HomeMy WebLinkAbout20210738 Ver 3_Approval Letter (Individual)_20240911Docusign Envelope ID: 37710E6B-118D-4932-96AB-CC9E5AD58311
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR. NORTH CAROLINA
Director Environmental Quality
September 11, 2024
DWR # 20210738 V3
Wake County
Attn: Laura Greenan
149 Chimney Rise Drive
Cary, NC 27511
Delivered via email to: LSGreenan@gmail.com
Subject: Approval of Individual 401 Water Quality Certification
149 Chimney Rise Drive — Yard Stabilization Project
Location: 149 Chimney Rise Drive, Cary, NC 27511
Dear Laura Greenan:
Attached hereto is a copy of Certification No. WQC007183 issued to Laura Greenan dated September 12,
2024. This approval is for the purpose and design described in your application.
This Water Quality Certification does not relieve the Permittee of the responsibility to obtain all other
required Federal, State, or Local approvals before proceeding with the project, including those required
by, but not limited to, Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and
Trout Buffer regulations.
Upon the presentation of proper credentials, the Division may inspect the property.
This Water Quality Certification shall expire the same day as the expiration date of the corresponding
Section 404 Permit that is current at the time this Certification is issued. The conditions shall remain in
effect for the life of the project, regardless of the expiration date of this Water Quality Certification.
Non-compliance with or violation of the conditions herein set forth may result in revocation of this
Water Quality Certification for the project and may also result in criminal and/or civil penalties.
This approval and its conditions are final and binding unless contested [G.S. 143-215.5].
This Certification can be contested as provided in Chapter 150B of the North Carolina General Statutes by
filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative
Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter
150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code.
NORTH ntntE NA
o.p.rereM m Environmental o..nry
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611
919.707.9000
Docusign Envelope ID: 37710E6B-118D-4932-96AB-CC9E5AD58311
149 Chimney Rise Drive — Yard Stabilization Project
DWR# 20210738 V3
Individual Certification #WQC007183
Page 2 of 7
Additional information regarding requirements for filing a Petition and Petition forms may be accessed at
http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000.
A party filing a Petition must serve a copy of the Petition on:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
If the party filing the Petition is not the Permittee, then the party must also serve the recipient of the
Certification in accordance with N.C.G.S. 150B-23(a).
This letter completes the Division's review under Section 401 of the Clean Water Act and 15A NCAC 02H
.0500. Please contact Joe Myers at 919-791-4256 or joseph.myers@deq.nc.gov if you have any
questions or concerns.
Electronic cc:
Sincerely,
DocuSigned by:
83281344CE9EB4A1...
John Hennessy
WQ Regional Operations Section Chief
Division of Water Resources
Department of Environmental Quality
Rachel Capito, USACE Raleigh Regulatory Field Office
Gabriella Garrison, NCWRC
DWR 401 & Buffer Permitting Branch Electronic file
Filename: 20210738 V3_149 Chimney Rise Drive — Yard Stabilization Project_IP13_Wake_401 Approval Letter
NORTH raaoJNa
Department at Environmental Puolity
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611
919.707.9000
Docusign Envelope ID: 37710E6B-118D-4932-96AB-CC9E5AD58311
149 Chimney Rise Drive — Yard Stabilization Project
DWR# 20210738 V3
Individual Certification #WQC007183
Page 3 of 7
NORTH CAROLINA 401 WATER QUALITY CERTIFICATION
CERTIFICATION #WQC007183 is issued in conformity with the requirements of Section 401, Public Laws
92-500 and 95-217 of the United States and subject to North Carolina's Regulations in 15 NCAC 02H .0500
and 15A NCAC 02B .0200, to Laura Greenan, who has authorization for the impacts listed below, as
described within your application received by the N.C. Division of Water Resources (Division) on June 28,
2024, and subsequent information on August 26, 2024 and September 4, 2024, and within the Reasonable
Period of Time pursuant to 40 CFR Part 121.6.
