HomeMy WebLinkAboutWQ0044440_Application (FTSE)_20230525 State of North Carolina
DWR
Department of Environmental Quality
Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 06-21 & SUPPORTING DOCUMENTATION
Application Number:, /t�c "t`i 1 0 (to be completed by DWR) RECENEDINC0E01DWR
All items must be completed or the application will be returned MAY 'Z o 2023
I. APPLICANT INFORMATION: WOROS
Hamlet Huntersville, LLC MOORESVILLE REGIONAL.OFFICE
1. Applicant's name: (company,municipality,HOA,utility,etc.)
2. Applicant type: ❑ Individual ❑✓ Corporation ❑ General Partnership ❑Privately-Owned Public Utility
❑ Federal ❑ State/County ❑Municipal ❑ Other
3. Signature authority's name: per 15A NCAC 02T.0106(b) Steve Farmartino
Title: VP Development
4. Applicant's[nailing address: 1921 Gallows Road Suite 700
City: Vienna State: VA Zip: 22182
5. Applicant's contact information:
Phone number: (7a)g.Q?_-5149 Email Address:
II. PROJECT INFORMATION:
1. Project name: Hamlet Huntersville
2. Application/Project status: ❑✓ Proposed(i
If a modification,provide the existing permit numb
For modifications,also attach a detailed nar -cklist.
If new construction,but part of a master plan,provit
3. County where project is located: Mecklenburq
4. Approximate Coordinates(Decimal Degrees):Latitu
01736104
5. Parcel ID(if applicable): (or Parcel ID to clos
III. CONSULTANT INFORMATION:
1. Professional Engineer: Joseph BoulosLicense Number: 047286
Finn: Design Resource Group
Mailing address: 2459 Wilkinson Blvd, Suite 200
City: Charlotte State: NC Zip: 28208-
Phone number: Qa)g43_-0608 Email Address:_Loe@drqrp.com
IV. WASTEWATER TREATMENT FACILITY(WWTF)INFORMATION:
1. Facility Name:Mcdowel Creek WWTP PermitNumber: NCO036277
Owner Name:
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. Pen-nit Number(s): WQ
2. Downstream(Receiving) Sewer Information: inch ❑Gravity ❑Force Main
3. System Wide Collection System Permit Number(s)(if applicable): WQCS
Owner Name(s):
FORM: FTA 06-21 Page ] of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached?
❑Yes ❑No ❑✓ N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement(FORM: DEV)been attached?
❑ Yes ❑No ❑✓ N/A
3. If the Applicant is a Home/Property Owners'Association,has an HOA/POA Operational Agreement(FORM:HOA)and
supplementary documentation as required by 15A NCAC 02T.0115(c)been attached?
❑Yes ❑No ❑✓ N/A
4. Origin of wastewater:(check all that apply):
❑Residential(Individually Owned) ❑Retail(stores,centers,malls) ❑Car Wash
❑✓ Residential(Leased) ❑Retail with food preparation/service ❑Hotel and/or Motels
❑School/preschool/day care ❑Medical/dental/veterinary facilities ❑ Swimming Pool/Clubhouse
❑Food and drink facilities ❑Church
❑Businesses/offices/factories Swimming Pool/Filter Backwash
❑Nursing Home ❑Other(Explain in Attachment)
5. Nature of wastewater: %Domestic 100 %Commercial %Industrial(See 15A NCAC 02T.0103(20))
If Industrial,is there a Pretreatment Program in effect?®Yes[]No
6. Has a flow reduction been approved under 15A NCAC 02T.0114(fl? ❑Yes ❑No
➢ If yes,provide a copy of flow reduction approval letter with this application
7. Summarize wastewater generated by project:
Establishment Type(see 02T.0114(f)) Daily Design Flow 0 No.of Units F1011,
Townhome Units 190 gal/ unit 78 14820 GPD
Pool 10 gal/ person 123 1230 GPD
Single Family lot 190 gal/ lot 187 35530 GPD
gal/ GPD
gal/ GPD
gal/ GPD
Total 51580 GPD
a See 15A NCAC 02T.0114(b), (d) (e)(1)and(e)(2) for caveats to wastewater design flow rates(i.e.,minimum flow per
dwelling;proposed unknown non-residential development uses;public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S.42A-4).
b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified[in table 15A NCAC 02T.01141 shall be
determined using available flow data,water using fixtures,occupancy or operation patterns,and other measured data.
