HomeMy WebLinkAbout20051225 Ver 2_More Info Letter_20080110~~~ W A TFRQ Michael F. Easley, Governor
~0 G William G. Ross Jr., Secretary
~~-- North Carolina Department of Environment and Natural Resources
p ~ Coleen H. Sullins, Director
Division of Water Quality
January 10, 2008
DWQ Project # OS-1225, Ver. 2
Wake County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Mr. Carl Dawson, Jr.
City of Raleigh Public Works Deparment
P.O. Box 590
Raleigh, NC 27602-0590
Subject Property: City of Raleigh -Fred Fletcher Park Extended Detention Wetland
Ut to Pigeon House Branch [030402,22-33-18, C, NSW]
REQUEST FOR MORE INFORMATION
Dear Mr. Dawson:
On January 4, 2008, the Division of Water Quality (DWQ) received your application dated January 4,
2008, to fill or otherwise impact .184 linear feet of intermittent stream, and 11,040 square feet of Zone 1
Neuse River basin protected riparian buffers and 7,360 square feet of Zone 2 Neuse River basin protected
riparian buffers, to construct an extended detention wetland at the site. The DWQ has determined that
your application was incomplete and/or provided inaccurate information as discussed below. The DWQ
will require additional information in order to process your application to impact protected wetlands
and/or streams on the subject property. Therefore, unless we receive five copies of the additional
information requested below, we will have to move toward denial of your application as required by 15A
NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional
information. Please provide the following information so that we may continue to review your project.
Additional Information Requested:
Please provide a detailed planting plan for the extended detention wetland (1" = 20' or larger)
prepared by a qualified individual showing:
• A variety of suitable species (not including cattails),
• Sizes, spacing and locations of plantings,
• Total quantity of each type of plant specified,
• A planting detail,
• The source nursery for the plants, and
• Fertilizer and watering requirements to establish vegetation.
2. Please provide a signed and notarized Inspection and Maintenance Agreement for the proposed
extended detention wetland. DWQ recommends the use of the state BMP Inspection and
Maintenance Form for Extended Detention Wetlands, available at the following web site:
http://h2o. enr. state.nc.us/su/bmp_forms. htm.
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http://h2o.enr.state.nc.us/ncwetlands
N °° Carolina
~atura!!y
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
City of Raleigh
Page 2 of 2
January 10, 2008
Please submit this information within 30 calendar days of the date of this letter. If we do not receive this
requested information within 30 calendar days of the date of this letter, your project will be withdrawn
and you will need to reapply with a new application and a new fee.
This letter only addresses the application review and does not authorize any impacts to wetlands, waters
or protected buffers. Please be aware that any impacts requested within your application are not
authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-
1786 if you have any questions regarding or would like to set up a meeting to yl~iscuss this matter.
Sinc rely,
yndi aroly, Supervisor
401 Oversight/Express Review Permitting Unit
CBKlijm
cc: Lauren Witherspoon, DWQ Raleigh Regional Office
USACE Raleigh Regulatory Field Office
File Copy
Central Files
J. Brenan Buckley, CDM, 5400 Glenwood Avenue, Suite 300, Raleigh, NC 27612
Filename: 051255 V er2FredFletcherPa rkExtendedDete n lion W etland(W a ke)O n_Hold