The State of North Carolina certifies that this activity will comply with water quality requirements and
the applicable portions of Sections 301, 302, 303, 306, 307 of the Public Laws 92-500 and PL 95-217 if
conducted in accordance with the application, the supporting documentation, and conditions
hereinafter set forth.
The following impacts are hereby approved. No other impacts are approved, including incidental
impacts. [15A NCAC 02H .0506(b)]
Type of Impact
Amount Approved
Permanent
Amount Approved
Temporary
Mitigation Amount
Required
Open Waters
Above Normal Pool
01: Riprap and
Retaining Wall
371 square feet
0 square feet
0 credits
Below Normal Pool
01: Riprap and
Retaining Wall
371 square feet
0 square feet
0 credits
Totals:
742 square feet
0 square feet
0 credits
This approval requires you to follow the conditions listed in the Certification below.
CONDITIONS OF CERTIFICATION [15A NCAC 02H .0507(c)]:
1. The plans and specifications for this project are incorporated by reference as part of this Water
Quality Certification. If you change your project, you must notify the Division, and you may be
required to submit a new application package with the appropriate fee.
If the property is sold, the Permittee shall provide the new owner must with a copy of this
Water Quality Certification and all plans and specifications incorporated by reference. The
Permittee may transfer this Water Quality Certification to the new owner by submitting a letter
to the Division with the following statement: "At the time the property is transferred, the terms
and conditions of this 401 Individual Water Quality Certification, including the responsibility to
ensure compliance, are binding on the new owner(s) of the property." The letter shall be signed
and dated by both the transferee and the new owner.
Citation: 15A NCAC 02H .0507(d)(2)
D_E
NORTH CAROJMQ
Department at Environmental Puolity
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611
919.707.9000
Docusign Envelope ID: 37710E6B-118D-4932-96AB-CC9E5AD58311
149 Chimney Rise Drive — Yard Stabilization Project
DWR# 20210738 V3
Individual Certification #WQC007183
Page 4 of 7
2. If the Permittee becomes aware of any inability to comply with any of the conditions of this Water
Quality Certification, they must notify the Raleigh Regional Office within 24 hours (or the next
business day if a weekend or holiday) from the time the Permittee becomes aware of the
circumstances. The Permittee may be required to submit a new application package with
appropriate fee to initiate modification of this authorization, and/or to conduct corrective actions
as determined by the Division.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
3. Temporary buffer impacts associated with the bank stabilization (riprap & retaining wall) shall be
restored to pre -construction topographic and hydrologic conditions and replanted with
comparable vegetation within two months of when construction is complete. Tree planting may
occur during the dormant season. At the end of five years, any restored wooded riparian buffer
shall comply with the restoration criteria in 15A NCAC 2B .0295(i)
4. The Permittee shall report to the DWR Raleigh Regional Office any noncompliance with, and/or
any violation of, stream or wetland standards [15A NCAC 02B .0200], including but not limited to
sediment impacts to streams or wetlands. Information shall be provided orally within 24 hours (or
the next business day if a weekend or holiday) from the time the Permittee became aware of the
non-compliance circumstances.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
5. No waste, spoil, solids, or fill of any kind shall occur in wetlands or waters beyond the footprint
of the approved impacts (including temporary impacts).
Citation: 15A NCAC 02H .0506; 15A NCAC 02H .0507(c)
6. All activities shall be in compliance with any applicable State Regulated Riparian Buffer Rules in
Chapter 2B of Title 15A in the North Carolina Administrative Code.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
7. When applicable, all construction activities shall be performed and maintained in full
compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973).
Regardless of applicability of the Sediment and Pollution Control Act, all projects shall
incorporate appropriate Best Management Practices for the control of sediment and erosion so
that no violations of state water quality standards, statutes, or rules occur.
Design, installation, operation, and maintenance of all sediment and erosion control measures
shall be equal to or exceed the requirements specified in the most recent version of the North
Carolina Sediment and Erosion Control Manual, or for linear transportation projects, the North
Carolina Department of Transportation Sediment and Erosion Control Manual.
All devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) sites,
including contractor -owned or leased borrow pits associated with the project. Sufficient
materials required for stabilization and/or repair of erosion control measures and stormwater
routing and treatment shall be on site at all times.
For borrow pit sites, the erosion and sediment control measures shall be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
D_E
NOh 1 r i anRo. iNa
Department at Environmental Puolity
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611
919.707.9000
Docusign Envelope ID: 37710E6B-118D-4932-96AB-CC9E5AD58311
149 Chimney Rise Drive — Yard Stabilization Project
DWR# 20210738 V3
Individual Certification #WQC007183
Page 5 of 7
Surface Mining Manual. Reclamation measures and implementation shall comply with the
reclamation in accordance with the requirements of the Sedimentation Pollution Control Act
and the Mining Act of 1971.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCACO2B .0200; 15A NCAC 02B
.0231
8. Sediment and erosion control measures shall not be installed in wetland or waters except within
the footprint of temporary or permanent impacts otherwise authorized by this Certification. If
placed within authorized impact areas, then placement of such measures shall not be conducted
in a manner that results in dis-equilibrium of any wetlands, streambeds, or streambanks. Any
silt fence installed within wetlands shall be removed from wetlands and the natural grade
restored within two (2) months of the date that DEMLR or locally delegated program has
released the specific area within the project to ensure wetland standards are maintained upon
completion of the project.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200; 15A NCAC 02B
.0231
9. Erosion control matting that incorporates plastic mesh and/or plastic twine shall not be used
along streambanks or within wetlands.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
10. If the project is covered by NPDES Construction Stormwater Permit Number NCG010000 or
NPDES Construction Stormwater Permit Number NCG250000, full compliance with permit
conditions including the erosion & sedimentation control plan, inspections and maintenance,
self -monitoring, record keeping, and reporting requirements is required.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200; 15A NCAC 02B
.0231
11. All work in or adjacent to streams shall be conducted so that the flowing stream does not come
in contact with the disturbed area. Approved best management practices from the most current
version of the NC Sediment and Erosion Control Manual, or the NC Department of
Transportation Construction and Maintenance Activities Manual, such as sandbags, rock berms,
cofferdams, and other diversion structures shall be used to minimize excavation in flowing
water.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200
12. Application of fertilizer to establish planted/seeded vegetation within disturbed riparian areas
and/or wetlands shall be conducted at agronomic rates and shall comply with all other Federal,
State, and Local regulations. Fertilizer application shall be accomplished in a manner that
minimizes the risk of contact between the fertilizer and surface waters.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200; 15A NCAC 02B
.0231
NORTH raaoJNa
o.o.mm..tme.a...m..�i o..i� /�
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611
919.707.9000
Docusign Envelope ID: 37710E6B-118D-4932-96AB-CC9E5AD58311
149 Chimney Rise Drive — Yard Stabilization Project
DWR# 20210738 V3
Individual Certification #WQC007183
Page 6 of 7
13. If concrete is used during construction, then all necessary measures shall be taken to prevent
direct contact between uncured or curing concrete and waters of the state. Water that
inadvertently contacts uncured concrete shall not be discharged to waters of the state.
Citation: 15A 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200; 15A NCAC 02B .0231
14. All proposed and approved temporary fill and culverts shall be removed, and the impacted area
shall be returned to natural conditions within sixty (60) calendar days after the temporary
impact is no longer necessary. The impacted areas shall be restored to original grade, including
each stream's original cross -sectional dimensions, planform pattern, and longitudinal bed
profile. All temporarily impacted sites shall be restored and stabilized with native vegetation.
