Loading...
HomeMy WebLinkAboutSW4240402_Supplement-EZ Form_20240905 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Wilderness Reserve Phase 2 2 Project Area(ac) 69.57 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? Low 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: GREG GOTSCH 28 Organization: LAND RESOURCE MANAGEMENT 29 Street address: 118 CHERRY STREET 30 City,State,Zip: BLACK MOUNTAIN,NC 28711 31 Phone number(s): 828-900-8700 32 Email: GREG@LANDRM Certification Statement: certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer wC...0�'''% Signature of Designer 09/05/2024 Seal I Date DRAINAGE AREAS 1 Is this a high density project? No 2 If so,number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so,number of low density drainage areas 1 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LD 1 Vegetated 4 Type of SCM N/A Conveyance 5 Total drainage area(sq ft) 3030866 6 Onsite drainage area(sq ft) 3030866 7 Offsite drainage area(sq ft) 0 8 Total BUA in project(sq ft) 257150 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) 173800 sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 83350 sf 11 Offsite BUA(sq ft) 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) -Sidewalk(sq ft) -Roof(sq ft) -Roadway(sq ft) 83350 sf -Future(sq ft) -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 permitting)(sq ft) 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 9% 19 Design storm(inches) 20 Design volume of SCM(cu ft) 21 Calculation method for design volume ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H.1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per.1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances(H:V) 2 to 1 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 6.91 6 JAre curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s)(%) 8 Bottom width of curb outlet swale(s)(feet) 9 Maximum side slope of curb outlet swale(s)(H:V) 10 Minimum length of curb outlet swale(s)(feet) 11 Are treatment swales used instead of curb outlet swales? 12 Is stormwater released at the edge of the setback as dispersed flow? N/A 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 JAre variations to rule.1003 proposed? No ADDITIONAL INFORMATION 15 Please use this space to provide any additional information about this low density project: Drainage Pervious ,o„,Swale BUA Q Slope V,, V,a,,, Flow depth # Area (ac) area C (cfs) M (fps) (fps) (ft) ac Lac) 1 1.80 022 1.58 0.40 4.81 10.10 15.00 5.54 0.41 2 3.60 0.45 3.15 0.40 7.80 13.70 15.00 6.97 0.35 3 0.40 0.16 024 0.60 1.36 15.00 15.00 426 022 4 0.40 0.16 024 0.60 1.49 15.00 15.00 4.42 023 5 1.40 0.40 1.00 0.50 1 5.02 5.80 15.00 4.09 0.57 6 020 0.05 0.15 0.60 0.70 11.80 15.00 2.85 0.18 7 0.50 0.16 0.34 0.50 1.80 15.00 15.00 4.76 025 8 3.80 0.52 328 0.40 6.82 15.00 15.00 6.91 0.31 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30