Loading...
HomeMy WebLinkAboutSW3240803_As-Built - Calculations_20240906 1110 Navaho Drive, Suite 600, Raleigh, NC 21609 DESIGN AND ENGINEERING SERVICES Phone // 919.322.0115 Web II www.summitde.net SCM Certification Faith Charter School 21-0196.010 CARD Town of Faith, NC ° ° o�2s°°�o,. %e'V ° SEAL ,�30 `� 24627 0 May 30, 2024 APPLICANT: ENGINEER/CONSULTANT: Faith Charter LLC Don Sever,PE c/o Steve Hubrich Summit Design and Engineering 4321 Medical Park Dr Suite 100 3301 Navaho Dr Suite 400 Durham, NC 27704 Raleigh, NC 27609 P(919)471-2885 P(919)732-3883 Steve zhubrchcontractin .com don.sever(Jsummitde.com PROJECT NARRATIVE: Introduction: The majority of the site is a former granite pit, ashlar- rock outcrop complex. This project is to build a charter school (k-6) and extend water and sanitary sewer services. The entrance road off Gardner Street will be curb and gutter, the section along the front of the school has curb and gutter, with the remaining roadway section being 20' pavement with grass swales. Minimal storm drainage systems are proposed. The pipes outlet into the existing rock pits existing in the middle of the site. The soils within the property are ashlar- rock outcrop (95%). A total of 14 acres will be disturbed as part of this project. This project assumes the project will be built in one phase. The area of the soccer field will be a borrow pit, and a second area is identified as a borrow pit if needed. The subdivision is in the Town of Faith's jurisdiction. The Erosion Control Review will be handled by Rowan County. A Stormwater Control Measures (SCM), wet pond, will be built to treat the first 1" of stormwater runoff. 6.66 acres of total area drains to the wet pond, including 2.37 acres of new impervious area. There is a small area of offsite water that is draining onto the site where we can't bypass the flow around the SCM. We have included this area and have considered this to be fully developed as part of our SCM design —CN value. We have used a CN value of 88 for the basin area of 6.6 acres. The point of interest for the site is at the stream crossing under Main Street has a total of 128 acres. A CN value of 70 is used for the pre developed condition. We used a time of concentration of 5 minutes for the SCM and 12.51 minutes for the overall drainage basin. The pond is designed to have the 1 year design storm meet the pre/ post conditions. The attached Hydrograph report shows the results for the design storm and the pre flow is 107 cfs and the post flow is 106 cfs. The post developed drainage maps are showing a future building expansion for a gymnasium. A total of 13,7000 SF of impervious has been included with the pond design. The building area has been pregraded, and storm drainage pipes are located near this expansion. Standard erosion control techniques will be used around the building perimeter at the appropriate time. With this site being an old rock quarry, the original drainage patterns have been altered. The rock pits have established a weir elevation where the water continues through the site to the dual 48" culvert crossing under N. Main Street. The project was approved by COE under SAW 2022-02111 dated Marh 1, 2023. 401 Water Quality Certification was approved on January 9, 2023. Faith Charter School Storm Report SCM Wet Pond Calculations Faith Charter School Storm Report USDA United States A product of the National Custom Soil Resource Department of Cooperative Soil Survey, Agriculture a joint effort of the United Report for \ RCS States Department of Agriculture and other Rowan County, Federal agencies, State Natural agencies including the Resources Agricultural Experiment North C a ro l i n a Conservation Stations, and local Service participants Faith Charter School �.� . 1 Y SS -. i�G - �' f I N It 1� 1 M ii.) ._ .,,..i:i t ..ipT• LI, -. a ' , •i. �i' ti School St YD F • in,IL. ,_.., 0 .1.........1.000 ft ► w L I.- -l'y May 24, 2024 Custom Soil Resource Report Soil Mapto tr, N W W 548200 548403 548600 548800 549W0 549200 549400 549600 549830 35°35'51"N - _ 35°35'51"N 44 ti -"" V.aC _ _ _ , '- a r .'' eeB2!- \i ., .. T - ' ; ‘ ..: • ,.. , slWr - CD -"1 _ fG_ .04 CeB2. . AsC - " / •t rr �- • ? AsB' ��r i •- : 4. ia. Nomow • + PcB2 • 7 ka e ' Ail'Mountain:Id — � 1SBChA As .., i4 IS w f 11,„. Aiif. Ii 1 i1t d , 1r, Ty I RoB f . • c � , `— . (.