Emily,
The culvert was shifted to create a more stable confluence between Black Bear Creek and the swale at the outlet of the new culvert. If we kept the culvert in its existing position, Wetland
R would drain into Black Bear Creek at an outer meander which could compromise restoration structures and create bank erosion issues in the future. Adjusting the location of the culvert/swale
puts the confluence in a riffle.
This change will result in a permanent impact for Wetland R (instead of the listed W29 Temporary) as it will be filled to direct flow through the newly constructed swale. Wetland R is
a low-quality wet ditch.
Jess Waller | Environmental Scientist
O: 828.774.5547 M: 504-913-6238
Pronouns: she/her
From: Dunnigan, Emily E CIV USARMY CESAW (USA) <Emily.E.Dunnigan@usace.army.mil>
Sent: Thursday, September 5, 2024 11:12 AM
To: Jessica Waller <jwaller@wildlandseng.com>; Eric Neuhaus <eneuhaus@wildlandseng.com>; Abigail Vieira <avieira@wildlandseng.com>
Cc: Polizzi, Maria <maria.polizzi@deq.nc.gov>; Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>
Subject: RE: WEI Lower Catawba UMB - Bootstrap (SAW-2021-02691) PCN
Hi Jessica,
Based on the Draft Mitigation plan it looks like some changes were made to that third crossing culvert design. The final plans now have the culvert bypassing Wetland R (0.01 ac). What
is the condition of this wetland and what is the reason for the design change?
Thanks,
Emily Dunnigan
Mitigation Specialist, Regulatory Division
U.S. Army Corps of Engineers, Wilmington District
emily.e.dunnigan@usace.army.mil <mailto:emily.e.dunnigan@usace.army.mil>
(919) 750-7397
From: Jessica Waller <jwaller@wildlandseng.com <mailto:jwaller@wildlandseng.com> >
Sent: Wednesday, September 4, 2024 4:47 PM
To: Dunnigan, Emily E CIV USARMY CESAW (USA) <Emily.E.Dunnigan@usace.army.mil <mailto:Emily.E.Dunnigan@usace.army.mil> >; Eric Neuhaus <eneuhaus@wildlandseng.com <mailto:eneuhaus@wildlandseng.com>
>; Abigail Vieira <avieira@wildlandseng.com <mailto:avieira@wildlandseng.com> >
Subject: [Non-DoD Source] RE: WEI Lower Catawba UMB - Bootstrap (SAW-2021-02691) PCN
Good Afternoon Emily,
Two of the three crossings (internal culvert crossing on Black Bear Creek R1 & external ford crossing on Black Bear Creek R3) are new crossings for existing agricultural activity. Based
on Section 404(f) of the CWA and previous USACE guidance, we propose that these two crossing be considered agriculturally exempt. For reference, this information is detailed in the
Bootstrap Final Mitigation Plan comment response (Emily Dunnigan/Steve Kichefski, USACE #5).
The third crossing (external culvert crossing downstream of Wetland S) will not be proposed as exempt as it was specified as a residential crossing in the Bootstrap Final Mitigation
Plan. Temporary impacts to Wetland R and Wetland S were noted in the submitted NWP27 PCN for construction access and/or culvert tie-ins, though the final culvert placement and associated
grading will fall outside of any existing jurisdictional hydrological features. The existing culvert is 26 ft long, 18” RCP and the new culvert will be 30 ft long, 30” CMP. Please let
me know if this culvert replacement would require a separate permit authorization and how you would like to proceed.
The Bootstrap ORM spreadsheet is attached to this email. The ePCN form would not accept an excel document to be uploaded. If there is a better way to get the ORM spreadsheet to the reviewer
in the future, please let me know.
Thank you,
Jess
Jess Waller | Environmental Scientist
O: 828.774.5547 M: 504-913-6238
Pronouns: she/her
From: Dunnigan, Emily E CIV USARMY CESAW (USA) <Emily.E.Dunnigan@usace.army.mil <mailto:Emily.E.Dunnigan@usace.army.mil> >
Sent: Tuesday, September 3, 2024 4:25 PM
To: Eric Neuhaus <eneuhaus@wildlandseng.com <mailto:eneuhaus@wildlandseng.com> >; Abigail Vieira <avieira@wildlandseng.com <mailto:avieira@wildlandseng.com> >; Jessica Waller <jwaller@wildlandseng.co
m <mailto:jwaller@wildlandseng.com> >
Subject: WEI Lower Catawba UMB - Bootstrap (SAW-2021-02691) PCN
Hi Everyone,
I have a quick question about the Bootstrap PCN
* There are 3 proposed crossings. Is the culvert for the driveway being updated? Are the other two crossings (new ford and new culvert) proposed to be agriculturally exempt?
I didn’t see the ORM upload sheet in the submittal. Please fill in the impacts tab and send back to me, the template is attached.
