Loading...
HomeMy WebLinkAboutSW6240606_Design Calculations_20240830 4D Site Solutions, Inc. PIPE CALCULATIONS NOTE:sheet only set up to handle Tc from 5 min to 30 min A. Cross-pipes to use 25-yr storm inensity 2050-Village at Rockfish Phase V Rainfall Intensity Storm Event 5 in 15-min 10-yr 7.91 6.33 5.34 3.87 25-yr 8.94 7.12 6.01 4.46 50-yr 9.65 7.68 6.49 4.89 100-yr 10.40 8.23 6.94 5.31 Tc Drainage Storm Rainfall Pipe No. C Kerby Kirpich Intensity Q(cfs) Area(ac) Event(yr) Total Tc Tc Used (in/hr) L(ft) n s Toy L(ft) S Tch 1 10.57 0.30 n/a 1050.0 0.007 11.03 11.03 10 25-yr 7.12 22.58 printed: 6/13/2024 1:45 PM Page 1 of 1 STORM DRAINAGE/HYDRAULIC GRADE LINE DATE DESIGN PHASE ANALYSIS(1 4-10-24 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Village at Rockfish Phase V 2050 REVISION / / LOCATION BY RECORD / / Cumberland County,North Carolina CEK OTHER / / CHECKED BY (SPECIFY) CSB n= 0.013 STORM DRAINAGE SCHEDULE CONTINUED ► g= 226 h= 26 INLET Q(+) Q(-) CAPTURED Tc I Cc INLET Cc INLET PSTREA INLET INLET TOTAL INLET PIPE TIME RUNOFF FROM TO AREAS AREA RUNOFF )ISCHARG BYPASS BYPASS )ISCHARG AREAS TIME TIME OF CONC.INTENSITY COEFF. (INLETS) (AC) COEFF. (CFS) (CFS) (CFS) (CFS) (AC) (MIN) (MIN) (MIN) (IN/HR) CI-1 CI-2 CI-1 0.42 0.65 1.15 0.06 00 1.15 0.42 5.00 0.00 5.00 7.29 0.65 CI-2 CI-Y CI-2 0.00 0.99 0.00 0.00 0.00 0.00 0.42 5.00 0.32 5.32 7.22 0.65 CI-Y CI-YY CI-Y 0.00 0.99 0.00 0.00 0.00 0.00 0.42 5.00 0.63 5.63 7.14 0.65 CI-YY CI-Z CI-YY 0.00 0.99 0.00 0.00 0.00 0.00 0.42 5.00 0.95 5.95 7.07 0.65 CI-Z CI-ZZ CI-Z 0.00 0.99 0.00 0.00 0.00 0.00 0.42 5.00 1.27 6.27 7.00 0.65 CI-ZZ CI-8 CI-ZZ 0.00 0.99 0.00 0.00 0.00 0.00 0.42 5.00 1.59 6.59 6.94 0.65 ■ CI#10020 CI#10054 CI#10020 0.14 0.65 I 0.00 0.31 0.14 5.00 0.00 5.00 7.29 0.65 CI#10054 UNK FES CI#100540.29 0.65 0.00 0.56 0.43 5.00 0.32 5.32 7.22 0.65 CI-1 P0-2 0.26 0.80 0.20 0.73 0.26 5.00 0.00 5.00 7.29 0.80 CI-3 POD 0.60 ii 0.32 •.•• 1.27 0.40 5.00 0.00 5.00 7.29 0.60 CI-5 P0-6 CI-5 0.40 0.60 0.00 0.00 0.96 0.40 5.00 0.00 5.00 7.29 0.60 CI-7 CI-8 CI-7 0.42 0.65 0.06 1.03 0.42 5.00 0.00 5.00 7.29 0.65 CI-8 P0-9 CI-8 0.16 0.55 0.00 0.29 0.58 5.00 0.11 5.11 7.27 0.62 CI-10 CI-11 CI-10 0.40 0.60 0.12 0.77 0.40 5.00 0.00 5.00 7.29 0.60 CI-11 P0-12 CI-11 0.45 0.60 0.05 0.81 0.85 5.00 0.11 5.11 7.27 0.60 CI-13 CI-14 CI-13 0.32 0.60 0.31 +. 