Loading...
HomeMy WebLinkAboutSW6240606_Design Calculations (Riprap)_20240830 (10) OUTLET PROTECTION DATE DESIGN PHASE DESIGN 4-10-24 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Village at Rockfish Phase V 2050 REVISION / / LOCATION BY RECORD / / Cumberland County, North Carolina CEK _OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= P0-2 Qio/Qfull = 0.34 Pipe Dia= 15 in V/Vfull = 0.89 Q10= 1.54 cfs V= 3.3 fps Qfull = 4.60 cfs Vfull = 3.74 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in III �•�•�•�•�•� Riprap Class = B ••••••••••• L Apron Thickness = 18 in 010�0�0101 Apron Length 7.5 ft 101, •••••••••••••• Apron Width @ Outlet = 3.75 ft •• •• ••• Apron Width @ End = 8.8 ft Length Storm Outlet Structure FES No.= P0-4 Q1o/Qfull = 0.38 Pipe Dia= 15 in V/Vfull = 0.93 Q10= 1.73 cfs V= 3.4 fps Qfull = 4.55 cfs Vfull = 3.70 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length = 7.5 ft Apron Width @ Outlet = 3.75 ft Apron Width @ End = 8.8 ft Length 2050-Storm drainage.xlsx LATEST REVISION:6/13/2024 12:57 PM PAGE 1 OF 4 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 4-10-24 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Village at Rockfish Phase V 2050 REVISION / / LOCATION BY RECORD / / Cumberland County, North Carolina CEK OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= P0-6 Q1o/Qfull = 0.38 Pipe Dia= 15 in V/Vfull = 0.93 Q10= 1.75 cfs V= 3.5 fps Qfull = 4.57 cfs Vfull = 3.72 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length = 7.5 ft Apron Width @ Outlet = 3.75 ft Apron Width @ End = 8.8 ft L Length 1 Storm Outlet Structure FES No.= P0-9 Q1o/Qfull = 0.50 Pipe Dia= 15 in V/Vfull = 1.00 Q10= 2.61 cfs V= 4.3 fps Qfull = 5.24 cfs Vfull = 4.26 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in •�•�•••••••••• Riprap Class = B •••••••••••••• s Apron Thickness = 18 in 0 •••••••••••••• = �.�.���•�•�•�• -0 Apron Length7.5 ft 10101010:1:1:1 3 Apron Width @ Outlet = 3.75 ft •• •• ••• Apron Width @ End = 8.8 ft Length 2050-Storm drainage.xlsx LATEST REVISION:6/13/2024 12:57 PM PAGE 2 OF 4 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 4-10-24 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Village at Rockfish Phase V 2050 REVISION / / LOCATION BY RECORD / / Cumberland County, North Carolina CEK OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= P0-12 Q1o/Qfull = 0.38 Pipe Dia= 15 in V/Vfull = 0.93 Q10= 3.72 cfs V= 7.4 fps Qfull = 9.73 cfs Vfull = 7.91 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length = 7.5 ft Apron Width @ Outlet = 3.75 ft Apron Width @ End = 8.8 ft L Length 1 Storm Outlet Structure FES No.= P0-15 Q1o/Qfull = 0.49 Pipe Dia= 15 in V/Vfull = 0.99 Q10= 2.67 cfs V= 4.3 fps Qfull = 5.40 cfs Vfull = 4.40 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length = 7.5 ft Apron Width @ Outlet = 3.75 ft Apron Width @ End = 8.8 ft Length 2050-Storm drainage.xlsx LATEST REVISION:6/13/2024 12:57 PM PAGE 3 OF 4 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 4-10-24 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Village at Rockfish Phase V 2050 REVISION / X / LOCATION BY RECORD / X / Cumberland County, North Carolina CEK OTHER / X / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= P0-18 Q1o/Qfull = 0.36 Pipe Dia= 15 in V/Vfull = 0.91 Q10= 4.52 cfs V= 9.3 fps Qfull = 12.52 cfs Vfull = 10.19 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D5o = 10 in DMAX = 15 in Riprap Class = 1 s Apron Thickness = 22.5 in 3 Apron Length = 10.0 ft Apron Width @ Outlet = 3.75 ft Apron Width @ End = 11.3 ft L Length 1 Storm Outlet Structure I FES No.= PIPE 1 OUT Q1o/Qfull = 0.66 Pipe Dia= 30 in V/Vfull = 1.07 Q10= 20.07 cfs V= 6.6 fps Qfull = 30.57 cfs Vfull = 6.22 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D5o = 10 in DMAX = 15 in Riprap Class = 1 s Apron Thickness = 22.5 in 3 Apron Length = 20.0 ft Apron Width @ Outlet = 7.5 ft Apron Width @ End = 22.5 ft Length 2050-Storm drainage.xlsx LATEST REVISION:6/13/2024 12:57 PM PAGE 4 OF 4