Loading...
HomeMy WebLinkAboutNCC242675_Site Plan or Location Map_20240909 O, / ` SIIPP TTSL See Sheet 1A For Index of Sheets STAPI SFATI PRE)SI C I RI I.RI NCI NO I) ,1,,L NI TS o STATE OF I� CAROLINA N.C. TEAGUE LANE 1 - DIVISION OF HIGHWAYS PERIlSO I A PRO NO 0 SC REP ION n4'r otolv FORSYTH COUNTY _ Pt'iJEC ®- ' 'c 7,. ielp PR® BEG,, „ LOCATION: WIDENING OF TEAGUE LANE(SR 2630)FROM ,W- 5 PRO'-QT .1_ ,._,! BEG N HEDGECOCKROAD (SR 2683) TO GLENWATER itik..., 4 73 PRIJECT �,' DRIVE C ' 392 ` �� ° TYPE OF WORK: GRADING, PAVING AND DRAINAGE lTT`I 4 \ 9 ` / quo � C3 398 i VICINITY MAP (NTS) TEAGUE LANE PHASE 1 V FINAL PLANS PD g3 O N CC J 0 O U PI N ZIIII W 0 0 0 END PHASE 1 CONST. —L— STA 60 + 10.22 BEGIN PROJECT s END PROJECT m° —L— STA 121 + 96.90 Q �m —L— STA 4 6 + 2 8.9 V PINE TREE LANE i �o N YU g 4 5 N ui w , -Li, ZIo TEAGUE LANE - TEAGUE LANE �� 10 AT SR I A [p 8) .. > 4 FORD RD 01 -� rc z x ci n A o tii o m m F 0 00 A m w m Z (P (3 n Z —PHASE 1 or — • • A DOCUMENT NOT CONSIDERED FINAL O UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES DESIGN DATA PROJECT LENGTH /e Plans prepared by: HYDRAULICS ENGINEER ADT 2016 = 800 /� SEH of North Carolina PLLC No. P-2372 25 50 0 50 100 ADT 2040 = 14000 SEH 400 Locust Ave, Suite 2, Charlottesville, VA 22902 Criz•04.020RTN-----0,;), IllIlllIll K = % 2018 STANDARD SPECIFICATIONSCPLANSoLENGTH TEAGUE LANE PHASE 1 =0.513 MILES �{ D = 10 �o PE SIGNATURE50 25 0 50 100 T = 2 %* TOTAL LENGTH OF ROADWAY PROJECT= 1.423 MILES RIGHT OF WAY DATE: MICHAEL E.LYONS,P.E.Inhl V = 50 MPH PROJECT ENGINEERROADWAYDESIGNENGINEERPROFILE(HORIZONTAL) *TTST= DUAL Y�w O10 5 0 10 20 FUNC CLASS= LETTING DATE. JONATHAN R. HULTGREN,P.E. \) l l l —\ SUBURBAN BOULEVARD PROJECTDESIGNENGINEER PROFILE VERTICAL TIER PE441.1 . (VERTICAL) SIGNATURE: /A