0.75 0.32 5.00 0.00 5.00 7.29 0.60 CI-14 P0-15 CI-14 0.27 MIEM 0.33 0.28 0.74 0.59 5.00 0.11 5.11 7.27 0.62 CI-16 CI-17 CI-16 0.48 0.60 0.34 0.00 1.49 0.48 5.00 0.00 5.00 7.29 0.60 CI-17 P0-18 CI-17 0.52 MIEM 0.33 0.00 1.68 1.00 5.00 0.32 5.32 7.21 0.63 PIPE 1 IN PIPE 1 OUT PIPE 1 IN 2050-Storm drainage.xlsx 10-YEAR Date:6/13/2024 Time:12.58 PM Page 1 of 4 STORM DRAINAGE/HYDRAULIC GRADE LII DATE DESIGN PHASE ANALYSIS(10 YEAR) 4-10-24 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Village at Rockfish Phase V 2050 REVISION / / LOCATION BY RECORD / / Cumberland County,North Carolina CEK OTHER / / CHECKED BY (SPECIFY) CSB n= 0.013 STORM DRAINAGE SCHEDULE-CONTINUED 9= 226 9 h= 26 Q Q UPSTREAM SIDE- CAPACITY SEGMENT UPPER LOWER TOP FROM TO )ISCHARGE STREAM SLOPE DIA. (FULL) V FULL LENGTH TIME INV. INV. ELEV. (CFS) (CFS) (IN) (CFS) (FPS) (FT) (MIN) (FT) (FT) (FT) CI-1 CI-2 1.99 0.00 0.0100 15 6.5 5.3 100 0.32 106.00 105.00 100.00 CI-2 CI-Y 1.97 0.00 0.0100 15 6.5 5.3 100 0.32 100.00 99.00 100.00 CI-Y CI-YY 1.95 0.00 0.0100 15 6.5 5.3 100 0.32 98.00 97.00 100.00 CI-YY CI-Z 1.93 0.00 0.0100 15 6.5 5.3 100 0.32 97.00 96.00 100.00 CI-Z CI-ZZ 1.91 0.00 0.0100 15 6.5 5.3 100 0.32 96.00 95.00 100.00 CI-ZZ CI-8 1.89 0.00 0.0100 15 6.5 5.3 100 0.32 95.00 94.00 100.00 CI#10020 CI#10054 0.67 0.00 0.0100 15 6.5 5.3 0.32 106.00 105.00 100.00 CI#10054 UNK FES 2.04 0.00 0.0100 15 6.5 5.3 0.32 100.00 99.00 00.00 CI-1 P0-2 1.54 0.00 0.0051 15 4.6 3.7 0.66 80.85 80.10 I.83.36 CI-3 P0-4 1.73 0.00 0.0050 15 4.6 3.7 ME= 0.54 79.80 79.20 I182.30 CI-5 P0-6 1.75 0.00 0.0050 15 4.6 3.7 0.53 79.80 79.21 I182.30 CI-7 CI-8 1.99 0.00 0.0053 15 4.7 3.8 25 0.11 80.00 79.87 82.72 CI-8 P0-9 2.61 0.00 0.0066 15 5.2 4.3 102 0.40 79.87 79.20 82.72 CI-10 CI-11 1.75 0.00 0.0053 15 4.7 3.8 25 0.11 76.85 76.72 81.60 CI-11 P0-12 3.72 0.00 0.0227 15 9.7 7.9 120 0.25 76.72 74.00 81.60 CI-13 CI-14 1.42 0.00 0.0053 15 4.7 3.8 25 0.11 76.60 76.47 80.85 CI-14 P0-15 2.67 0.00 0.0070 15 5.4 4.4 110 0.42 76.47 75.70 80.85 CI-16 CI-17 2.10 0.00 0.0050 15 4.6 3.7 72 0.32 75.05 74.69 179.78 CI-17 P0-18 4.52 0.00 0.0376 15 12.5 10.2 162 0.26 74.69 68.60 79.78 PIPE 1 IN PIPE 1 OUT 20.07 0.00 0.0056 30 30.6 6.2 0.14 82.20 81.90 I185.28 2050-Storm drainage.xlsx 10-YEAR Date:6/13/2024 Time:12.58 PM Page 2 of 4 i BEND LOS; KS n= 0.013 90 DEG=0.7 30 DEG=0.28 g= 226'0 DEG=0.55 15 DEG=0.10 h= 26 CI COVER BOX COVER BELOW IDESTREA BEND FROM TO DEPTH SUBGRADBUMMATIOI LOSS I (8") (CFS) K CI-1 CI-2 -6.00 (7.25) (8.38) 0.00 0.90 CI-2 CI-Y 0.00 (1.25) (2.38) 0.00 0.90 CI-Y CI-YY 2.00 0.75 (0.38) 0.00 0.90 CI-YY CI-Z 3.00 1.75 0.63 0.00 0.90 CI-Z CI-ZZ 4.00 2.75 1.63 0.00 0.90 CI-ZZ CI-8 5.00 3.75 2.63 0.00 0.90 CI#10020 CI#10054 -6.00 (7.25) (8.38) 0.00 0.90 CI#10054 UNK FES 0.00 (1.25) (2.38) 0.00 0.90 CI-1 P0-2 2.51 1.26 0.13 0.00 0.00 CI-3 P0-4 2.50 1.25 0.12 0.00 0.00 CI-5 P0-6 2.50 1.25 0.12 0.00 0.00 CI-7 CI-8 2.72 1.47 0.34 0.00 0.00 CI-8 P0-9 2.85 1.60 0.47 0.00 0.00 CI-10 CI-11 4.75 3.50 2.37 0.00 0.00 CI-11 P0-12 4.88 3.63 2.50 0.00 0.00 CI-13 CI-14 4.25 3.00 1.87 0.00 0.00 CI-14 P0-15 4.38 3.13 2.00 0.00 0.00 CI-16 CI-17 4.73 3.48 2.36 0.00 0.00 CI-17 P0-18 5.09 3.84 2.72 0.00 0.00 PIPE 1 IN PIPE 1 OUT 3.08 0.58 (0.55) 0.00 0.00 2050-Storm drainage.xlsx 10-YEAR Date:6/13/2024 Time:12:58 PM Page 3 of 4 STORM DRAINAGE/HYDRAULIC GRADE LINE DATE DESIGN PHASE ANALYSIS(10 YEAR) 4-10-24 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Village at Rockfish Phase V 2050 REVISION / // LOCATION BY RECORD / / Cumberland County,North Carolina CEK OTHER / / CHECKED BY (SPECIFY) CSB DESIGN CRITERIA: n= 0.013 HYDRAULIC GRADE LINE-CONTINUED 1.DESIGN FOR THE 10 YR STORM g= 226 2.ASSUME TIME OF CONCENTRATION TO h= 26 AN INDIVIDUAL INLET=5 MIN.(Unless otherwise noted) INLET W.S.ELEV. 3.INTENSITY=g/(h+T),FOR 10 YR STORM OUTLET OUTLET INLET USE 1 FLOW FREE- HGL (g and h were derived from Raleigh-Durham Intensity- FROM TO W.S.ELEV CONTOL CONTROL CONDITION BOARD 1-0 CROWN COMMENTS CAPACITY VS Duration-Frequency Charts,REF:NC Erosion and (FT) (Fr) (FT) (FT) I CONTROL (Fr) I DISCHARGE Sediment Control Planning and Design Manual) 4.MANNINGS"n"FACTOR=0.013 CI-1 CI-2 106.00 106.16 106.74 106.74 INLET (6.74) 0.51 OVERFLOW 4.47 5.RUNOFF COEFICIENT Cc=0.50(Per CR-7107) CI-2 CI-Y 100.00 100.15 100.74 100.74 INLET (0.74) 0.51 OVERFLOW 4.49 CI-Y CI-YY 98.00 98.15 98.73 98.73 INLET 1.27 0.52 OK 4.51 CI-YY CI-Z 97.00 97.15 97.73 97.73 INLET 2.27 0.52 OK 4.53 CI-Z CI-ZZ 96.00 96.14 96.73 96.73 INLET 3.27 0.52 OK 4.55 CI-ZZ CI-8 95.00 95.14 95.73 95.73 INLET 4.27 0.52 OK 4.57 CI#10020 CI#10054 106.00 106.02 106.64 106.64 INLET (6.64) 0.61 OVERFLOW 5.79 CI#10054 UNK FES 100.00 100.16 100.74 100.74 INLET (0.74) 0.51 OVERFLOW 4.42 CI-1 P0-2 81.10 81.20 81.54 81.54 INLET 1.81 0.56 OK 3.06 GROUND 80.05 CI-3 P0-4 80.20 80.31 80.51 80.51 INLET 1.79 0.54 OK 2.82 