8. Wastewater generated by project: 515gOiPD(per 15A NCAC 02T.0114)
➢ Do not include future flows or previously permitted allocations _
If permitted flow is zero,please indicate why:
❑Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
❑Flow has already been allocated in Permit Number: Issuance Date:
❑Rehabilitation or replacement of existing sewers with no new flow expected
❑ Other(Explain):
FORM: FTA 06-21 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA(If Applicable)-02T.0305&MDC(Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size(inches) Length(feet) Material
8 2272 1> PVC
8 377 DIP
6 62 PVC
➢ Section II&III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305&MDC(Pump Stations/Force Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates(Decimal Degrees):Latitude: Longitude: - °
3. Total number of pumps at the pump station:
3. Design flow of the pump station: millions gallons per day(firm capacity)
➢ This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s)per pump(s): gallons per minute(GPM)at feet total dynamic head(TDH)
5. Summarize the force main to be permitted(for this Pump Station):
Size(inches) Length(feet) Material
If any portion of the force main is less than 4-inches in diameter,please identify the method of solids reduction per
MDCPSFM Section 2.01 C.Lb. ❑Grinder Pump ❑ Mechanical Bar Screen ❑Other(please specify)
6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1):
❑ Standby power source or ❑ Standby pump
➢ Must have automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B);
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C):
❑ Portable power source with manual activation,quick-connection receptacle and telemetry-
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry:
➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage
capacities and the rotation schedule of the portable power source or pump,including travel timeframes, shall be provided
as part of this pen-nit application in the case of a multiple station power outage.
FORM: FTA 06-21 Page 3 of 5
6-//
IX. SETBACKS&SEPARATIONS—(02B.0200& 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations/alternatives found in 15A NCAC 02T.0305(fl&(g)? ®Yes ❑No
15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems:
Setback Parameter* Separation Required
Storm sewers and other utilities not listed below(vertical) 18 inches
2Water mains(vertical-water over sewer preferred,including in benched trenches) 18 inches
'Water mains(horizontal) 10 feet
Reclaimed water lines(vertical-reclaimed over sewer) 18 inches
Reclaimed water lines(horizontal-reclaimed over sewer) 2 feet
**Any private or public water supply source,including any wells,WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water,and associated wetlands. 100 feet
**Waters classified WS(except WS-I or WS-V),B,SA,ORW,HQW,or SB from normal
high water(or tide elevation)and wetlands associated with these waters(see item IX.2) 50 feet
**Any other stream,lake,impoundment,or ground water lowering and surface drainage
ditches,as well as wetlands associated with these waters or classified as WL. 10 feet
Any building foundation(horizontal) 5 feet
Any basement(horizontal) 10 feet
Top slope of embankment or cuts of 2 feet or more vertical height 10 feet
Drainage systems and interceptor drains 5 feet
Any swimming pools 10 feet
Final earth grade(vertical) 36 inches
➢ If noncompliance with 02T.0305(f)or(g),see Section X.1 of this application
*15A NCAC 02T.0305(e)contains alternatives where separations in 02T.0305(f)cannot be achieved.Please check"yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webnase
2. Does this project comply with the minimum separation requirements for water mains? ®Yes ❑No ❑N/A
➢ If no,please refer to 15A NCAC 18C.0906(o for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE,verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? ❑ Yes [—]No [Z]N/A
➢ Please provide supplementary information identifying the areas of non-conformance.
➢ See the Division's draft separation requirements for situations where separation cannot be met.
➢ No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? ❑Yes Basin name: m No
If yes,does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑Yes ❑No
➢ This includes Trout Buffered Streams per 15A NCAC 213.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ®Yes No
or 401 Water Quality Certifications?
➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 02T.0105(c)(6)(additional permits/certifications)? Yes ®No
Per 15A NCAC 02T.0I05(c)(6),directly related environmental permits or certification applications must be being prepared,
have been applied for,or have been obtained. Issuance of this permit is contingent on issuance of dependent permits(erosion
and sedimentation control plans,stormwater management plans,etc.).
7. Does this project include any sewer collection lines that are deemed"high-priority?" ®Yes E]No
Per 15A NCAC 02T.0402,"high-priority sewer"means any aerial sewer,sewer contacting surface waters,
siphon,or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interference/conflict boxes require a variance approval.
If yes,include an attachment with details for each line,including type(aerial line,size,material,and location).
High priority lines shall be inspected by the permittee or its representative at least once every six-months and
inspections documented per 15A NCAC 02T.0403(a)(5)or the permittee's individual System-Wide Collection permit.
FORM: FTA 06-21 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T,the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains(latest version),and the Gravity Sewer Minimum Design Criteria(latest version)as applicable?
❑✓ Yes ❑No
If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued
concurrently with the approval of the permit, and projects requiring a variance approval may be subject to longer
review times.For proiects requiring two or more variances or where the variance is determined by the Division to be a
significant portion of the proiect,the full technical review is required.
