HomeMy WebLinkAboutNCC242806_ESC Approval Submitted_20240912 Dennis Gilbert
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Tuesday, September 10, 2024 10:06 AM
To: A&G Residential, LLC
Cc: Dennis Gilbert; Michael Naylor
Subject: NC DEMLR - FROF Application Approval CRM:0177163
Attachments: Application Report - Tuesday, September 10, 2024 1000 AM. df; Certificate of Approval
- Tuesday, September 10, 2024 1000 AM.docx; Letter of App loyal - Tuesday, September
10, 2024 1000 AM.docx
'i
\tigp11
�la:g� _ �S'
.44
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
09-10-2024
LETTER OF APPROVAL
A&G Residential, LLC
916 Arsenal Aven e, Suite B
Fayetteville, NC 2 305
RE: Project ame: Susan Tart Development—Lots 3,4, 7, 8, 11 & 12
Acres Approved: 5.01
Application ID: PA-006704
Permit Number: CUMBE-2025-0257
Address: Wade Stedman Road SR-1826
City: Ea toyer Township
County:Cumberland
River B sin: Cape Fear
1
L
it I'
Stream lassification:
ss fication: C: Aquatic Life, Secondary Contact Recreation, Fresh water
Plan Ty e:New Plan
Dear A&C Reside tial, LLC,
This office has rev ewed the subject erosion and sedimentation control plan. We find the plan to be acc ptable and
hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall
expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by
Title 15A NCAC 4 .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General
Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the
$120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party
shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land
disturbing activity The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOl form
to the Stdrmwate Pro.ram staff in the Raleigh central office. If the owner/operator of this project changes in the future,
the new rrsponsi.le party must obtain a new COC.
Title 15A `(CAC 4: .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site:
1.The app oved E&SC plan as well as any approved deviation.
2. The NO.01 permit and the COC, once it is received.
3.,Records of inspections made during the previous 12 months.
Also, this letter gi es the notice required by G.S. 113A-61.1(a) of our right of periodic inspectio to ensure compliance with
the approved pla .
North Carolina's S-dimentation Pollution Control Act is performance-oriented, requiring protec ion of a fisting natural
resources and adjoining properties. If, following the commencement of this project, the erosion and se imentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 1 3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure complianc with the Act.
Acceptance and a proval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and r les. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This appr val does not supersede any other permit or approval.
Please note that t is approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting
date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
,Chris Baker, Assistant Regional Engineer
cc:
Dennis Gilbert, P. E., Moormen, Kizer & Reitzel, Inc.
Michael Naylor, Cumberland County Inspection Office
Fayetteville Regional Office
2
•
North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources
D �� ;Fayetteville Regional Office 225 Green Street,Suite 714 Fayetteville NC,28301-5195
j � 910-433-3300
F mail comes)ondence t- and from this address may be subject to the North Carolina Public Records taw and may be disclosed to third p rties by an authorized
state official.
3