GROUND 79.20 CI-5 P0-6 80.21 80.31 80.51 80.51 INLET 1.79 0.54 OK 2.82 GROUND 79.20 CI-7 CI-8 80.87 80.92 80.74 80.92 OUTLET 1.80 0.33 OK 2.72 CI-8 P0-9 80.20 80.41 80.69 80.69 INLET 2.03 0.43 OK 2.63 GROUND 79.20 CI-10 CI-11 77.74 77.78 77.56 77.78 OUTLET 3.82 0.32 OK 2.96 CI-11 P0-12 75.00 75.48 77.74 77.74 INLET 3.86 0.23 OK 6.00 GROUND 74.00 CI-13 CI-14 77.47 77.49 77.28 77.49 OUTLET 3.35 0.36 OK 3.29 CI-14 P0-15 76.70 76.93 77.30 77.30 INLET 3.55 0.42 OK 2.73 GROUND 75.70 CI-16 CI-17 75.90 76.00 75.80 76.00 OUTLET 3.78 0.30 OK 2.46 CI-17 P0-18 69.60 70.51 75.90 75.90 INLET 3.88 0.04 OK 8.01 GROUND 68.60 PIPE 1 IN PIPE 1 OUT 83.90 84.18 84.17 84.18 OUTLET 1.10 0.52 OK 10.50 GROUND 81.90 2050-Storm drainage.xlsx 10-YEAR Date:6/13/2024 Time:12:58 PM Page 4 of 4 Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Thursday,Jun 13 2024 PIPE 1 (25-YR) Invert Elev Dn (ft) = 81.90 Calculations Pipe Length (ft) = 54.00 Qmin (cfs) = 22.58 Slope (%) = 0.56 Qmax (cfs) = 22.58 Invert Elev Up (ft) = 82.20 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) = 22.58 No. Barrels = 3 Qpipe (cfs) = 22.58 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 4.68 Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) = 5.61 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) = 83.18 HGL Up (ft) = 83.27 Embankment Hw Elev (ft) = 83.83 Top Elevation (ft) = 85.30 Hw/D (ft) = 1.09 Top Width (ft) = 39.00 Flow Regime = Inlet Control Crest Width (ft) = 5.00 eev.h! PIPE 1(25-YR) H,•;Depth l t: 05 CC 3 6: as 00 2.80 84.00 1.80 Inlet control 83.00 0.80 82.00 - -0.20 81.00 - -1.20 80.00 -2.20 0 5 10 15 20 25 30 35 4D 45 5D 55 6D 65 70 75 CircularCulvert HGL Embank Reach(ft) HY-8 Culvert Analysis Report Crossing Discharge Data Discharge Selection Method: Recurrence Table 1-Summary of Culvert Flows at Crossing: PIPE 1 TRIPLE Headwat Discharg Total PIPE 1A PIPE 1B PIPE 1C Roadwa Iteration er e Names Dischar Dischar Dischar Dischar y s Elevatio ge (cfs) ge (cfs) ge (cfs) ge (cfs) Dischar n (ft) ge (cfs) 83.86 10 year 20.07 6.69 6.69 6.69 0.00 8 83.99 25 year 22.58 7.53 7.53 7.53 0.00 4 84.17 100 year 26.10 8.70 8.70 8.70 0.00 7 85.30 Overtoppi 38.65 12.88 12.88 12.88 0.00 Overtoppi ng ng Rating Curve Plot for Crossing: PIPE 1 TRIPLE Total Rating Curve Crossing:PIPE 1 TRIPLE 84.15- 84.10- 0 84.05- a d W m 84.00- m - w - 2 83.95- 83.90- 83.85- 20 21 22 23 24 25 28 Total Discharge(cfs) Culvert