Thanks,
Emily Dunnigan
Mitigation Specialist, Regulatory Division
U.S. Army Corps of Engineers, Wilmington District
emily.e.dunnigan@usace.army.mil <mailto:emily.e.dunnigan@usace.army.mil>
(919) 750-7397
eveRtcUser" : { "EventFlag" : 512 } } } } } } }, "AtMention" : { "EventFlag" : 512 }, "DocumentActivityIntegration" : { "Events" : { "AddRecoveredActivities" : { "EventFlag" : 512 },
"ProcessAtMentionNotificationsList" : { "EventFlag" : 512 }, "CommentsNotificationCollectorRemovedComments" : { "EventFlag" : 512 }, "ProcessCommentsNotificationsList" : { "EventFlag"
: 512 }, "SaveLogForRecovery" : { "EventFlag" : 512 }, "CreateDocumentActivityLogManager" : { "EventFlag" : 512 }, "DeleteCommentActivity" : { "EventFlag" : 512 }, "DiscardLocalActivities"
: { "EventFlag" : 512 }, "DeleteReplyActivity" : { "EventFlag" : 512 }, "CreateAtMentionActivity" : { "EventFlag" : 512 }, "DeleteAtMentionActivity" : { "EventFlag" : 512 }, "DeleteModernCommentActi
vity" : { "EventFlag" : 512 }, "CreateModernAtMentionActivity" : { "EventFlag" : 512 }, "OpenLogFromRecovery" : { "EventFlag" : 512 }, "DeleteModernReplyActivity" : { "EventFlag" : 512
}, "PdalmDocumentActivityLogManager" : { "EventFlag" : 512 }, "EnsureDocumentActivityCapture" : { "EventFlag" : 2 }, "EnsureLogPreReqs" : { "EventFlag" : 2 }, "MetroOpen" : { "EventFlag"
: 2 }, "CreateUserInfoForAuthor" : { "EventFlag" : 2 }, "CreateUniqueAuthorVector" : { "EventFlag" : 2 }, "CreateUserInfoFromAuthorVector" : { "EventFlag" : 2 }, "IsCloudDocument" :
{ "EventFlag" : 2 }, "SetSavedPreReqs" : { "EventFlag" : 2 }, "CreateRevisionSetActivity" : { "EventFlag" : 2 }, "GetCommentContentIdentifier" : { "EventFlag" : 2 }, "LogCommentAttribution"
: { "EventFlag" : 2 }, "TryCreateLog" : { "EventFlag" : 2 }, "SaveLog" : { "EventFlag" : 2 }, "SetSaved" : { "EventFlag" : 2 }, "AbandonLog" : { "EventFlag" : 2 }, "CreateTaskActivity"
: { "EventFlag" : 2 }, "TaskCreationActivity" : { "EventFlag" : 2 }, "ReassignTaskActivity" : { "EventFlag" : 2 }, "ReopenTaskActivity" : { "EventFlag" : 2 }, "CompleteTaskActivity"
: { "EventFlag" : 2 } } }, "DesktopBackstage" : { "Events" : { "SaveAsRecentClicked" : { "EventFlag" : 512 }, "SaveAsDefaultServiceSelection" : { "EventFlag" : 512 }, "OpenRecentDocumentsViewClicked
" : { "EventFlag" : 2 }, "OpenRecentDocumentsViewWithFeatureEnabledClicked" : { "EventFlag" : 2 }, "BGCalcManagerProcessSetValuesProc" : { "EventFlag" : 2 }, "BGCalcIdleTaskFExecute"
: { "EventFlag" : 2 }, "PlacesGrouperAccountInfo" : { "EventFlag" : 2 }, "GettingStartedMRUSlabGetMruDateTimeGroupType" : { "EventFlag" : 2 }, "OpenRecentLocationsViewClicked" : { "EventFlag"
: 2 } } }, "OfficeSpace" : { "SubNamespaces" : { "DesktopBackstageNavigation" : { "Events" : { "LazyLoadFileCache" : { "EventFlag" : 512 }, "LoadFromFileCache" : { "EventFlag" : 512
}, "SaveIntoFileCache" : { "EventFlag" : 512 }, "ReadThisPCRoot" : { "EventFlag" : 512 }, "ReadLocalFolder" : { "EventFlag" : 512 }, "ReadSiteRootByVroom" : { "EventFlag" : 512 }, "GetItemWebDavUrl"
: { "EventFlag" : 512 }, "GetRemoteItemInformation" : { "EventFlag" : 512 }, "ReadDocLibFolderByVroom" : { "EventFlag" : 256 }, "ReadMigratedODCFolderByVroom" : { "EventFlag" : 256
} } } } }, "PCXPersonaPhoto" : { "EventFlag" : 2 }, "OutSpace" : { "Events" : { "UpdatePlaces" : { "EventFlag" : 2 }, "Create" : { "EventFlag" : 2 }, "Hide" : { "EventFlag" : 2 }, "SetMruListForHome
Page" : { "EventFlag" : 2 }, "Cleanup" : { "EventFlag" : 2 }, "SharedWithMePopulateList" : { "EventFlag" : 2 }, "UpdateMRUItems" : { "EventFlag" : 2 }, "OpenDismiss" : { "EventFlag"
: 2 }, "NewDismiss" : { "EventFlag" : 2 } }, "SubNamespaces" : { "DesktopBackstage" : { "Events" : { "BackstageDismissed" : { "EventFlag" : 2 }, "AutoRecoveryCompareWithUnsavedVersion"
: { "EventFlag" : 2 }, "AutoRecoveryDeleteUnsavedVersion" : { "EventFlag" : 2 }, "AutoRecoveryOpenUnsavedVersion" : { "EventFlag" : 2 }, "AutoRecoveryPopulateUnsavedVersionList" : {
