Loading...
HomeMy WebLinkAboutNCG060453_NOI Insp_20240910 Compliance Inspection Report Permit:NCG060453 Effective: Expiration: Owner: Counter Culture Coffee SOC: Effective: Expiration: Facility: Counter Culture Coffee County: Durham 812 Mallard Ave Region: Raleigh Durham NC 27701 Contact Person:Brian Ludviksen Title: Phone: 919-361-5282 Directions to Facility: take 147 n to exit 11 (NC 55)S Alston Ave, right on to 55, left on Gilbert, right on Neville St,turn left through gate. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 09/10/2024 Entry Time 12:35PM Exit Time: 01:50PM Primary Inspector:Thaddeus W Valentine Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Food/Tobacco/Soaps/Cosmetics/Public Warehousing Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG060453 Owner-Facility:Counter Culture Coffee Inspection Date: 09/10/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: I discussed preventive maintenance and good housekeeping techniques with Cameron Heath and noted to keep dumpsters closed at all times.A new sample point was selected for both outfalls. We moved the sample points upstream one inlet in both drain lines coming from the site. Cameron is going to resubmit the NOI request with those changes made Page 2 of 3 Permit: NCG060453 Owner-Facility:Counter Culture Coffee Inspection Date: 09/10/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ #Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ 0 ❑ Comment: I commented on preventive maintenance and good housekeeping techniques at the unloading dock and about the dumping of product in an open dumpster that spilled out onto the ground. Also noted that dumpsters should remain closed Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? ❑ ❑ 0 ❑ Comment: Discussed Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Discussed Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ #Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? ❑ ❑ 0 ❑ Comment: Viewed the outfalls and changed the sample location for both outfalls. Cameron Heath and I saw that the drop inlets selected are in the roadside curb and therefore will pick up any contaminates from the road and other properties. We chose drop inlets one inlet up teh line from the curb inlets whcih will catch any onsite contaminates and not pick up anything from offsite. Page 3 of 3