Citation: 15A NCAC 02H.0506(b); 15A NCAC 02H .0507(c)
15. All proposed and approved temporary pipes/culverts/rip-rap pads etc. in streams or wetlands
shall be installed as outlined in the most recent edition of the North Carolina Sediment and
Erosion Control Planning and Design Manual or the North Carolina Surface Mining Manual or
the North Carolina Department of Transportation Best Management Practices for Construction
and Maintenance Activities so as not to restrict stream flow or cause dis-equilibrium during use
of this Certification.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
16. Any rip -rap required for proper culvert placement, stream stabilization, or restoration of
temporarily disturbed areas shall be restricted to the area directly impacted by the approved
construction activity. All rip -rap shall be placed such that the original streambed elevation and
streambank contours are restored and maintained and shall consist of clean rock or masonry
material free of debris or toxic pollutants. Placement of rip -rap or other approved materials
shall not result in de -stabilization of the stream bed or banks upstream or downstream of the
area or be installed in a manner that precludes aquatic life passage.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
17. Any rip -rap used for stream or shoreline stabilization shall be of a size and density to prevent
movement by wave, current action, or stream flows, and shall consist of clean rock or masonry
material free of debris or toxic pollutants. Rip -rap shall not be installed in the streambed except
in specific areas required for velocity control and to ensure structural integrity of bank
stabilization measures.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0201
18. All mechanized equipment operated near surface waters shall be inspected and maintained
regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids, or
other toxic materials. Construction shall be staged in order to minimize the exposure of
equipment to surface waters to the maximum extent practicable. Fueling, lubrication, and
general equipment maintenance shall be performed in a manner to prevent, to the maximum
extent practicable, contamination of surface waters by fuels and oils.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200; 15A NCAC 02B
.0231
D_E
NOh 1 r i anRo. iNa
Department at Environmental Puolity
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611
919.707.9000
Docusign Envelope ID: 37710E6B-118D-4932-96AB-CC9E5AD58311
149 Chimney Rise Drive — Yard Stabilization Project
DWR# 20210738 V3
Individual Certification #WQC007183
Page 7 of 7
19. Heavy equipment working in wetlands shall be placed on mats or other measures shall be taken
to minimize soil disturbance and compaction.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 028 .0231
20. In accordance with 143-215.85(b), the Permittee shall report any petroleum spill of 25 gallons or
more; any spill regardless of amount that causes a sheen on surface waters; any petroleum spill
regardless of amount occurring within 100 feet of surface waters; and any petroleum spill less
than 25 gallons that cannot be cleaned up within 24 hours.
Citation: 15A NCAC 02H .0507(c); N.C.G.S 143-215.85(b)
21. The Permittee and their authorized agents shall conduct all activities in a manner consistent
with State water quality standards (including any requirements resulting from compliance with
§303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal
Law.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
22. The Permittee shall require its contractors and/or agents to comply with the terms and
conditions of this Certification in the construction and maintenance of this project, and shall
provide each of its contractors and/or agents associated with the construction or maintenance
of this project with a copy of this Water Quality Certification. A copy of this Water Quality
Certification shall be available at the project site during the construction and maintenance of
this project.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
23. This Water Quality Certification neither grants nor affirms any property right, license, or
privilege in any lands or waters, or any right of use in any waters. This Water Quality
Certification does not authorize any person to interfere with the riparian rights, littoral rights, or
water use rights of any other person and does not create any prescriptive right or any right of
priority regarding any usage of water. This Water Quality Certification shall not be interposed as
a defense in any action respecting the determination of riparian or littoral rights or other rights
to water use. No consumptive user is deemed by virtue of this Water Quality Certification to
possess any prescriptive or other right of priority with respect to any other consumptive user.
This Water Quality Certification shall expire on the same day as the expiration date of the corresponding
Section 404 Permit that is current at the time this Certification is issued. The conditions shall remain in
effect for the life of the project, regardless of the expiration date of this Water Quality Certification.
NORTH raaoJNa
o.o.mm..tme.a...m..�i o..i� /�
This, the 11th day of September 2024
C
DocuSigned by:
83281344CE9EB4A1...
John Hennessy
WQ Regional Operations Section Chief
Division of Water Resources
Department of Environmental Quality
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611
919.707.9000