HomeMy WebLinkAbout20071559 Ver 2_Information Letter_20071218a µ STATE o
~~~
4,.
~~ wow vd'~
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY
GovExrrox
U. S. Army Corps of Engineers
Regulatory Field Office
Post Office Box 1000
Washington, NC 27889-1000
Mr. David Baker
NCDOT Coordinator
Dear Sir:
Subject: Amendment to Permit Application for Regional General Permit
198200031, the proposed improvements of SR 1323 (Riverview Street) from
the intersection of Iotla Street to NC28 in Macon County. TIP R-2408A
NCDOT Division 14. Federal Project No. STP-28(1), State Project No.
8.1970801.
Reference: NCDOT Permit Application dated September 10, 2007.
NCDOT Amendment to Permit Application dated October 5, 2007.
Please reference the previous permit application and amendment. Per our conversation
on December 4, 2007, attached is the requested information regarding the utility conflicts
with this project. It has been discovered that the placement of a new pipe at Site 3
(13+23-Y-1) will conflict with the current sewer line at this location (Sheet 2U).
Utility Impact
Site 3 (13+ 23-Y-1)
The existing 8-inch sewer line currently lies within the footprint of the proposed 73-inch x
55-inch pipe to be placed on NC 28 at Site 3 (Sheet 11 of 13 in Permit Drawings)(Sheet 3U).
The sewer line will be relocated slightly downstream and away from the pipe. There will be
0.002 acre of temporary impact due to the relocation of the 8-inch sewer line to UT 2. The
new sewer line will be buried beneath the substrate of the stream.
All other conditions from the previously submitted permit applications (see reference above)
remain valid for this project.
December 18, 2007
LYNDO TIPPETT
SECRETARY
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
159$ MAIL SERVICE CENTER
RALEIGH NC 27699-1598
TELEPHONE: 919-733-3141
FAX: 919-715-1501
WEBSITE: WWW. DOH. DOT. STATE. NC. US
LOCATION:
PARKER LINCOLN BUILDING
2728 CAPITAL BLVD., SUITE 240
RALEIGH NC
Thank you for your assistance with this project. If you have any questions or need additional
information, please contact Mr. Jason Dilday at ~ldilday(c~dot.state.nc.us or (919) 715-5535.
A copy of this application will also be posted at
http://www.ncdot.or /g doh/preconstruct/pe/neu/Permit.html.
Sincerely,
Gregory J. Thorpe, Ph.D., Environmental Management Director
Project Development and Environmental Analysis Branch
W/attachment
Mr. Brian Wrenn, NCDWQ (5 Copies)
Ms. Marella Buncick, USFWS
Ms. Marla Chambers, NCWRC
Mr. Harold Draper, TVA
W/o attachment (see website for attachments)
Dr. David Chang, P.E., Hydraulics
Mr. Victor Barbour, P.E., Project Services Unit
Mr. Greg Perfetti, P.E., Structure Design
Mr. Mark Staley, Roadside Environmental
Mr. J. B. Setzer, P.E. (Div. 14), Division Engineer
Mr. Mark Davis (Div. 14), DEO
Mr. Jay Bennett, P.E., Roadway Design
Mr. Majed Alghandour, P. E., Programming and TIP
Mr. Art McMillan, P.E., Highway Design
Mr. Scott McLendon, USACE, Wilmington
Ms. Beth Harmon, EEP
Mr. Todd Jones, NCDOT External Audit Branch
Mr. Steven Brown, P.E., PDEA Project Planning Engineer
Page 2 of 2
IMPACT SUM MARY
WETLAND IM PACTS SURFACE WATER IMPACTS
Site
NO.
Station
From/To
Structure
SIZe Permanent
Fill In
Wetlands
ac
Temp. Fill
In Wetlands
ac
Excavation
In Wetlands
ac Mechanized
Clearing
in Wetlands
ac Hand
Clearing
in Wetlands
ac Permanent
SW _
Impacts
ac Temp.
SW
Impacts
ac Exist. Chan.
Impacts
Permanent
ft Exist. Chan
Impacts
Temp.
ft Natural
Stream
Design
ft
1 L 28+05 64" X 43" CMPA <0.01 <0.01 3 4 N/A
2 L 41+58 142" X 91"CMPA 0.01 <0.01 40 48 N/A
3 Y1 13+23 73" X 55" CMPA 0.03 <0.01 124 25 N/A
Y1 13+23 8" Sewer line <0.01 6 N/A
TOTALS: 0.00 0.00 0.00 0.03 0.01 167 83 0
Bold text denotes revised impact numbers.
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
MACON COUNTY
R-2408A
W BS - 34427.1.1
SHEET 05/31 /06