} " 4 + :y tiI \ i \ � r1I.11- ppe .,, _... _...7.. . r. .1-8I 1'd.A- 1p1-* I, r4 ! -- t • N • RoB ,, I ,ro1 ,. �o' ealllg ate g( ',� -- _ _� *' 35°35'12"N `i" � - 35°35'12"N 548200 548400 548600 548800 549000 549200 549400 549600 5498W 555:35) 3 3 co in .P Map Scale:1:8,480 if printed on A landscape(11"x 8.5")sheet. e Meters N 0 100 200 400 600 $ Feet A 0 400 800 1600 2400 Map projection:Web Mercator Comer coordinates:WG584 Edge tics:UTM Zone 17N WGS84 9 Custom Soil Resource Report Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI AsB Ashlar-Rock outcrop complex,2 41.3 31.9% to 8 percent slopes AsC Ashlar-Rock outcrop complex,8 26.7 20.6% to 15 percent slopes CeB2 Cecil sandy clay loam,2 to 8 3.0 2.3% percent slopes,moderately eroded ChA Chewacla loam,0 to 2 percent 4.9 3.8% slopes,frequently flooded PcB2 Pacolet sandy clay loam,2 to 8 0.0 0.0% percent slopes,moderately eroded RoB Rion-Wedowee-Ashlar 7.7 6.0% complex,2 to 8 percent slopes Uf Urban land 2.7 2.1% VaB Vance sandy loam,2 to 8 26.5 20.5% percent slopes VaC Vance sandy loam,8 to 15 16.6 12.8% percent slopes Totals for Area of Interest 129.5 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different 11 1 Watershed Model Schematic HydraflowHydrographsExtensionforAutodesk®Civil3D®byAutodesk,Inc.v2023 1 -POST v 3-Bypass area 2-asbuilit pond l 6-Pre 4-Post through pond Legend Hyd. Origin Description 1 SCS Runoff POST 2 Reservoir asbuilit pond 3 SCS Runoff Bypass area 4 Combine Post through pond 6 SCS Runoff Pre Project: 2023-08-14 asbuilt.gpw Friday, 05/24/2024 Hydraflow Table of Contents 2023-08-14 asbuilt.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Friday,05/24/2024 Watershed Model Schematic 1 1 - Year Summary Report 2 Hydrograph Reports 3 Hydrograph No. 1, SCS Runoff, POST 3 Hydrograph No. 2, Reservoir, asbuilit pond 4 Pond Report - asbulit pond 5 Hydrograph No. 3, SCS Runoff, Bypass area 6 Hydrograph No. 4, Combine, Post through pond 7 Hydrograph No. 6, SCS Runoff, Pre 8 2 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 14.29 2 722 40,145 POST 2 Reservoir 9.835 2 730 40,104 1 812.72 14,104 asbuilit pond 3 SCS Runoff 101.25 2 722 292,325 Bypass area 4 Combine 105.87 2 722 332,428 2,3 Post through pond 6 SCS Runoff 106.76 2 722 308,217 Pre 2023-08-14 asbuilt.gpw Return Period: 1 Year Friday, 05/24/2024 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Friday,05/24/2024 Hyd. No. 1 POST Hydrograph type = SCS Runoff Peak discharge = 14.29 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 40,145 cuft Drainage area = 6.660 ac Curve number = 88 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 — '- - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Friday,05/24/2024 Hyd. No. 2 asbuilit pond Hydrograph type = Reservoir Peak discharge = 9.835 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 40,104 cuft Inflow hyd. No. = 1 - POST Max. Elevation = 812.72 ft Reservoir name = asbulit pond Max. Storage = 14,104 cuft Storage Indication method used. asbuilit pond Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 iL _ 3.00 — 3.00 0.00 — me. - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 Hyd No. 1 1111111 [ Total storage used = 14,104 cuft Pond Report 5 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Friday,05/24/2024 Pond No. 1 - asbulit pond Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=810.90 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 810.90 4,600 0 0 1.10 812.00 8,400 7,045 7,045 2.10 813.00 11,300 9,813 16,858 3.10 814.00 14,000 12,625 29,483 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 2.00 0.00 0.00 0.00 Crest Len(ft) = 10.00 0.00 0.00 0.00 Span(in) = 2.00 0.00 0.00 0.00 Crest El.(ft) = 812.20 0.00 0.00 0.00 No.Barrels = 1 0 0 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El.(ft) = 810.90 0.00 0.00 0.00 Weir Type = Broad --- --- --- Length(ft) = 64.00 0.00 0.00 0.00 Multi-Stage = No No No No Slope(%) = 6.80 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a No No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/ Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 810.90 0.00 --- --- --- 0.00 --- --- --- --- --- 0.000 1.10 7,045 812.00 0.08 oc --- --- --- 0.00 --- --- --- --- --- 0.084 2.10 16,858 813.00 0.09 oc --- --- --- 18.60 --- --- --- --- --- 18.70 3.10 29,483 814.00 0.10 oc --- --- --- 62.79 --- --- --- --- --- 62.89 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Friday,05/24/2024 Hyd. No. 3 Bypass area Hydrograph type = SCS Runoff Peak discharge = 101.25 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 292,325 cuft Drainage area = 121.400 ac Curve number = 70 Basin Slope = 5.6 % Hydraulic length = 3440 ft Tc method = KIRPICH Time of conc. (Tc) = 12.51 min Total precip. = 2.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Bypass area Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Friday,05/24/2024 Hyd. No. 4 Post through pond Hydrograph type = Combine Peak discharge = 105.87 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 332,428 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 121.400 ac Post through pond Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 • 40.00 20.00 20.00 0.00 � � 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 4 Hyd No. 2 Hyd No. 3 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Friday,05/24/2024 Hyd. No. 6 Pre Hydrograph type = SCS Runoff Peak discharge = 106.76 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 308,217 cuft Drainage area = 128.000 ac Curve number = 70 Basin Slope = 5.6 % Hydraulic length = 3440 ft Tc method = KIRPICH Time of conc. (Tc) = 12.51 min Total precip. = 2.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min)