HomeMy WebLinkAboutNCC242756_(ARPA) DWI Letter of Intent to Fund_20240909 ---::;STATE'0>,,
.-moo ,iy,.v3 6.
ROY COOPER 1 a
Governor --
ELIZABETH S.BISER + L1211� ter '
Secretary *E4'DUAH loto-_
SHADI ESKAF NORTH CAROLINA
Director Environmental Quality
May 23, 2022
David Cheek, Interim City Manager
City of Burlington
PO Box 1358
Burlington NC 27216-1358
Subject: Letter of Intent to Fund
Downtown Sewer Improvements
American Rescue Plan-Earmark
Project No.: SRP-W-ARP-0087
Dear Mr. Cheek:
The Division of Water Infrastructure has reviewed your Request for Funding, and
determined your project is eligible to receive American Rescue Plan (ARP) funding from the
State Fiscal Recovery Fund established in S.L. 2021-180. Projects funded from the State Fiscal
Recovery Fund must meet applicable federal law and guidance for the ARP funds. The ARP
Project Grant will be one hundred percent of eligible project costs up to a maximum of
$6,071,250.
The first milestone is the submittal of a Bid and Design Package by February 1, 2022.
Please note that this intent to fund is contingent on meeting all of the following milestones:
Milestone Date
Apply for all Necessary Permits* ASAP
Bid and Design Package Submittal (obtain all permits) February 1, 2023
Bid and Design Package Approval June 1, 2023
Advertise Project, Receive Bids, Submit Bid Information, October 2, 2023
and Receive Authority To Award
Execute Construction Contract(s) November 1, 2023
Receive last reimbursement- Statutory December 31, 2026
*An engineering alternatives analysis (EAA) may be required on certain projects.
Failure to meet any milestone may result in the forfeiture of funding for the proposed
project.
Note that the Division will make no reimbursements of ARP funds after December 31, 2026
D E Q' North Carolina Department of Environmental Quality I Division of Water Infrastructure
NORTH CAROLINA
OOO 512 N.Salisbury Street 1 1633 Mail Service Center I Raleigh,North Carolina 27699-1633
D partmontalEn.ironmentaio0ai\ � 919.707.9160
David Cheek, Interim City Manager
May 23, 2022
Page 2 of 2
The State Environmental Policy Act exempts projects funded by the State Reserve (such
as this project) from state-mandated environmental review. Federal requirements may still apply.
[NCGS 113A-12(2)h.]
Upon detailed review of the project during the funding process, it may be determined that
portions of your project are not eligible for funding.
US Treasury Requirements
Projects with an expected total cost of ten million dollars or more must meet US Treasury
requirements for prevailing wage rates,project labor agreements, and related requirements.
Recipients can either certify meeting the requirements or provide plans and reports as the SLFRF
Compliance and Reporting Guidance (treasury.gov) specifies.
If you have any questions,please contact Ishwar Devkota by email at
Ishwar.Devkota@ncdenr.gov.
Sincerely,
Jon Risgaard, Chief
State Revolving Fund Section
CC: Todd Lambert, PE, City of Burlington, Burlington,NC
Robert C. Patterson, Jr., PE, City of Burlington, Burlington,NC
Ken Pohlig, PE (DWI, via email)
Ishwar Devkota(DWI, via email)
Mark Hubbard, PE (DWI, via email)
ARP Project File (COM_LOIF)
:=-t,;c STATE a ,,
-moo
ROY COOPER 1 1.
Governor ,
ELIZABETH S.BISER + /�� ter '
Secretary *f#f OUAM lot___
SHADI ESKAF NORTH CAROLINA
Director Environmental Quality
May 23, 2022
Mr. David Cheek, Interim City Manager
City of Burlington
PO Box 1358
Burlington,NC 27216-1358
Subject: Letter of Intent to Fund
Downtown Water Improvements
American Rescue Plan-Earmark
Project No.: SRP-D-ARP-0088
Dear Mr. Cheek:
The Division of Water Infrastructure has reviewed your Request for Funding, and
determined your project is eligible to receive American Rescue Plan (ARP) funding from the
State Fiscal Recovery Fund established in S.L. 2021-180. Projects funded from the State Fiscal
Recovery Fund must meet applicable federal law and guidance for the ARP funds. The ARP
Project Grant will be one hundred percent of eligible project costs up to a maximum of
$3,928,750.
The first milestone is the submittal of a Bid and Design Package by February 1, 2022.
Please note that this intent to fund is contingent on meeting all of the following milestones:
Milestone Date
Apply for all Necessary Permits* ASAP
Bid and Design Package Submittal (obtain all permits) February 1, 2023
Bid and Design Package Approval June 1, 2023
Advertise Project, Receive Bids, Submit Bid Information, October 2, 2023
and Receive Authority To Award
Execute Construction Contract(s) November 1, 2023
Receive last reimbursement- Statutory December 31, 2026
Failure to meet any milestone may result in the forfeiture of funding for the proposed
project.
Note that the Division will make no reimbursements of ARP funds after December 31, 2026
D E Q' North Carolina Department of Environmental Quality I Division of Water Infrastructure
NORTH CAROLINA
OOO 512 N.Salisbury Street 1 1633 Mail Service Center I Raleigh,North Carolina 27699-1633
D p,m.�eoi�a��m.�taio�ai\ � 919.707.9160
Mr. David Cheek, Interim City Manager
May 23, 2022
Page 2 of 2
The State Environmental Policy Act exempts projects funded by the State Reserve (such
as this project) from state-mandated environmental review. Federal requirements may still apply.
[NCGS 113A-12(2)h.]
Upon detailed review of the project during the funding process, it may be determined that
portions of your project are not eligible for funding.
US Treasury Requirements
Projects with an expected total cost of ten million dollars or more must meet US Treasury
requirements for prevailing wage rates,project labor agreements, and related requirements.
Recipients can either certify meeting the requirements or provide plans and reports as the SLFRF
Compliance and Reporting Guidance (treasury.gov) specifies.
Drought Bill Requirements
In accordance with G.S. 143-355.4, a project"for the purpose of extending waterlines or
expanding water treatment capacity"must document numerous requirements during the review
process. You can find additional information at the following link:
http://www.ncleg.net/enactedlegislation/statutes/html/bysection/chapter_143/gs 143-3 5 5.4.html
If you have any questions,please contact Robin Peele, by phone at(919) 707-9056 or by
email at robin.peele@ncdenr.gov.
Sincerely,
Jon Risgaard, Chief
State Revolving Fund Section
CC: Todd Lambert, PE, City of Burlington, Burlington
Robert Patterson„ PE, City of Burlington, Burlington
Michelle McKay(DWI,via email)
Robin Peele (DWI, via email)
Mark Hubbard, PE (DWI, via email)
ARP Project File (COM_LOIF)