Loading...
HomeMy WebLinkAbout20071559 Ver 2_Information Letter_20071218a µ STATE o ~~~ 4,. ~~ wow vd'~ STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GovExrrox U. S. Army Corps of Engineers Regulatory Field Office Post Office Box 1000 Washington, NC 27889-1000 Mr. David Baker NCDOT Coordinator Dear Sir: Subject: Amendment to Permit Application for Regional General Permit 198200031, the proposed improvements of SR 1323 (Riverview Street) from the intersection of Iotla Street to NC28 in Macon County. TIP R-2408A NCDOT Division 14. Federal Project No. STP-28(1), State Project No. 8.1970801. Reference: NCDOT Permit Application dated September 10, 2007. NCDOT Amendment to Permit Application dated October 5, 2007. Please reference the previous permit application and amendment. Per our conversation on December 4, 2007, attached is the requested information regarding the utility conflicts with this project. It has been discovered that the placement of a new pipe at Site 3 (13+23-Y-1) will conflict with the current sewer line at this location (Sheet 2U). Utility Impact Site 3 (13+ 23-Y-1) The existing 8-inch sewer line currently lies within the footprint of the proposed 73-inch x 55-inch pipe to be placed on NC 28 at Site 3 (Sheet 11 of 13 in Permit Drawings)(Sheet 3U). The sewer line will be relocated slightly downstream and away from the pipe. There will be 0.002 acre of temporary impact due to the relocation of the 8-inch sewer line to UT 2. The new sewer line will be buried beneath the substrate of the stream. All other conditions from the previously submitted permit applications (see reference above) remain valid for this project. December 18, 2007 LYNDO TIPPETT SECRETARY MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 159$ MAIL SERVICE CENTER RALEIGH NC 27699-1598 TELEPHONE: 919-733-3141 FAX: 919-715-1501 WEBSITE: WWW. DOH. DOT. STATE. NC. US LOCATION: PARKER LINCOLN BUILDING 2728 CAPITAL BLVD., SUITE 240 RALEIGH NC Thank you for your assistance with this project. If you have any questions or need additional information, please contact Mr. Jason Dilday at ~ldilday(c~dot.state.nc.us or (919) 715-5535. A copy of this application will also be posted at http://www.ncdot.or /g doh/preconstruct/pe/neu/Permit.html. Sincerely, Gregory J. Thorpe, Ph.D., Environmental Management Director Project Development and Environmental Analysis Branch W/attachment Mr. Brian Wrenn, NCDWQ (5 Copies) Ms. Marella Buncick, USFWS Ms. Marla Chambers, NCWRC Mr. Harold Draper, TVA W/o attachment (see website for attachments) Dr. David Chang, P.E., Hydraulics Mr. Victor Barbour, P.E., Project Services Unit Mr. Greg Perfetti, P.E., Structure Design Mr. Mark Staley, Roadside Environmental Mr. J. B. Setzer, P.E. (Div. 14), Division Engineer Mr. Mark Davis (Div. 14), DEO Mr. Jay Bennett, P.E., Roadway Design Mr. Majed Alghandour, P. E., Programming and TIP Mr. Art McMillan, P.E., Highway Design Mr. Scott McLendon, USACE, Wilmington Ms. Beth Harmon, EEP Mr. Todd Jones, NCDOT External Audit Branch Mr. Steven Brown, P.E., PDEA Project Planning Engineer Page 2 of 2 IMPACT SUM MARY WETLAND IM PACTS SURFACE WATER IMPACTS Site NO. Station From/To Structure SIZe Permanent Fill In Wetlands ac Temp. Fill In Wetlands ac Excavation In Wetlands ac Mechanized Clearing in Wetlands ac Hand Clearing in Wetlands ac Permanent SW _ Impacts ac Temp. SW Impacts ac Exist. Chan. Impacts Permanent ft Exist. Chan Impacts Temp. ft Natural Stream Design ft 1 L 28+05 64" X 43" CMPA <0.01 <0.01 3 4 N/A 2 L 41+58 142" X 91"CMPA 0.01 <0.01 40 48 N/A 3 Y1 13+23 73" X 55" CMPA 0.03 <0.01 124 25 N/A Y1 13+23 8" Sewer line <0.01 6 N/A TOTALS: 0.00 0.00 0.00 0.03 0.01 167 83 0 Bold text denotes revised impact numbers. NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MACON COUNTY R-2408A W BS - 34427.1.1 SHEET 05/31 /06