Loading...
HomeMy WebLinkAbout20080084 Ver 1_Shoreline Stabilization_20080111 The following is an abbreviated application form for those applying fora 401Water Quality Certification to impact FERC (Federal Energy Regulatory Commission) regulated lake shore or bottom under the U.S. Army corps of Engineers Permit GP30. This Application cannot be used for wetland or stream impacts. Please provide seven (7) copies of this application and supporting information as well as a non-refundable application fee to the Division of Water quality of $240.00 for impacts of to lake bottom of less than 1 acre and $475.00 for impacts to lake bottom of greater or equal to 1 acre. Applications should be sent to: Division of Water Quality Wetland Unit 1650 Mail Service Center Raleigh, NC 27699-1650 I. Applicant Information OwnerlApplicant Information ~- ~ ~'_ JAN 1 l 2008 DENk• 1A~1,'~C(ti i~4~~i4 i 1NE'TLANDS NNE :'~?7RMV\`A'-k ~FANCN Name: Stephen C. & Deborah R. Cooper Mailing Address 50009 Fox Road Albemarle, NC 28001 ~,~. Telephone Number: (704) 983-3699 Fax Number E-mail address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affilaition: Mailing Address: Telephone Number: E-mail address: II. Project Information Fax Number Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. You may use the diagram below to make a hand sketch of your project. Also see the example below for guidance. Both the vicinity map and 08-0084 site plan must include a scale and north arrow. The footprints of all buildings, impervious surfaces, or other facilities must be included. 1. Location County: Stanly Nearest town: Albemarle Subdivision name or site address(include phase/lot number) Loch Brae Lot 10 Directions to site please include road numbers, landmarks,etc (This is not necessary if an adequate vivinity map is included) Traveling East on Hwy 27 from Albemarle approx 5.5 miles Turn left on NC 1738 (Strand Road} and immediately slight right on Fox Road 2. Describe the existing land use of the site at the time of this application: Residential home with grass lawn 3. Property size (acres) 48 acre 4. Nearest body of water(stream/river/sound/ocean/lake): Lake Tillery Describe the purpose of the proposed work: Dredge Area for boathouse and deck Build new seawall, boathouse and deck 6. List the type of equipment to be used to construct the project: Excavator and carpentry tools 7. Amount of impact (including all excavation, backfill, rip rap, reatining walls, etc.) below the normal lake pool level in square feet or acres: 680 Square feet 8. a.Amount of impact (including all clearing, backfill, excavation rip rap, reatianing walls, etc.) above the normal pool lake level and 50 feet landward in square feet or acres: 500 Square feet b. Please describe vegetation above the normal pool lake level and 50 feet land- ward to be impacted(number of trees for instance): Fescue sod 9, 2008 Date ~/ + (Agent's signature is valid only if an authorization letter from the applicant is provided) Lake (Full Pond) Dredge area for boathouse and deck 20 feet wide 34 feet out Full Pond Shoreline ^^^^^.^^ • .' Seawall Bads fill w/2" washed stone 2 feet from base Building 2 ' High x 125 feet long seawall Seawall to be constructed of 4"x 4" 8~ 2"x 6" .04 pressure treated lumber Please approximately sketch the following information on this plan (please provide dimensions for each item, such as 10 ft x 100 ft) 1) All proposed vegetation clearing (provide dimensions) 2)Location of rip rap or fill to be placed above the full pond elevation 3)Location of rip rap or fill to be placed below the full pond elevation 4)The location of any proposed structures such as buildings, retaining walls, docks, etc 5)The location of any evacuation or dredging below the Full Pond elevation. • • • 4" Rip Rap 2 to 7 slope in front of wall 6)Location of construction access corriders.