Data: PIPE 1A Table 1-Culvert Summary Table: PIPE 1A Disc Total Culv Head Inle Out Fl Nor Crit Ou Tail Outl Tail harg Disc ert water t let o mal ical tle wate et wate e harg Disc Eleva Con Con w Dep De t r Vel r Nam e harg tion trol trol Ty th pth De Dept ocit Velo es (cfs) e (ft) Dep Dep pe (ft) (ft) pth h (ft) y city (cfs) th th (ft) (ft/ (ft/s (ft) (ft) s) ) 10 20.07 6.69 83.86 1.58 1.66 7- 1.00 1.0 1.0 0.47 5.34 0.89 year cfs cfs 5 M 0 0 2c 25 22.58 7.53 83.99 1.73 1.78 7- 1.10 1.0 1.0 0.50 5.62 0.92 year cfs cfs 5 M 6 6 2c 100 26.10 8.70 84.17 1.97 1.96 7- 1.26 1.1 1.1 0.55 6.03 0.97 year cfs cfs 3 M 4 4 2c Culvert Barrel Data Culvert Barrel Type Straight Culvert Inlet Elevation (invert): 82.20 ft, Outlet Elevation (invert): 81.90 ft Culvert Length: 54.00 ft, Culvert Slope: 0.0056 Culvert Performance Curve Plot: PIPE 1A Performance Curve Culvert:PIPE 1A 0 0 Inlet Control Elev Outlet Control Elev 8415- 8410- 8405-tg _ �'I o 84.00-_ m 83.95- i' I = 83.90- A" 83.85- 83.80- 20 21 22 23 24 25 26 Total Discharge(cfs) Water Surface Profile Plot for Culvert: PIPE 1A Crossing-PIPE 1 TRIPLE,Design Discharge-26.1 cfs Culvert-PIPE 1A,Culvert Discharge-8.7 cfs 85.0- 84.5- 84.0 c _ o _ 83.5— a) _ lu _ 83.0- 82.5- • 82.0- 990 1000 1010 1020 1030 1040 10550 1060 1070 Station(ft) Site Data - PIPE 1A Site Data Option: Culvert Invert Data Inlet Station: 1000.00 ft Inlet Elevation: 82.20 ft Outlet Station: 1054.00 ft Outlet Elevation: 81.90 ft Number of Barrels: 1 Culvert Data Summary- PIPE 1A Barrel Shape: Circular Barrel Diameter: 1.50 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0120 Culvert Type: Straight Inlet Configuration: Square Edge with Headwall Inlet Depression: None Culvert Data: PIPE 1B Table 2-Culvert Summary Table: PIPE 1B Disc Total Culv Head Inle Out Fl Nor Crit Ou Tail Outl Tail harg Disc ert water t let o mal ical tle wate et wate e harg Disc Eleva Con Con w Dep De t r Vel r Nam e harg tion trol trol Ty th pth De Dept ocit Velo es (cfs) e (ft) Dep Dep pe (ft) (ft) pth h (ft) y city (cfs) th th (ft) (ft/ (ft/s (ft) (ft) s) ) 10 20.07 6.69 83.86 1.58 1.66 7- 1.00 1.0 1.0 0.47 5.34 0.89 year cfs cfs 5 M 0 0 2c 25 22.58 7.53 83.99 1.73 1.78 7- 1.10 1.0 1.0 0.50 5.62 0.92 year cfs cfs 5 M 6 6 2c 100 26.10 8.70 84.17 1.97 1.96 7- 1.26 1.1 1.1 0.55 6.03 0.97 year cfs cfs 3 M 4 4 2c Culvert Barrel Data Culvert Barrel Type Straight Culvert