2. Professional Engineer's Certification:
1, Joseph Boulos ,attest that this application for Hamlet Huntersville
(Professional Engineer's name from Application Item III.1.) (Project Name from Application Item I1.1)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications,engineering calculations,and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
Minimum Design Criteria for Gravity Sewers(latest version), and the Minimum Design Criteria for the Fast-Track Permitting
of Pump Stations and Force Mains(latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000,as well as civil penalties up to$25,000 per violation.Misrepresentation of the application
information,including failure to disclose any design non-compliance with the applicable Rules and design criteria,may subject
the North Carolina-licensed Professional Engineer to referral to the licensing board.(21 NCAC 56.0701)
:...........................................................
North Carolina Professional Engineer's seal,signature,and date: i �.�`;�N�CA,gO''�,,
:��p4`•• "ssf'' ��'��
S
i 04-7286
�o .F
. Vr423�. o�
S� ..GIN
............................................................
3. Applicant's Certification per 15A NCAC 02T.0106(b):
I, Steve Farmartino ,attest that this application for Hamlet Huntersville
(Signature Authority Name from Application Item I.3.) (Project Name from Application Item II.1)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any _
discharge of wastewater from this non-discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties,injunctive relief,and/or criminal prosecution. I will make no claim against the Division
of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included, this application
package will be returned to me as incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation.
Signature: ----� Date: 5 /7 Z 3
FORM: FTA 06-21 Page 5 of 5
Tuvia, Ori A
From: Steve Farmartino <sfarmartino@livemiddleburg.com>
Sent: Wednesday, May 31, 2023 3:30 PM
To: Tuvia, Ori A;joe@drgrp.com
Subject: [External] RE: Hamlet Huntersville - additional information
CAUTION: External email. Do not click links or open attachments unless verified.Report suspicious emails with the Report Message
button located on your outlook menu bar on the Home tab.
Hey Ori,
We will not be selling lots.These are single family rentals.
I will let Joe jump in for#2.
STEVE FARMARTINO I Vice President, Development
C: 757.802.5149
From:Tuvia,Ori A<ori.tuvia@deq.nc.gov>
Sent: Wednesday, May 31, 2023 3:25 PM
To:joe@drgrp.com
Cc:Steve Farmartino <sfarmartino@livemiddleburg.com>
Subject: Hamlet Huntersville-additional information
Good afternoon Joseph,
I received the subject application however the following items need to be addressed/clarified:
1. Is the developer going to sell the lots? If so an operational agreement will be required
2. On page 4 question 1 was left unmarked.
Sincerely,
Ori Tuvia
Environmental Engineer III
NC DEQ / Division of Water Resources/ Permitting
610 East Center Avenue
Mooresville, NC 28115
Direct Line: (704) 235-2190 Fax: (704) 663-6040
Ori.tuvia(a)deg.nc.gov
..s k�.�x
qu
u
1
State of North Carolina
„ Department of Environmental Quality
F Division of Water Resources
Division of %-Vater *teem—ces Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Design Resource Group
Project Name for which flow is being requested: The Hamlet at Huntersville ' (Residential)
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: McDowell Creek WWTP
b. WWTP Facility Permit#: N00036277
A11 flows are in MGD
c. WWTP facility's permitted flow 12.00
d. Estimated obligated flow not yet tributary to the WWTP 0.520
e. WWTP facility's actual avg. flow 5.217
f. Total flow for this specific request 0.05158
g. Total actual and obligated flows to the facility 5.736
h. Percent of permitted flow used 47.8%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Pump Average Approx. Not Yet Total Current
Station Station Firm Daily Flow** Current Tributary Flow Plus
(Name or Permit Capacity, * (Firm/pf), Avg. Daily Daily Flow, Obligated Available
Number) No. MGD MGD Flow,MGD MGD Flow Capacity***
N/A
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf)not less than 2.5,per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is<0.
Downstream Facility Name (Sewer): Unknown
Downstream Permit Number: Unknown
Page 1 of 2
FTSE 10-18
III. Certification Statement:
1 Keri Cantrell certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any
capacity related sanitary sewer overflows or overburden any downstream pump station en route to the
receiving treatment plant under normal circumstances, given the implementation of the planned
improvements identified in the planning assessment where applicable. This analysis has been performed
in accordance with local established policies and procedures using the best available data. This
certification applies to those items listed above in Sections I and II plus all attached planning assessment
addendums for which I am the responsible party. Signature of this form certifies that the receiving
collection system or treatment works has adequate capacity to transport and treat the proposed new
wastewater.
