Loading...
HomeMy WebLinkAboutNCG030748_NOI Insp_20240906 Compliance Inspection Report Permit:NCG030748 Effective: Expiration: Owner: Pcx Holding LLC SOC: Effective: Expiration: Facility: PCX Corp. Knightdale Facility County: Wake 370 Spectrum Dr Region: Raleigh Knightdale NC 27545 Contact Person:Doug May Title: Phone: 919-219-3049 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 09/06/2024 Entry Time 10:30AM Exit Time: 11:40AM Primary Inspector:Thaddeus W Valentine Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Technical Assistance Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG030748 Owner-Facility:Pcx Holding LLC Inspection Date: 09/06/2024 Inspection Type:Technical Assistance Reason for Visit: Routine Inspection Summary: This facility operation involves the assembly of metal structure and components. The NCG03 permit covers this type of operation. The COC for this facility can be issued as is Page 2 of 3 Permit: NCG030748 Owner-Facility:Pcx Holding LLC Inspection Date: 09/06/2024 Inspection Type:Technical Assistance Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ #Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ 0 ❑ Comment: NOI inspection for a new project Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? ❑ ❑ 0 ❑ Comment: N/A Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ 0 ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: N/A Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ 0 ❑ #Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? ❑ ❑ 0 ❑ Comment: Outfalls where inspected Page 3 of 3