Inlet Elevation (invert): 82.20 ft, Outlet Elevation (invert): 81.90 ft Culvert Length: 54.00 ft, Culvert Slope: 0.0056 Culvert Performance Curve Plot: PIPE 1B Performance Curve Culvert:PIPE 1B 0 0 Inlet Control Elev Outlet Control Elev 8415- 8410- 8405-tg _ �'I o 84.00-_ m 83.95- i' I = 83.90- A� 83.85- 83.80- 20 21 22 23 24 25 26 Total Discharge(cfs) Water Surface Profile Plot for Culvert: PIPE 1B Crossing-PIPE 1 TRIPLE,Design Discharge-26.1 cfs Culvert-PIPE 1B,Culvert Discharge-8.7 cfs 85.0- 84.5- 84.0 c _ o _ 83.5— a) _ 1u _ 83.0- 82.5- • 82.0- 990 1000 1010 1020 1030 1040 10550 1060 1070 Station(ft) Site Data - PIPE 1B Site Data Option: Culvert Invert Data Inlet Station: 1000.00 ft Inlet Elevation: 82.20 ft Outlet Station: 1054.00 ft Outlet Elevation: 81.90 ft Number of Barrels: 1 Culvert Data Summary- PIPE 1B Barrel Shape: Circular Barrel Diameter: 1.50 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0120 Culvert Type: Straight Inlet Configuration: Square Edge with Headwall Inlet Depression: None Culvert Data: PIPE 1C Table 3-Culvert Summary Table: PIPE 1C Disc Total Culv Head Inle Out Fl Nor Crit Ou Tail Outl Tail harg Disc ert water t let o mal ical tle wate et wate e harg Disc Eleva Con Con w Dep De t r Vel r Nam e harg tion trol trol Ty th pth De Dept ocit Velo es (cfs) e (ft) Dep Dep pe (ft) (ft) pth h (ft) y city (cfs) th th (ft) (ft/ (ft/s (ft) (ft) s) ) 10 20.07 6.69 83.86 1.58 1.66 7- 1.00 1.0 1.0 0.47 5.34 0.89 year cfs cfs 5 M 0 0 2c 25 22.58 7.53 83.99 1.73 1.78 7- 1.10 1.0 1.0 0.50 5.62 0.92 year cfs cfs 5 M 6 6 2c 100 26.10 8.70 84.17 1.97 1.96 7- 1.26 1.1 1.1 0.55 6.03 0.97 year cfs cfs 3 M 4 4 2c Culvert Barrel Data Culvert Barrel Type Straight Culvert Inlet Elevation (invert): 82.20 ft, Outlet Elevation (invert): 81.90 ft Culvert Length: 54.00 ft, Culvert Slope: 0.0056 Culvert Performance Curve Plot: PIPE 1C Performance Curve Culvert:PIPE 1C 0 0 Inlet Control Elev Outlet Control Elev 8415- 8410- 8405-tg _ �'I o 84.00-_ _ .r m 83.95- i' I = 83.90- A� 83.85- 83.80- 20 21 22 23 24 25 26 Total Discharge(cfs) Water Surface Profile Plot for Culvert: PIPE 1C Crossing-PIPE 1 TRIPLE,Design Discharge-26.1 cfs Culvert-PIPE 1C,Culvert Discharge-8.7 cfs 85.0- 84.5- 84.0 c _ o _ 83.5— a) _ lu _ 83.0- 82.5- • 82.0- 990 1000 1010 1020 1030 1040 10550 1060 1070 Station(ft) Site Data - PIPE 1C Site Data Option: Culvert Invert Data Inlet Station: 