Digitally signed by Keri B Cantrell
Date:2022.12.12 14:02:22-05'00' 12/12/2022
Adobe Acrobat version:2022.003.20263
Signing Official Signature Date
Chief Engineer
Title of Signing Official
Page 2 of 2
FTSE 10-18
CHARLOTTE
W4JER
December 19, 2022
Mr.Andrey Kravets
Design Resource Group
2459 Wilkinson Boulevard
Suite 200
Charlotte, NC 28208
SUBJECT: WATER AND SEWER FLOW ACCEPTANCE
THE HAMLET AT HUNTERSVILLE
12349 OLD STATESVILLE ROAD, CHARLOTTE, NC 28205
CLTWATER TRACKING#20228100
After an analysis of the sanitary sewer associated with the proposed design of project, 20228100,
THE HAMLET AT HUNTERSVILLE, it was determined that there is sufficient capacity to
accommodate the proposed sewer flow of 51,580 gallons per day(78 units x 190 gpd/unit; 123
people x 10 gpd/person; 187 lots x 190 gpd/lot) at the connection point(s) indicated on the
submitted utility plan for transmission to the McDowell Creek Wastewater Treatment Plant; NPDES
permit number NC0036277, for treatment. This acceptance of flow is based upon the existing
capacity of the designated publicly owned treatments works.
Please see attached NCDEQ-FTSE form.
Charlotte Water (CLTWater) agrees to furnish water to the subject project. The water quality to the
subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water
Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of
NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow.
The applicant should understand that due to the involvement of other agencies and continuing
growth of the water system, the ability to provide service for future projects cannot be guaranteed
nor reserved. Connection to the CLTWater system is accepted on a first come, first served basis.
The applicant should understand that this letter is not authorization to construct or extend private
water or sewer systems, as the appropriate local or State permits are required prior to construction.
If the appropriate authorization to construct permits are not obtained and construction has not
started within two (2) years of issuance of this flow acceptance and payment for any service
connections have not been received within two (2) years of issuance of this flow acceptance letter,
this flow acceptance approval shall be rescinded and a new flow acceptance request must be
made.
The CAP analysis performed determines available capacity within the existing public gravity sewer
system. The developer is responsible for any additional private or public sewer infrastructure
required to convey flow from the proposed development to the existing public gravity sewer.
If you have any questions, please do not hesitate to contact me at (704)432-5801.
Sincerely,
C,vAAt wvwo-Awzo-(a,
Guillermo Anzola / Engineering Assistant
CHARLOTTE WATER / charlottewater.ora
Charlotte Water 5100 Brookshire Blvd,Charlotte, NC 28216 charlottewater.org
Operated by the City of Charlotte
M USGS U.S.DEPARTMENT OF THE INTERIOR ,W. CORNELIUS QUADRANGLE
mAr.M.,r.-It U.S.GEOLOGICAL SURVEY *a9 US Topo NORTH CAROUNA
7.5-MINUTE SERIES
tl.9]tl' .tl.1f W'
n.tla 42^•E 11 2-7
14 �.yy _1,5,Xy`y—���j 16 17!' 1! 19 20 iI ii n.f9m
.tar.N �r ti II 4�y }'` �1r _1`. .,��r�✓` _ 4%/ r�I ® � � C1/��� f r 1 � �.\i\t�l__��\�y(.Jp�7D
zefJ'�„ ; a�".rel. "m\ ..�� ��� �• I ✓ r ��1\ k�L^'.r-��� I.�/ �
zs /� i r�' ) Li ��1�"re+D ter— -s "4'0 r zS
Ac-
22
�• i t^�+ zz
n-
20
119
le HUMERSVILLC ,,,-��>�:.(p ^��'• C���•�h 1 /\
C_rv" '�(4 \l V! "`•K.r, l ""ash n �is
7 iSlS (�C Ni:era V • \�� 17
�, h _ �I!fir.,/,, >✓�� I,;� 1 �� (, _� r� ,
� +� � l l, �•e,r� ! � r -lam�ti
C�
_ f
Is
\ ..'J K.
(�` M1a15°°"N
ll.H' 1] It 1. 19 to 17 IR 19 ]R I 21 17 E
tl.N10 .W.1lN'Ifli19
M1OEu(W EY�I,.UnrrM Y.G,fNCI^91aI5un.y 1.ON(r ra SCALE I:29000
u.u,..,.• H naafi I .,,,,.nourllH
ace 4eunu,.vmanH.wwr.eN..eu..a a � , � �•of e
++�wR+avry e..mw .ww a �orc a„
m.nrw+.r�ur>�+.urvs.•+�n ar.. ,i. +atl - /'
f,a ..• ":aw-:« mr, a.,oa„II„.rom, I'I+I r I
CORNELIUS NC