Loading...
HomeMy WebLinkAboutSW6240607_Design Calculations_20240830 (16) 4D Site Solutions, Inc. PIPE CALCULATIONS NOTE:sheet only set up to handle Tc from 5 min to 30 min A. Cross-pipes to use 25-yr storm inensity 2029-Rolling Springs Section 9 Rainfall Intensity Storm Event 5 in 15-min 10-yr 7.79 6.23 5.25 3.80 25-yr 8.70 6.93 5.86 4.34 50-yr 9.29 7.41 6.25 4.71 100-yr 9.86 7.84 6.61 5.06 Tc Drainage Storm Rainfall Pipe No. C Kerby Kirpich Intensity Q(cfs) Area(ac) Event(yr) Total Tc Tc Used (in/hr) L(ft) n s Toy L(ft) S Tch 1 7.32 0.45 n/a 1230.0 0.058 5.59 5.59 5 25-yr 8.70 28.66 2 2.26 0.45 n/a 700.0 0.045 3.99 3.99 5 25-yr 8.70 8.85 3 4.24 0.45 n/a 820.0 0.043 4.60 4.60 5 25-yr 8.70 16.60 4 0.83 0.50 n/a 430.0 0.056 2.52 2.52 5 25-yr 8.70 3.61 5 0.31 0.45 n/a 185.0 0.029 1.69 1.69 5 25-yr 8.70 1.22 6(PRE) 27.09 0.21 n/a 1920.0 0.044 8.76 8.76 10 25-yr 6.93 39.42 6(POST) 26.98 0.45 n/a 1980.0 0.043 9.08 9.08 10 25-yr 6.93 84.14 7(PRE) 19.73 0.30 n/a 1170.0 0.041 6.15 6.15 5 25-yr 8.70 51.50 7(POST) 19.80 0.40 n/a 1170.0 0.041 6.15 6.15 5 25-yr 8.70 68.90 8(PRE) 5.85 0.35 n/a 670.0 0.052 3.65 3.65 5 25-yr 8.70 17.81 8(POST) 5.85 0.45 n/a 670.0 0.052 3.65 3.65 5 25-yr 8.70 22.90 printed: 8/30/2024 3:49 PM Page 1 of 1