"EventFlag" : 2 }, "InitNewNavFolder" : { "EventFlag" : 2 }, "NewServiceList" : { "EventFlag" : 2 } } } } }, "SharePointSites" : { "Events" : { "GroupsSitesRequestIcon" : { "EventFlag"
: 2 }, "SharePointSitesInitializeSitesCollection" : { "EventFlag" : 2 }, "SharePointSitesProcessResultForIdentity" : { "EventFlag" : 2 }, "SharePointSitesIdentityCacheRequestResult"
: { "EventFlag" : 2 }, "SharePointSitesRequestSitesCached" : { "EventFlag" : 2 }, "SharePointSitesRequestSitesAsyncProcessResult" : { "EventFlag" : 2 }, "SharePointSitesRequestSitesAsync"
: { "EventFlag" : 2 } } }, "CreateLocations" : { "Events" : { "DefaultIdentityEmpty" : { "EventFlag" : 2 } } }, "SharingLegacyClient" : { "Events" : { "GetData" : { "EventFlag" : 2
} } }, "SharedComments" : { "Events" : { "CommentContextChangedAction" : { "EventFlag" : 2 }, "LoadCommentAction" : { "EventFlag" : 2 }, "DispatchCloseViewEvent" : { "EventFlag" : 2
}, "DispatchContextCreatedEvent" : { "EventFlag" : 2 }, "DispatchOpenViewEvent" : { "EventFlag" : 2 }, "DispatchViewChangedEvent" : { "EventFlag" : 2 }, "DispatchBeginDraftEvent" :
{ "EventFlag" : 2 }, "DispatchCapabilitiesChanged" : { "EventFlag" : 2 }, "DispatchCommentsChangedEvent" : { "EventFlag" : 2 }, "DispatchCommentSelectedEvent" : { "EventFlag" : 2 },
"DispatchCreateComment" : { "EventFlag" : 2 }, "DispatchDocChangedEvent" : { "
From: Jessica Waller <jwaller@wildlandseng.com>
Sent: Wednesday, September 4, 2024 4:47 PM
To: Dunnigan, Emily E CIV USARMY CESAW (USA) <Emily.E.Dunnigan@usace.army.mil>; Eric Neuhaus
<eneuhaus@wildlandseng.com>; Abigail Vieira <avieira@wildlandseng.com>
Subject: \[Non-DoD Source\] RE: WEI Lower Catawba UMB - Bootstrap (SAW-2021-02691) PCN
Good Afternoon Emily,
Two of the three crossings (internal culvert crossing on Black Bear Creek R1 & external ford crossing on Black Bear
Creek R3) are new crossings for existing agricultural activity. Based on Section 404(f) of the CWA and previous
USACE guidance, we propose that these two crossing be considered agriculturally exempt. For reference, this
information is detailed in the Bootstrap Final Mitigation Plan comment response (Emily Dunnigan/Steve Kichefski,
USACE #5).
The third crossing (external culvert crossing downstream of Wetland S) will not be proposed as exempt as it was
specified as a residential crossing in the Bootstrap Final Mitigation Plan. Temporary impacts to Wetland R and
Wetland S were noted in the submitted NWP27 PCN for construction access and/or culvert tie-ins, though the final
culvert placement and associated grading will fall outside of any existing jurisdictional hydrological features. The
existing culvert is 26 ft long, 18” RCP and the new culvert will be 30 ft long, 30” CMP. Please let me know if this
culvert replacement would require a separate permit authorization and how you would like to proceed.
The Bootstrap ORM spreadsheet is attached to this email. The ePCN form would not accept an excel document to
be uploaded. If there is a better way to get the ORM spreadsheet to the reviewer in the future, please let me know.
Thank you,
Jess
Jess Waller | Environmental Scientist
O: 828.774.5547 M: 504-913-6238
Pronouns: she/her
From: Dunnigan, Emily E CIV USARMY CESAW (USA) <Emily.E.Dunnigan@usace.army.mil>
Sent: Tuesday, September 3, 2024 4:25 PM
To: Eric Neuhaus <eneuhaus@wildlandseng.com>; Abigail Vieira <avieira@wildlandseng.com>; Jessica Waller
<jwaller@wildlandseng.com>
Subject: WEI Lower Catawba UMB - Bootstrap (SAW-2021-02691) PCN
Hi Everyone,
I have a quick ques?on about the Bootstrap PCN
There are 3 proposed crossings. Is the culvert for the driveway being updated? Are the other two crossings (new
ford and new culvert) proposed to be agriculturally exempt?
I didn’t see the ORM upload sheet in the submi?al. Please fill in the impacts tab and send back to me, the template is
a?ached.
Thanks,
Emily Dunnigan
Mitigation Specialist, Regulatory Division
U.S. Army Corps of Engineers, Wilmington District