HomeMy WebLinkAboutNCG500289_CEI_Resinall Corporation_2024_20240911
September 11, 2024
Paul Pearce
Resinall Corporation
PO Box 195
Severn, NC 27877
Subject: Compliance Evaluation Inspection
Resinall Corporation
NPDES Permit NCG500289
Northampton County
Dear Mr. Patrick:
On Monday, September 9th, 2024, Kevin Fowler conducted a compliance evaluation inspection
of the facilities located at the Resinall Corporation. The purpose of this visit was to conduct an
inspection of the subject NPDES facility. During the inspection, the presence and cooperation of
Paul Pearce was greatly appreciated.
The Resinall Corporation Site is located at 302 N. Water Street, Severn, North Carolina 27862 in
Northampton County. The plant has a Non-contact Cooling, Boiler Blowdown Wastewater
Discharge COC.
This NPDES compliance evaluation inspection consisted of the following:
Review of the NPDES permit;
Review of the owner/facility information;
Review of monitoring data and compliance history.
On-site inspection of sampling locations and outfalls.
On-site inspection of maintenance/operation records.
Docusign Envelope ID: 1F58E3B4-2C00-43D3-BCAA-B8F311FBCECB
Page 2 of 2
Resinall Corporation
Compliance Inspection 2024
2
Findings during the pre-inspection file review were:
1. Through NPDES permit NCG500289, Resinall Corporation is authorized to discharge boiler
non-contact boiler blowdown water from the site to an unnamed tributary to Kirby’s Creek,
in the Chowan River Basin.
2. The current Certificate of Coverage was issued effective 12/21/2020 and will remain valid
for the duration of the General Permit (expires 11/20/2025).
3. DMRs are not required per the General Permit.
4. All annual permit invoices are paid and no overdue fees present.
5. No ORC is required for this permit.
Findings during the inspection were:
6. The operators’ log and supporting analytical documentation were consistent and up to date.
Temperature and pH are measured at the discharge location as well as upstream and
downstream. A review of records from the past five years revealed compliance with permit
monitoring requirements. Samples at the outfall are taken multiple times per week.
7. The facility currently has one outfall.
a) Outfall 001 had a right of way that was well maintained, and no evidence of solids/foam
were present in effluent.
b) The outfall has a gate that can be shut down to prevent discharge in case of emergency.
8. pH of the boiler blowdown is adjusted with sulfuric acid and sodium hydroxide and is
monitored in real time with a pH meter. The mentioned pH meter is calibrated weekly.
9. Extensive maintenance logs are kept of all plant equipment through the company database.
If you have questions or comments about the inspection, this report or the requirements to take
corrective action (if applicable), please contact Kevin Fowler at 919-437-0047 or via email at
kevin.fowler@deq.nc.gov
Sincerely,
Vanessa Manuel
Water Quality Regional Assistant Supervisor
Raleigh Regional Office
Attachments: EPA Water Compliance Inspection Report
Cc: Laserfische
Docusign Envelope ID: 1F58E3B4-2C00-43D3-BCAA-B8F311FBCECB
EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NCG500289 24/09/09 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Resinall Corporation
302 N Water St
Severn NC 27877
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
10:00AM 24/09/09 20/12/21
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
11:15AM 24/09/09 25/11/30
Name, Address of Responsible Official/Title/Phone and Fax Number
Paul Pearce,302 N Water St Severn NC 27877//252-585-1445/2525850898 Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Operations & Maintenance Records/Reports Facility Site Review
Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Kevin Fowler DWR/RRO WQ/919-791-4200/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
09/11/2024
Docusign Envelope ID: 1F58E3B4-2C00-43D3-BCAA-B8F311FBCECB
9/11/2024
NPDES yr/mo/day
24/09/09
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Findings during the pre-inspection file review were:
1.Through NPDES permit NCG500289, Resinall Corporation is authorized to discharge boiler
non-contact boiler blowdown water from the site to an unnamed tributary to Kirby’s Creek, in the
Chowan River Basin.
2.The current Certificate of Coverage was issued effective 12/21/2020 and will remain valid for the
duration of the General Permit (expires 11/20/2025).
3.DMRs are not required per the General Permit.
4.All annual permit invoices are paid and no overdue fees present.
5.No ORC is required for this permit.
Findings during the inspection were:
6.The operators’ log and supporting analytical documentation were consistent and up to date .
Temperature and pH are measured at the discharge location as well as upstream and downstream . A
review of records from the past five years revealed compliance with permit monitoring requirements.
Samples at the outfall are taken multiple times per week.
7.The facility currently has one outfall.
a)Outfall 001 had a right of way that was well maintained, and no evidence of solids/foam were
present in effluent.
b)The outfall has a gate that can be shut down to prevent discharge in case of emergency.
8.pH of the boiler blowdown is adjusted with sulfuric acid and sodium hydroxide and is monitored in
real time with a pH meter. The mentioned pH meter is calibrated weekly.
9.Extensive maintenance logs are kept of all plant equipment through the company database.
NCG500289 17 (Cont.)
Page#2
Docusign Envelope ID: 1F58E3B4-2C00-43D3-BCAA-B8F311FBCECB
Permit:NCG500289
Inspection Date:09/09/2024
Owner - Facility:
Inspection Type:
Resinall Corporation
Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Comment:
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain-of-custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Page#3
Docusign Envelope ID: 1F58E3B4-2C00-43D3-BCAA-B8F311FBCECB
Permit:NCG500289
Inspection Date:09/09/2024
Owner - Facility:
Inspection Type:
Resinall Corporation
Compliance Evaluation
Record Keeping Yes No NA NE
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
pH of the boiler blowdown is adjsuted with sulfuric acid and sodium hydroxide and
monitored with a pH meter. Meter is calibrated weekly. DMRs are not required. ORC
is note required.
Comment:
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
After being pH adjusted, boiler blowdown water is comingled with stormwater in an
on-site ditch and then discharged from Outfall 001.