Loading...
HomeMy WebLinkAboutNCC242773_Site Plan or Location Map_20240909 t1, STATE STATE PROJECT REFERENCE Na 03 Na SHEETS El \ N.C. CATAWBA CRK. GWY. IL TR PROl.N0. APROl.N0. DR9CR�l'ION 274 CITY OF GASTONIA �. BEGIN PROJECT o 279 245J ° o >. rowbo =255 LOCATION: THE GREENWAY WILL EXTEND FROM THE EXISTING ,, Roiake a, Hudson o0 Dam Blvd. GREENWAY NEAR THE HUDSON WOODS APARTMENTS Stilt MITTAL iooi PLANS �� DATE AUGUST 15,2023 ON THE EAST SIDE OF ROBINWOOD ROAD TRAVERSING 255 245J s EAST ALONG THE CATAWBA CREEK AND ENDING AT A m Rd ,(God / Robinwoo, s 1.44 FUTURE CONNECTION TO THE ROBINSON OAKS SUBDIVISION. 1 �. Catawba Creek ill• 3 I TYPE OF WORK: GRADING,PAVING, SAFETY RAIL,RETAINING WALL, 274 i END PROJECT 1 DRAINAGE, SIGNING,AND STRUCTURE 6:_____N\ 2446 r Hearne Hoffman Rd. I vLake Dam / VICINITY MAP / 0 eP _L END IINNECTOR BEGIN BRIDGE ,--. \ y V -CI t2- STA.I0+53+/ -L- STA.24+45.00 _ Zak BEGIN CONNECTOR ^ `° � ,(a CON2 STA.10+05+/ \ - � -LI- STA.2I+77.13 BACK = . - -L- ST A.2/+75.00 AHEAD �� ., "-c s �� ("__-_;_.-S-re .,,i, END BRIDGE �„ r_. L STA.25+93.00 -� END CONNECTOR i -- Lake —FUTURE -CONI- STA.12+28+/ i �� GREENWAY V A ,,,, A v. i1 \ \ , 4 • BEGIN CONNECTOR 00 cS& L•11114 -CONI- STA.10+00+/- � PA',e� A V aLitill (::°0\tO%,-, 'tit' _, ,,,-.7,..., � 7 ":\- /tr'."fi+/ \s ,‘7 `�� INCOMPLETE PLANS O \\ .�. DO NOT USE FOR RI W ACQUISITION t"""4., �'r J� � BEGIN PROJECT END PROJECT PEELIdwAieY PLANS BEGIN PROP, . °EENWAY END /PROP,GREENWAY DO NOT USE FOR CONSTRUCT ON a / �- -L/ STA./ 0.00 -L STA.5.3/OO.00 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED / -o w GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared in the Office of: HYDRAULICS ENGINEER T �� NC FIRM LICENSE No:F-1320 50 25 0 50 100 I b e n e s c h-0REGENCYCARY,PARNC 27KWAY,STE 175 (984) 275-2490 3 U UU90 2018 STANDARD SPECIFICATIONS PLANS �Y LENGTH OF ASPHALT TRAIL = 0.762 MI P.E. SIGNATURE 4,9 0 5L0 25 0 50 100 FUNC CLASS = GREENWAY LENGTH OF STRUCTURE = 0.028 MI RIGHT OF WAY DATE: ERIC D. SPALDING, PE ASTONI LU iillim " iiiiiiiiiiiiii PROJECT ENGINEER ROADWAY DESIGN o m - ENGINEER NC i o 0 PROFILE (HORIZONTAL) TOTAL LENGTH OF PROJECT = 0.790 MI Great Place.Great People.Great Promise. v!0 10 5 0 10 20 LETTING DATE: JODY L. COLE +3 Q O I'I" PROJECT DESIGN ENGINEER !w PROFILE (VERTICAL) FE fA v) N... ../ ` J\ J\ JL J� SIGNATURE. l\ 2