Loading...
HomeMy WebLinkAboutNCC241627_MODIFICATION Supporting Documents_20240910 (2) CERTIFICATE OF PLAN APPROVAL tE.,..4))&,. , L. ..., ..„,?..//��' ___ _ ''i;3\ ph i ,,<:. - ,,IPRU.I].1T /.�4i " 5:QUAM The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environmental Quality in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted at the primary entrance of the job site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 4B.0127 (b). M121 Replacement, 2023 Raleigh Phase: WAKE-2023-066 Project Name and Location August 30, 2024 WAN # 9eirtow, /(/ Date of Plan Approval Regional Engineer £ D_E Q ?) Certificate of Coverage Number \..r/