Loading...
HomeMy WebLinkAboutSW6240606_Design Calculations (Swales)_20240830 (8) 4D Site Solutions, Inc. DITCH CALCULATIONS NOTE:sheet only set up to handle Tc from 5 min to 30 min A. Flow velocity<2.0 fps when discharging to wetlands B. Flow velocity<4.5 fps all other cases** C. Channel slope<5.0%for curb outlet swales 2050-Village at Rockfish Phase V Rainfall Intensity Storm Event 5-min 10-min 15-min 30-min Runoff Coeff. 10-yr 7.91 6.33 5.34 3.87 Impervious 0.95 25-yr 8.94 7.12 6.01 4.46 Grassed 0.30 50-yr 9.65 7.68 6.49 4.89 100-yr 10.40 8.23 6.94 5.31 Tc Drainage Impervious Grassed Storm Rainfall Ditch No. C Kerby Kirpich Intensity Q(cfs) Area(ac) Area(ac) Area(ac) Event(yr) Total Tc Tc Used (in/hr) L(ft) n s Toy L(ft) S 'FL', 1 0.39 0.30 0.09 0.80 n/a 600.0 0.012 5.90 5.90 5 10-yr 7.91 2.47 2 1.01 0.47 0.54 0.60 n/a 690.0 0.012 6.57 6.57 5 10-yr 7.91 4.79 3 0.46 0.21 0.25 0.60 n/a 650.0 0.012 6.27 6.27 5 10-yr 7.91 2.18 4 1.16 0.54 0.62 0.60 n/a 660.0 0.011 6.56 6.56 5 10-yr 7.91 5.51 5 0.97 0.45 0.52 0.60 n/a 465.0 0.022 3.84 3.84 5 10-yr 7.91 4.60 6 0.96 0.44 0.52 0.60 n/a 540.0 0.016 4.87 4.87 5 10-yr 7.91 4.56 7 1.96 0.75 1.21 0.55 n/a 645.0 0.024 4.78 4.78 5 10-yr 7.91 8.53 printed: 6/13/2024 1:44 PM Page 1 of 1