1000.00 ft Inlet Elevation: 82.20 ft Outlet Station: 1054.00 ft Outlet Elevation: 81.90 ft Number of Barrels: 1 Culvert Data Summary- PIPE 1C Barrel Shape: Circular Barrel Diameter: 1.50 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0120 Culvert Type: Straight Inlet Configuration: Square Edge with Headwall Inlet Depression: None Tailwater Data for Crossing: PIPE 1 TRIPLE Table 2-Downstream Channel Rating Curve(Crossing: PIPE 1 TRIPLE) Flow(cfs) Water Velocity Depth (ft) Shear (psf) Froude Surface (ft/s) Number Elev(ft) 20.07 82.57 0.47 0.89 0.09 0.25 22.58 82.60 0.50 0.92 0.09 0.25 26.10 82.65 0.55 0.97 0.10 0.25 Tailwater Channel Data - PIPE 1 TRIPLE Tailwater Channel Option: Trapezoidal Channel Bottom Width: 40.00 ft Side Slope (H:V): 17.00 (_:1) Channel Slope: 0.0030 Channel Manning's n: 0.0500 Channel Invert Elevation: 82.10 ft Roadway Data for Crossing: PIPE 1 TRIPLE Roadway Profile Shape: Constant Roadway Elevation Crest Length: 5.00 ft Crest Elevation: 85.30 ft Roadway Surface: Paved Roadway Top Width: 39.00 ft NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>Steep lot swale Name Steep lot swale Discharge 0.5 Channel Slope 0.08 Channel Bottom Width 0 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class D 2-6 in Vegetation Type Bunch Type Vegetation Density Fair 50-64% Soil Type Sandy Loam(GM) Unreinforced Vegetation Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Unreinforced Straight 0.5 cfs 2.62 ft/s 0.25 ft 0.039 4 lbs/ft2 1.24 lbs/ft2 3.22 STABLE -- Vegetation Underlying Straight 0.5 cfs 2.62 ft/s 0.25 ft 0.039 1.1 lbs/ft2 0.59 lbs/ft2 1.87 STABLE Substrate NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 SLOPE ANALYSIS >>>3:125' Country United States State/Region North Carolina City Fayetteville Annual R Factor 300.00 Adjusted R Factor 246.00 Total Slope Length 25 Protection Type Permanent Protection Period 9 Beginning Month June Slope Gradient(H:1) 3 Soil Type Sandy Loam K Factor 0.19 Reach 1 Start: Oft End: 25 ft Vegetation Type: 80-95% Material ASL bare ASL mat MSL bare MSL mat Soil Loss SF Remarks Staple/App Tolerance Rate S75 0.5 in 0.0 in 0.9 in 0.0 in 0.25 in 7.055 STABLE D S200 0.5 in 0.0 in 0.9 in 0.0 in 0.25 in >10 STABLE D Estb. Veg. 0.9 in 0.0 in N/A in N/A in 0.03 in 0.894 UNSTABLE -- VILLAGE AT ROCKFISH PHASE V STORM WATER CALCULATIONS oFEs 1.;i;. '1/9 A L 27452• = ;� S�NGINE�O�?: ,, CO TT g� v‘cl,