolina 27609 NORTH CAROLINA 919.791.4200 Uapad-11 of E,,kommntel Uual� Docusign Envelope ID:2C616379-FD75-4CD2-AAAO-FA6C262E4935 Holt Farley Compliance Evaluation Inspection-NCG551598 7313 Kepley Road,Durham County Page 2 of 2 Once a year you will need to collect a representative sample of the effluent and have it analyzed by a certified commercial laboratory. If no wastewater flow is observed from your system,please document that information for your records and use during the next system inspection. If you have any questions regarding this matter,please do not hesitate to contact Danny Smith at(919) 791-4248. Note:For your reference, Certified Laboratory listings (see "Commercial In-state listing') can be found at this email address:hgps://www.deq.nc.gov/about/divisions/water-resources/water- sciences/chemistry-laboratory/laboratory-certification-branch/certified-laboratory-listings 4. Discharge outlet location. The permittee is required to conduct a visual review of the outfall location at least twice each year(once at the time of sampling)to ensure that no visible solids or other obvious evidence of system malfunctioning is observed. Any visible signs of a malfunctioning system shall be documented, and steps taken to correct the problem. Please ensure the outlet is always visible/maintained and cleared of vegetation and leaves. Please take the necessary steps to ensure the discharge outlet is visible and accessible. Maintaining the area will allow you to monitor the discharge and to collect effluent samples as required by the permit. 5. Fees.Part II Section B.14 of General Permit NCG550000 requires the permittee to"pay the annual administering and compliance monitoring fee within thirty days after being billed by the Division." A review of the billing records for this facility indicates that the permit annual fee for has been paid. There are no overdue fees. Thank you for attention to these matters. If you have questions, comments about this inspection or the requirements to take corrective action(if applicable),please do not hesitate to contact Danny Smith at 919-791-4248 danny.smith@deq.nc.gov. Sincerely, ESigned by: v�altosa 'e. Nt,atn,U-d Vanessa "Wariuel;Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources,NCDEQ Attachment(s): EPA Water Compliance Inspection Report Cc: Laserfiche D E Q North Carolina Department of Environmental Quality I Division of Water Resources vvvRaleigh Regional Office 13800 Barrett Drive I Raleigh,North Carolina 27609 NORTH CAROLINA 919.791.4200 Depa"mem of Environmental Duality